Resolved
Granted Condition(s) and Reason (s): 1. The development hereby permitted shall begin before the expiration of three years from the date of this permission. Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2. The development hereby permitted shall be carried out in accordance with the following approved plans/documents: 110 REV C 200 REV A 201 REV B 202 REV B 210 REV B 211 REV B Reason: For the avoidance of doubt and in the interests of proper planning 3. Prior to the commencement of development hereby approved, an Arboricultural Method Statement and Tree Protection Plan prepared in accordance with BS5837:2012 (Trees in relation to design, demolition and construction) setting out how trees shown for retention shall be protected during the construction process, shall be submitted to and approved by the Local Planning Authority. No equipment, machinery or materials for the development shall be taken onto the site until these details have been approved. The works must then be carried out according to the approved details and thereafter retained until competition of the development. Reason: In order to ensure that damage does not occur to trees and hedges during building operations in accordance with saved Policy 99 of the Dacorum Borough Local Plan (2004), Policy CS12 of the Dacorum Borough Core Strategy (2013) and Paragraph 174 of the National Planning Policy Framework (2021). 4. Prior to the commencement of the development hereby permitted details of the foul water drainage system shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details prior to occupation and shall be thereafter retained. Reason: To ensure that the site is subject to an acceptable drainage system serving the development and to prevent flooding by ensuring the satisfactory storage of and disposal of surface water from the site in accordance with Policy CS31 of the Dacorum Borough Core Strategy (2013) and Paragraph 169 of the National Planning Policy Framework (2021). 5. No development (excluding demolition/ground investigations) shall take place above slab level until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details. Reason: To ensure satisfactory appearance to the development and to safeguard the visual character of the area in accordance with Policies CS11 and CS12 of the Dacorum Borough Core Strategy (2013). 6. No development shall take place above slab level until details of proposed sustainability measures within the development shall be submitted to and agreed in ... view the full minutes text for item 5c