Resolved
Granted Condition(s) and Reason (s): 1. The development hereby permitted shall begin before the expiration of three years from the date of this permission. Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2. The development hereby permitted shall be constructed in accordance with the materials specified on the application form. Reason: To make sure that the appearance of the building is suitable and that it contributes to the character of the area in accordance with Policies CS11 and CS12 of the Dacorum Borough Core Strategy (2013). 3. The development hereby permitted shall be carried out in accordance with the following approved plans/documents: 2270/02G; 2270/03G; 2270/04B; 2270/05B. Reason: For the avoidance of doubt and in the interests of proper planning. 4. Prior to the commencement of development hereby approved, an Arboricultural Method Statement and Tree Protection Plan prepared in accordance with BS5837:2012 (Trees in relation to design, demolition and construction) setting out how trees shown for retention shall be protected during the construction process, shall be submitted to and approved by the Local Planning Authority. No equipment, machinery or materials for the development shall be taken onto the site until these details have been approved. The works must then be carried out according to the approved details and thereafter retained until competition of the development. Reason: In order to ensure that damage does not occur to trees and hedges during building operations in accordance with saved Policy 99 of the Dacorum Borough Local Plan (2004), Policy CS12 of the Dacorum Borough Core Strategy (2013) and Paragraph 174 of the National Planning Policy Framework (2021). 5. No development shall take place above slab level until details of biodiversity enhancement measures have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details prior to occupation of the dwelling . Reason: In the interests of improving biodiversity in the Borough and delivering a biodiversity net gain in accordance with paragraph 174 of the National Planning Policy Framework (2021). 6. The dwellings hereby approved shall not be occupied until the Electric Vehicle Charging Points and associated infrastructure has been provided in accordance with drawing 2270/02F. The Electric Vehicle Charging points and associated infrastructure shall thereafter be retained in accordance with the approved details. Reason: To ensure that adequate provision is made for the charging of electric vehicles in accordance with Policies CS8, CS12 and CS29 of the Dacorum Borough Core Strategy (2013) and the Car Parking Standards Supplementary Planning Document (2020). ... view the full minutes text for item 5e