Item5c
Resolved
Granted Condition(s) and Reason (s): 1. The development hereby permitted shall begin before the expiration of three years from the date of this permission. Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2. The development hereby permitted shall be carried out in accordance with the following approved plans: Plans SK-002 Revision B (Location Plan) P030 Revision B (Proposed Site Plan) P130 (Basement and Ground Floor Plan) P131 (First and Second Floor Plan) P230 (Front and Rear Elevation) P231 (Side Elevation and Section) P232 (Street Scene) 5135 .S01 (Foundation Design) 5135 .S02 (Foundation Design) 5135 .S03 (Foundation Design) Reason : For the avoidance of doubt and in the interests of proper planning. 3. No development of the superstructure shall take place until samples of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the local planning authority. These materials should be stored at the application site and retained for inspection by the planning authority. The development shall be carried out in accordance with the approved details. Reason : To make sure that the appearance of the building is suitable and that it contributes to the character of the area in accordance with Policies CS11 and CS12 of the Dacorum Borough Core Strategy (2013). 4. No construction of the superstructure shall take place until full details of both hard and soft landscape works has been submitted to and approved in writing by the Local Planning Authority . These details shall include: - all external hard surfaces within the site; - other surfacing materials; - means of enclosure; - details of existing and proposed site levels; - means of access to the upper garden level and any retaining structures; - details of bin storage facilities; - details of all trees to be retained and the measures for their protection for the duration of construction; - ecological mitigation measures; and - soft landscape works including a planting scheme with the number, size, species and position of trees, plants and shrubs. All tree protection measures shall be erected prior to the commencement of development and shall thereafter be retained for the duration of construction. The planting must be carried out within one planting season of completing the development. Any tree or shrub which forms part of the approved landscaping scheme which within a period of 5 years from planting fails to become established, becomes seriously damaged or diseased, dies or for any reason is removed shall ... view the full minutes text for item 5c
Word for word from the decision Dacorum published for this meeting.
Source: democracy.dacorum.gov.uk