Resolved
Resolved; Granted Condition(s) and Reason(s): 1. The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2. The development hereby permitted shall be constructed in accordance with the materials specified on approved drawing no. 0000-HF-000-00-DR-BC-0006 REV C03. Reason: To make sure that the appearance of the building is suitable and that it contributes to the character of the area in accordance with Policies CS11 and CS12 of the Dacorum Borough Core Strategy (2013). 3. The development hereby permitted shall be carried out in accordance with the following approved plans/documents: 109-48-PA-001 REV A (Site Location Plan); 109-48-PA-002 REV A (Proposed Site Plan); 109-48-PA-003 REV A (Ground Floor Plan); 109-48-PA-007 (Block A Elevations); CHM-D-02 REV D04 (Front Elevation); CHM-D-03 REV D05 (Rear Elevation); CHM-D-04 REV D04 (Side Elevation); 0000-HF-000-00-DR-BC-0002 REV C10 (GA Elevations); 0000-HF-000-00-DR-BC-0001 REV C05 (GA Plans); 0000-HF-000-00-DR-BC-0006 REV C03 (3D Visuals – For materials condition only); AFF_20695_01_Hemel Hempstead Solo Haus_FSS_01 (Fire Strategy Statement); Carbon Emissions Reduction Statement; RSAP Modular Homes Management Plan; Transport Statement by Ridge (September 2021); Planning, Design and Access Statement (September 2021); Landscape Maintenance & Management Specification. Reason: For the avoidance of doubt and in the interests of proper planning. 4. (a) No development (excluding demolition) approved by this permission shall be commenced prior to the submission to, and agreement of the Local Planning Authority of a written preliminary environmental risk assessment (Phase I) report containing a Conceptual Site Model that indicates sources, pathways and receptors. It should identify the current and past land uses of this site (and adjacent sites) with view to determining the presence of contamination likely to be harmful to human health and the built and natural environment. (b) If the Local Planning Authority is of the opinion that the report which discharges condition (a), above, indicates a reasonable likelihood of harmful contamination then no development approved by this permission shall be commenced until a Site Investigation (Phase II environmental risk assessment) report has been submitted to and approved by the Local Planning Authority which includes: (i) A full identification of the location and concentration of all pollutants on this site and the presence of relevant receptors, and; (ii) The results from the application of an appropriate risk assessment methodology. (c) No development approved by this permission (other than that necessary for the discharge of this condition) shall be commenced until a Remediation Method Statement report; if required as a result of (b), above; has ... view the full minutes text for item 5a
Word for word from the decision Dacorum published for this meeting.
Source: democracy.dacorum.gov.uk