25/00581/FUL Demolition of existing buildings and structures, and redevelopment of site for storage or distribution (Use Class B8) purposes, with ancillary offices and associated parking, servicing, access arrangements, landscaping and othe

Approved Committee 1 paper

AI summaryCommittee delegates approval for B8 storage redevelopment of former Hilliers Garden Centre, increasing allowed outdoor storage heights to keep the scheme viable.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeApprovedSubject to LLFA objection being overcome and amended Condition 18
MoneyNot stated
What happens nextOvercome LLFA objectionLead Local Flood Authority objection still to be resolved
Who it affectsHilliers Garden Centre siteFormer garden centre at Leighton Buzzard Road, Hemel Hempstead

What was decided

Planning permission is delegated with a view to approval, subject to the Lead Local Flood Authority objection being overcome, additional drainage conditions, and the revised wording of Condition 18. Report 1.1, 6.1

Condition 18 is amended to permit external storage up to 6 metres in the front yard and 6.75 metres in the rear yard, replacing the earlier 3 metre and 4 metre limits. Report P14, P113, 3.5

The frontage landscaping will be bolstered with semi-mature native trees from Year 1 to screen storage areas from Leighton Buzzard Road. Report 3.6, 4.11

Why

The developer argued the original 3 metre and 4 metre storage height limit would sterilise the yard and make the scheme unviable, and submitted a landscape addendum and visual representations to support taller storage. Report 3.3, 3.4, 4.5

Officers concluded the increased storage heights would not cause significant harm to visual amenity or the Chilterns National Landscape, given existing site context, boundary planting, and proposed landscape improvements. Report 4.10, 4.12, 4.16, 4.17

The view from the Great Gaddesden 057 Public Right of Way and from within the Chilterns National Landscape was tested through Zones of Theoretical Visibility work, and found acceptable. Report 4.6, 4.7, 4.16

What happens next

The Lead Local Flood Authority's outstanding objection must be overcome, with no consequential material changes to the external appearance of the development. Report 1.1, 6.1

Additional drainage conditions required by the Lead Local Flood Authority must be added before formal consent is issued. Report 1.1, 6.1

The development must begin within three years of the date of permission, with all Section 11 conditions and the amended Condition 18 applied. Report P51, P113, 6.1

Options considered

  • Rejected: Retain original Condition 18 with 3 metre and 4 metre storage height limits. Developer argued it would sterilise the yard and make the scheme unviable; further landscape evidence supported a relaxation. Report 3.3, 3.4, 4.10
  • Chosen: Amend Condition 18 to permit 6 metres in the front yard and 6.75 metres in the rear yard, matching the new building height. Officers found the increased heights acceptable on visual amenity and Chilterns National Landscape grounds, given existing site context and proposed landscape screening. Report 3.5, P14, 4.10, 4.12, 4.18

Implications

  • Equalities: A customer of the garden centre raised concerns about a net loss of jobs; the applicant states existing staff will be supported into roles at other garden centres in the chain and the new B8 use retains employment on the site. Report 4.19, 4.21, P46, 4.22
  • Legal: The site is in the Green Belt and just outside the Chilterns National Landscape, triggering duties under Section 85 of the Countryside and Rights of Way Act 2000, with the Chilterns Building Design Guide and saved Policy 34 of the Local Plan also relevant. Report 4.14, 4.15, 4.20
  • Environment and climate: Conditions require an 8 metre buffer zone alongside the River Gade, biodiversity net gain, ecological lighting and construction management plans, and adherence to a Site Waste Management Plan. Report P76, P80, P95, P107, P81
  • Risk: A series of contamination conditions requires a remediation strategy, verification report, long-term monitoring plan, controls on piling and boreholes, and a buffer for unsuspected contamination. Report P55, P65, P68, P70, P72, P74

Who and where

  • The applicant, redeveloping the former Hilliers Garden Centre site for B8 storage and distribution Report 3.1, 4.21
  • Existing garden centre staff, who the applicant says will be supported into roles at other sites Report P46, 4.22
  • Users of the Great Gaddesden 057 and 021 Public Rights of Way, including within the Chilterns National Landscape Report 4.6, 4.16
  • The Lead Local Flood Authority, whose objection must still be overcome Report 1.1, 6.1
  • Hertfordshire County Council as Waste Planning Authority and highways authority Report P81, P82, P94

Timeline

  • Thursday 8th January 2026: Development Management Committee resolves to delegate approval, with removal of published Condition 18 on fire hydrants and a new condition on storage heights. Report 2.1
  • February 2026: Developer submits a Landscape Addendum by Cornus Limited and Accurate Visual Representations by Troopers Hill Limited to support higher storage. Report 3.4, P12
  • Thursday 5th February 2026: Subsequent meeting approves the minutes of the January meeting, with no objection to the storage height condition wording. Report 2.5
  • 2026-03-12: Development Management Committee considers the addendum report and resolves to delegate with a view to approval, with the amended Condition 18. Report 6.1

Plain English for the jargon

  • B8: Use class for storage and distribution, including warehouses.
  • LLFA: Lead Local Flood Authority, the body responsible for surface water drainage matters.
  • CNL: Chilterns National Landscape, formerly the Chilterns Area of Outstanding Natural Beauty.
  • PROW: Public Right of Way, a route the public can use on foot or other means.
  • ZTV: Zone of Theoretical Visibility, a mapping tool showing where a development is likely to be seen from.
  • DMC: Development Management Committee, the council committee that decides planning applications.
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item5d

Resolved

That planning permission be DELEGATED with a VIEW TO APPROVAL . That planning permission be DELEGATED with a view to APPROVAL, subject to overcoming the outstanding objection of the Lead Local Flood Authority, (and there being no consequential material changes to the external appearance of the development), and the conditions set out in Section 11, (with additional drainage conditions as required by the LLFA and amends to condition 18), and subject to the conditions below: Condition(s) and Reason(s): 1. The development hereby permitted shall begin before the expiration of three years from the date of this permission. Reason : To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2. No development (excluding demolition/ground investigations) shall take place until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details. Please do not send materials to the Council offices. Materials should be kept on site and arrangements made with the Planning Officer for inspection. Reason : To ensure satisfactory appearance to the development and to safeguard the visual character of the area in accordance with Policies CS11 and CS12 of the Dacorum Borough Core Strategy (2013). 3. No development approved by this planning permission shall commence until a remediation strategy to deal with the risks associated with contamination of the site in respect of the development hereby permitted, has been submitted to, and approved in writing, by the local planning authority. This strategy will include the following components: 1. A preliminary risk assessment which has identified: - all previous uses; - potential contaminants associated with those uses; - a conceptual model of the site indicating sources, pathways and receptors; - potentially unacceptable risks arising from contamination at the site. 2. A site investigation scheme, based on (1) to provide information for a detailed assessment of the risk to all receptors that may be affected, including those off-site 3. The results of the site investigation and the detailed risk assessment referred to in (2) and, based on these, an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. 4. A verification plan providing details of the data that will be collected in order to demonstrate that the works set out in the remediation strategy in (3) are complete ... view the full minutes text for item 5d Media
Word for word from the decision Dacorum published for this meeting. Source: democracy.dacorum.gov.uk

Follow this further

Built from Dacorum's papers

What the report saysPro

Report to Development Management

Recommendation

1.1That planning permission be DELEGATED with a view to APPROVAL, subject to overcoming the outstanding objection of the Lead Local Flood Authority, (and there being no consequential material changes to the external appearance of the development), and the conditions set out in Section 11, (with additional drainage conditions as required by the LLFA and amends to condition 18 as detailed in this addendum report).

Background

2.1The application was originally presented to Development Management Committee on Thursday 8th January, 2026. A link to the Officer’s Report for that Committee, as well as the Addendum, is attached as Appendix A, outlining the Officer’s recommendation that planning permission be DELEGATED with a view to APPROVAL, subject to overcoming the outstanding objection of the Lead Local Flood Authority, (and there being no consequential material changes to the external appearance of the development), and the conditions set out in Section 11, (with additional drainage conditions as required by the LLFA). This recommendation was agreed, with Members resolving to approve the application, with the removal of the published Condition 18 (fire hydrants). 2.3 During the course of the debate, Members raised concerns relating to the potential visual impact of storing materials in the front and rear yards of the new commercial unit. In order to address these concerns, Officers confirmed that a condition would be attached to the formal planning consent restricting the height of materials stored within these areas in connection with the use of the site.

2.4Officers recommended that the above referenced condition be worded as follows:

‘There shall be no storage of materials on any outdoor part of the site above a height of 3 metres along or within 5 metres of the boundary of the site and 4 metres elsewhere within the site.

Reason: To protect the character and appearance of the street scene and natural beauty of the Chilterns National Landscape, in accordance with Policies CS12 and CS24 of the Dacorum Borough Core Strategy (2013) and the National Planning Policy Framework (2024).’

2.5The above condition wording was agreed with the Chair. Members also raised no objection to the wording of this condition, approving the minutes of the January meeting at the subsequent meeting on Thursday 5th February. The above condition forms Condition 18 of the current planning consent.

3. PROPOSAL

3.1Planning permission is sought to demolish existing buildings and structures and redevelop the site for storage or distribution use, (use class B8), with the application proposing the construction of a large, detached structure, with associated parking, servicing, access and landscaping works.

3.2Members considered the merits of the scheme at Development Management Committee on Thursday 8th January, 2026 and resolved to grant the application.

3.3Following the decision at Development Management Committee, the developer has raised concerns to the wording of Condition 18, indicating that this restriction on the use of the yard for storage purposes would sterilise the yard and make the scheme unviable.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
25/00581/FUL Demolition of existing buildings and structures, and redevelopment of site for storage or distribution (Use Class B8) purposes, with ancillary offices and associated parking, servicing, access arrangements, landscaping and other associated works. Hilliers, Garden Centre, Leighton BuzzarReport 371 KB DownloadRead as text

At this meeting

Whole meeting

On this subject at Dacorum

Search all
  1. 25/00581/FUL Demolition of existing buildings and structures, and redevelopment of site for storage or distribution (Use Class B8) purposes, with ancillary offices and associated parking, servicing, access arrangements, landscaping and otheThis decision
  2. 26/00535/FUL Demolition of outbuildings. Construction of 3 four bedroom detached dwellinghouses and garaging with associated access arrangements Green Bloom Nursery , Chipperfield Road, Bovingdon, Hemel HempsteadApproved
  3. 26/00538/FUL Full planning application for the demolition of existing buildings and structures and construction of 6 dwelling houses with associated access, parking and landscaping. 34 Bourne End Lane, Hemel Hempstead, Hertfordshire, HP1 2RNApproved
  4. 25/01880/MOA Hybrid application (with access details of two main access points from Bulbourne Road and Station Road in Full and the main development on the rest of the site in Outline with all matters reserved) for the demolition of all exiRefused
  5. 25/00581/FUL Demolition of existing buildings and structures, and redevelopment of site for storage or distribution (Use Class B8) purposes, with ancillary offices and associated parking, servicing, access arrangements, landscaping and otheApproved
  6. 24/00782/FUL Demolition of existing buildings and construction of 7 dwellings with associated parking and landscaping. Birchin Grove Farm, Half Moon Lane, Pepperstock, LutonApproved

More from Dacorum Development Management

All decisions
MeetingDecisionOutcome
10 Sep 2026 25/02075/FUL Proposed change of use from 1no. dwellinghouse operating within Use Class C3 to 1no. Small Residential Care Home operating within Use Class C2That planning permission be GRANTED. RECOMMENDATION That planning permission be GRANTED subject to the conditions set... Approved Open
13 Aug 2026 26/01005/FUL Construction of dwelling (self build) and associated landscaping at Land adjacent 25 Peter's Place 25 Peters Place, Northchurch, Berkhamsted, HertfordshireThat planning permission be DELEGATED with a VIEW TO APPROVAL . RECOMMENDATION That planning permission be DELEGATED ... Approved Open
13 Aug 2026 26/00379/FUL Installation of Timpson Key Cutting Kiosk to hardstanding adjacent to Tesco Superstore TESCO, London Road, Tring, HertfordshireThat planning permission be GRANTED. RECOMMENDATION That planning permission be GRANTED. Condition(s) and Reason(s): ... Approved Open
16 Jul 2026 26/00885/FUL Creation of Two Additional Gypsy/Traveller Pitches comprising a single mobile home and Touring Caravan and Construction of a Shared Day Room Land on the North Western side of Green Lane, MarkyateThat planning permission be DELEGATED with a VIEW TO APPROVAL . RECOMMENDATION It is recommended that planning permis... Approved Open
16 Jul 2026 25/01407/ROC Variation of Condition 2 (Approved Plans) attached to planning permission 22/02538/FUL (Replacement Dwelling) allowed on appeal under APP/A1910/W/23/3327060 Frithsden Vineyard, Frithsden Lane, Frithsden, Hemel Hempstead, Hertfordshire, HP1 3DDThat planning permission be GRANTED. RECOMMENDATION That planning permission be GRANTED, subject to the below conditi... Approved Open