Decision That authority be delegated to the Head of Planning to grant permission subject to the prior completion of a Section 106 obligation to address: Access to the land for monitoring and maintenance of the flood storage area and the conditions (and their reasons).
Word for word from the decision Dorset published for this meeting.Source: moderngov.dorsetcouncil.gov.uk
The site is allocated in the North Dorset Local Plan (Policy 21) The Principal Street has planning permission ref - 2/2020/0379/FUL There are no material considerations which would warrant refusal of this application
4.0Table of key planning issues
Issue Conclusion Principle of development The principle of development was agreed through the strategic local plan allocation (Policy 21), the outline application ref - 2/2018/0036/OUT which sought permission for the principal street access points off the B3081 & the B3092 and the detailed application for the Principal Street ref - 2/2020/0379/FUL. Flood Risk The floodplain compensation calculations show that any loss in floodplain capacity due to the principal street can be compensated for on a level for level basis.
Ecology Full surveys have been undertaken and impact upon protected species can be mitigated to avoid significant effects.
5.0Description of Site The site comprises an area of approximately 0.54 hectares, which forms a small section of land within the Strategic Site Allocation – Gillingham Southern Extension (Policy 21). The land abuts the proposed Principal Street junction to the B3092 and is currently made up grassed farmland.
6.0Description of Development The proposal is to form a compensatory flood storage area. This is required in order to compensate for the volume of floodplain lost through the future construction of the Principal Street. The lowered area will have gentle side slopes to the new proposed levels which would be on average 0.6m lower than existing with a maximum depth of 1m. Access to form this area would be gained from the Principal Street site. Floodplain compensation calculations and design have been carried out to ensure that any raised areas within the 100 year, plus (85%) climate change, extent within the site are offset on a level for level basis. The post-development ground levels will provide a total net gain of 721.1m3 in 100 year, plus (85%) climate change, floodplain capacity across the site.
7.0Relevant Planning History
Gillingham Strategic Site Allocation
2/2018/0483/REM - Erect 90 No. dwellings with garages, bin / cycle store, building to house electricity sub-station and associated infrastructure, including play areas and public open space. (Reserved Matters application to determine appearance, landscaping, layout and scale, following the grant of Outline Planning Permission No. 2/2014/0968/OUT). Land to the East of Lodden Lakes New Road Gillingham Dorset. Approved February 2019.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.