CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
East Hertfordshire District Council
Development Management Committee, Thursday 24 March 2011 at 5.30pm

3/10/2214/FP - Demolition of existing footbridge and construction of new vehicle and footbridge at EHDC Car Park, St Andrews Street, Hertford, SG14 1JA for East Herts Council

Approved Committee 2 papers

Development Management Committee approved this item on Thursday 24 March 2011. Below is the council's own wording, with the papers it was decided on.

Item669

Resolved

RESOLVED – that in respect of application 3/10/2214/FP, planning permission be granted subject to the following conditions: 1. Three year time limit (1T12) 2. Approved Plans (2E10) 3515 – 01, HFB /001/A; TH1 3. Programme of archaeological works (2E02) 4. Tree retention and protection (4P05) 5. Prior to the first use of the bridge hereby permitted, details of any gates or similar measures to secure the bridge and prevent general vehicle access into Castle Grounds shall be submitted and as approved by the local planning authority. The development shall thereafter be implemented in accordance with the approved details. Reason: In order to ensure that any measures required to secure the Castle Grounds at night are appropriately designed in the interests of the appearance and character of this part of the Conservation Area and in accordance with Policies ENV3 and BH6 of the adopted East Herts Local Plan 2007. 6. Prior to the commencement of works, detailed drawings of the new ramp to the car park indicating levels, gradient and surface materials shall be provided at scale not less than 1:20. The development shall ... view the full minutes text for item 669.
Word for word from the decision East Hertfordshire published for this meeting. Source: democracy.eastherts.gov.uk

Follow this further

Built from East Hertfordshire's papers

What the report saysPro

Report to Development Management Committee

Recommendation

That planning permission be GRANTED subject to the following conditions:

1. Three year time limit (1T12)

2. Approved Plans (2E10) 3515 – 01, HFB/001/A; TH1

3. Programme of archaeological works (2E02)

4. Tree retention and protection (4P05)

5. Prior to the first use of the bridge hereby permitted, details of any gates or similar measures to secure the bridge and prevent general vehicle access into Castle Grounds shall be submitted and as approved by the local planning authority. The development shall thereafter be implemented in accordance with the approved details.

Reason : In order to ensure that any measures required to secure the Castle Grounds at night are appropriately designed in the interests of the appearance and character of this part of the Conservation Area and in accordance with Policies ENV3 and BH6 of the adopted East Herts Local Plan 2007.

6. Prior to the commencement of works, detailed drawings of the new ramp to the car park indicating levels, gradient and surface materials shall be provided at scale not less than 1:20. The development shall thereafter be implemented in accordance with the approved details.

Reason: In the interests of clarity and to ensure the crossing is satisfactorily designed and usable by wheelchair users and in accordance with policies ENV1 and ENV4 of the adopted East Herts Local Plan 2007.

7. Prior to the commencement of above ground building, details of the timber side panels for the bridge shall be provided and approved in writing by the local planning authority. The development shall thereafter 3/10/2214/FP

be implemented in accordance with the approved details. Reason: In the interests of the appearance and design of the development within the Conservation Area and in accordance with policies ENV1 and BH6 of the adopted East Herts Local Plan 2007.

8. Details of provisions to reuse the existing stone steps either within the development or in the vicinity of the site shall be submitted to and approved in writing by the local planning authority. The development shall thereafter be implemented in accordance with the approved details.

Reason: In the interests of the appearance and design of the development within the Conservation Area and in accordance with policies ENV1 and BH6 of the adopted East Herts Local Plan 2007.

9. Prior to the commencement of works a scheme to provide Flood Compensation measures within the vicinity of the site to a standard of 1 in a 100 year plus climate change shall be submitted and approved in writing by the local planning authority. The bridge soffit level shall be set no lower than 39.25m above ordnance datum (AOD). The development shall thereafter be implemented in accordance with the approved details.

Reason: In the interests of providing mitigation for flooding within the area as part of the development and in accordance with policy ENV19 of the adopted East Herts Local Plan 2007.

Summary of Reasons for Decision

The proposal has been considered with regard to the policies of the Development Plan (East of England Plan May 2008, Hertfordshire County Structure Plan, Minerals Local Plan, Waste Local Plan and the saved policies of the East Herts Local Plan Second Review April 2007), and in particular policies ENV1, ENV4, BH6 and national guidance in PPS1, PPS5 and PPG13. The balance of the considerations having regard to those policies and the other material considerations relevant in this case is that permission should be granted.

(221410FP.TH)

Background

1.1The application site is shown on the attached OS extract. The proposed bridge is at the location of the existing pedestrian only footbridge which crosses the channel of water separating the St Andrews Street Public 3/10/2214/FP

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
3/10/2214/FP: Demolition of existing footbridge and construction of new vehicle and footbridge at EHDC Car Park, St Andrews Street, Hertford, SG14 1JA for East Herts CouncilReport 41 KB DownloadRead as text
PDF
EHDC Car Park St Andrew Street HertfordReport 159 KB Download

At this meeting

Whole meeting
663MinutesOn the agenda 6643/11/0356/PT - Replacement of existing 10m lamppost (612) with new 12.14m lamppost type T2 telecommunication pole, 1no. new equipment cabinet and 1no. metre pillar at Junction of Great Hadham Road and Oriole Way, Bishop's Stortford for Vodafone LtdOn the agenda 6653/11/0160/FP - Construction of access road and erection of 3 no. 2 storey office buildings and 6 no. detached 4 bedroom houses on land at Jeans Lane, Bishop's Stortford, Herts, CM23 2NN for Arlberg Properties LimitedOn the agenda 6663/11/0039/RP - Erection of 11 residential dwellings, including 6 x 4 bedroom units, 2 x 3 bedroom units and 3 x 2 bedroom units with associated landscaping, car parking and private amenity space at Allotment Gardens, Ermine Street, Buntingford, SG9 9AZ for Weston Homes PLCApproved 6673/10/1147/FN - Renewal of planning permission granted under ref 3/07/0935/FP for the demolition of existing light industrial buildings and construction of 182 new residential units with car parking and landscaping at Land off Marshgate Drive, Hertford for Zog 2 LtdAgreed 6683/11/0145/FP - Change of use to equine use - retrospective, at land adjacent to Cottered Road, Thocking for Mrs Amanda BellApproved
6693/10/2214/FP - Demolition of existing footbridge and construction of new vehicle and footbridge at EHDC Car Park, St Andrews Street, Hertford, SG14 1JA for East Herts CouncilThis decision
6703/11/0086/SV - Modify the S106 agreement attached to planning permission 3/06/0314/FP to remove the elderly persons age restriction (defined as being over 50 years of age) at Land at Stocking Hill Lane, Cottered for Darling Homes LLPOn the agenda 6713/10/2213/FP - Erection of 1 no Solar thermal collector on stable roof and erection of 10 kWp ground mount solar PV system at Dassels Bury, Dassels, Braughing, SG11 2RW for Mr Martin SlackApproved 6723/10/2054/FP - Replacement Buntingford Scout Group headquarters at Buntingford Scout Group, Bowling Green Lane, Buntingford, SG9 9BT for Mrs Joanne McNamaraApproved 6733/11/0239/FP - Two storey side extensions and basement with lightwells and guardrails at 35 Burnham Green Road, Tewin, AL6 0NL for Mr Paul SmithApproved 6743/11/0027/FP - Erection of double garage at Daneswood Cottage, Stansted Hill, Perry Green, Much Hadham, SG10 6DT for Mr Malcolm WharmbyApproved 675E/08/0300/A - The unauthorised construction of a rear dormer window affecting a Grade II listed building without listed building consent at White Horse Cottage, Wareside, Ware, SG12 7QXDecided 676Item for Reporting and NotingNoted

On this subject at East Hertfordshire

Search all
  1. 3/10/2214/FP - Demolition of existing footbridge and construction of new vehicle and footbridge at EHDC Car Park, St Andrews Street, Hertford, SG14 1JA for East Herts CouncilThis decision
  2. 3/23/1641/FUL - The demolition of existing buildings and erection of Barn 1: Office accommodation, and 6 units of overnight accommodation (with 14 beds in total) for staff, volunteers and students working on the farm site (class E(g);Decided
  3. 3/15/2235/VAR – Removal of condition 14 (provision of on-site children's play area) of planning permission Ref: 3/10/1147/FN (Demolition of existing light industrial buildings and construction of 182 new residential units) and variation ofAgreed
  4. 3/15/0863/HH – Demolition of existing outbuilding, single storey extensions and raising of roof at Three Lillies Lodge, High Wych Road, High Wych, CM21 OJEDecided
  5. 3/15/0964/FUL – Demolition of the existing buildings and redevelopment to provide a care home (Use Class C2), car parking, landscaping and other associated works at Leaside Depot, Ware, SG12 7QE for Goring Estates Ltd Leaside Depot, Widbury Hill, Ware, SG12 7QEAgreed
  6. 3/15/0348/HH and 3/15/0492/LBC – Single storey rear extension with solar panels following demolition of existing boiler store. Alterations to fenestration and internal alterations at Thatched Cottage, Patmore Heath, Albury, SG11 2LXDecided

More from East Hertfordshire Development Management Committee

All decisions
MeetingDecisionOutcome
12 Aug 2026 3/25/1986/FUL - Erection of 4 x industrial units (use classes E[g], B2 and B8) with associated parking and external works at Buntingford Business Park, Baldock Road, BuntingfordRESOLVED - in accordance with paragraph 6.5.6 of the constitution, Fergus Alexander be permitted to address the Commi... Decided Open
12 Aug 2026 Items for Reporting and NotingRESOLVED – that the following reports be noted: (A) Appeals against refusal of planning permission / non-determinatio... Noted Open
15 Jul 2026 Appointment of Vice-Chair for the 2026/27 civic yearRESOLVED – that Councillor J Thomas be appointed Vice-Chair of the Development Management Committee for the 2026/27 c... Decided Open
15 Jul 2026 Minutes - 15 April 2026RESOLVED – that the Minutes of the meeting held on 15 April 2026, be confirmed as a correct record and signed by the ... Decided Open
15 Apr 2026 Minutes - 11 March 2026RESOLVED – that the Minutes of the meeting held on 11 March 2026, be confirmed as a correct record and signed by the ... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies