3/10/2213/FP - Erection of 1 no Solar thermal collector on stable roof and erection of 10 kWp ground mount solar PV system at Dassels Bury, Dassels, Braughing, SG11 2RW for Mr Martin Slack
ApprovedCommittee2 papers
Development Management Committee approved this item on Thursday 24 March 2011. Below is the council's own wording, with the papers it was decided on.
RESOLVED – that in respect of application 3/10/2213/FP, planning permission be granted subject to the following conditions: 1. Three year time limit (1T12) 2. Approved plans (2E102) ( FM1 , FM2 , FM3 ) 3. Hedge Retention and Protection (4P06) Summary of Reasons for Decision The proposal has been considered with regard to the policies of the Development Plan (East of England Plan May 2008, Hertfordshire County Structure Plan, Minerals Local Plan, Waste Local Plan and the saved policies of the East Herts Local Plan Second Review April 2007), and in particular Policies SD3 , GBC3 , ENV1 , PPS5 ‘Planning for the Historic Environment’, and PPS22 ‘Renewable Energy’. The balance of the considerations having regard to those policies is that permission should be granted.
Word for word from the decision East Hertfordshire published for this meeting.Source: democracy.eastherts.gov.uk
That planning permission be GRANTED subject to the following conditions:
1. Three year time limit (1T12)
2. Approved plans (2E102) (FM1, FM2, FM3)
3. Hedge Retention and Protection (4P06)
Summary of Reasons for Decision
The proposal has been considered with regard to the policies of the Development Plan (East of England Plan May 2008, Hertfordshire County Structure Plan, Minerals Local Plan, Waste Local Plan and the saved policies of the East Herts Local Plan Second Review April 2007), and in particular Policies SD3, GBC3, ENV1, PPS5 ‘Planning for the Historic Environment’, and PPS22 ‘Renewable Energy’. The balance of the considerations having regard to those policies is that permission should be granted.
(221310FP.FM)
Background
1.1The application site is located within the Rural Area beyond the Green Belt within the Category 3 Village of Dassels as shown on the attached OS extract. Dassels Bury is a Grade II Listed property, set in spacious, open grounds.
1.2The application proposes the erection of 1 no. solar thermal collector on an existing stable roof and also the erection of 10kWp of ground mounted solar panels within a field to the south east of the listed building.
1.3The proposed solar thermal collector panel would be sited on the south elevation of an existing stable block which is located 50 metres to the 3/10/2213/FP
north east of the main Grade II Listed dwellinghouse. The proposed solar collector would have an area of 2 square metres and would supply hot water to the existing stables to facilitate the washing of the horses.
1.4This application also proposes the erection of 10kWp of ground mounted solar panels. The proposed solar panels would be sited along the northern boundary of an existing field (but facing south), some 60 metres to the south of the main dwellinghouse. The proposed solar panels would measure 21.25 metres wide and 2.9 metres in depth. The array frame would hold 2 rows of 21 panels and would have an approximate height of 1.97 metres above ground level, sited behind open fencing and deciduous hedging. The proposed solar panels would be used in conjunction with the main dwellinghouse and will help to reduce its grid electricity use.
2.0Site History:
2.1The site has an extensive planning history which can briefly be summarised as follows:
3/06/0382/FP Erection of field shelter Approved with Conditions 21-Apr-2006
3/02/2015/FP 2storey extension to main house, Approved with new stables in place of existing, Conditions new outbuildings in place of 22-Apr-2003 existing, new entrance gate and brick pier and increase in width of access. 3/00/0238/FP Construction of manege 40 metres Approved with x 20 metres with post and rail Conditions fencing. 28-Mar-2000 3/99/1782/FP Erection of stable barn and garage; Refused 17-Jan-2000 conversion of outbuilding to grooms unit and construction of manege.
3.0Consultation Responses:
3.1There are no statutory consultees in this case and therefore no representations received. 3/10/2213/FP
4.0Parish Council Representations:
4.1No representations have been received from Braughing Parish Council at the time of writing this report.
5.0Other Representations:
5.1The application has been advertised by way of press notice, site notice and neighbour notification.
5.2No letters of representation have been received.
6.0Policy:
6.1The main policies relevant to this application are East Herts Local Plan Second Review April 2007 policies:
SD3 Renewable Energy GBC2 The Rural Area beyond the Green Belt GBC3 Appropriate Development in the Rural Area beyond the Green Belt ENV1 Design and Environmental Quality
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
3/10/2213/FP: Erection of 1 no Solar thermal collector on stable roof and erection of 10 kWp ground mount solar PV system at Dassels Bury, Dassels, Braughing, SG11 2RW for Mr Martin SlackReport
6713/10/2213/FP - Erection of 1 no Solar thermal collector on stable roof and erection of 10 kWp ground mount solar PV system at Dassels Bury, Dassels, Braughing, SG11 2RW for Mr Martin SlackThis decision
Follow Development Management Committee at East Hertfordshire and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.