3/10/2213/FP - Erection of 1 no Solar thermal collector on stable roof and erection of 10 kWp ground mount solar PV system at Dassels Bury, Dassels, Braughing, SG11 2RW for Mr Martin Slack

Approved Committee 2 papers

Development Management Committee approved this item on Thursday 24 March 2011. Below is the council's own wording, with the papers it was decided on.

Item671

Resolved

RESOLVED – that in respect of application 3/10/2213/FP, planning permission be granted subject to the following conditions: 1. Three year time limit (1T12) 2. Approved plans (2E102) ( FM1 , FM2 , FM3 ) 3. Hedge Retention and Protection (4P06) Summary of Reasons for Decision The proposal has been considered with regard to the policies of the Development Plan (East of England Plan May 2008, Hertfordshire County Structure Plan, Minerals Local Plan, Waste Local Plan and the saved policies of the East Herts Local Plan Second Review April 2007), and in particular Policies SD3 , GBC3 , ENV1 , PPS5 ‘Planning for the Historic Environment’, and PPS22 ‘Renewable Energy’. The balance of the considerations having regard to those policies is that permission should be granted.
Word for word from the decision East Hertfordshire published for this meeting. Source: democracy.eastherts.gov.uk

Follow this further

Built from East Hertfordshire's papers

What the report saysPro

Report to Development Management Committee

Recommendation

That planning permission be GRANTED subject to the following conditions:

1. Three year time limit (1T12)

2. Approved plans (2E102) (FM1, FM2, FM3)

3. Hedge Retention and Protection (4P06)

Summary of Reasons for Decision

The proposal has been considered with regard to the policies of the Development Plan (East of England Plan May 2008, Hertfordshire County Structure Plan, Minerals Local Plan, Waste Local Plan and the saved policies of the East Herts Local Plan Second Review April 2007), and in particular Policies SD3, GBC3, ENV1, PPS5 ‘Planning for the Historic Environment’, and PPS22 ‘Renewable Energy’. The balance of the considerations having regard to those policies is that permission should be granted.

(221310FP.FM)

Background

1.1The application site is located within the Rural Area beyond the Green Belt within the Category 3 Village of Dassels as shown on the attached OS extract. Dassels Bury is a Grade II Listed property, set in spacious, open grounds.

1.2The application proposes the erection of 1 no. solar thermal collector on an existing stable roof and also the erection of 10kWp of ground mounted solar panels within a field to the south east of the listed building.

1.3The proposed solar thermal collector panel would be sited on the south elevation of an existing stable block which is located 50 metres to the 3/10/2213/FP

north east of the main Grade II Listed dwellinghouse. The proposed solar collector would have an area of 2 square metres and would supply hot water to the existing stables to facilitate the washing of the horses.

1.4This application also proposes the erection of 10kWp of ground mounted solar panels. The proposed solar panels would be sited along the northern boundary of an existing field (but facing south), some 60 metres to the south of the main dwellinghouse. The proposed solar panels would measure 21.25 metres wide and 2.9 metres in depth. The array frame would hold 2 rows of 21 panels and would have an approximate height of 1.97 metres above ground level, sited behind open fencing and deciduous hedging. The proposed solar panels would be used in conjunction with the main dwellinghouse and will help to reduce its grid electricity use.

2.0Site History:

2.1The site has an extensive planning history which can briefly be summarised as follows:

3/06/0382/FP Erection of field shelter Approved with Conditions 21-Apr-2006

3/02/2015/FP 2storey extension to main house, Approved with new stables in place of existing, Conditions new outbuildings in place of 22-Apr-2003 existing, new entrance gate and brick pier and increase in width of access. 3/00/0238/FP Construction of manege 40 metres Approved with x 20 metres with post and rail Conditions fencing. 28-Mar-2000 3/99/1782/FP Erection of stable barn and garage; Refused 17-Jan-2000 conversion of outbuilding to grooms unit and construction of manege.

3.0Consultation Responses:

3.1There are no statutory consultees in this case and therefore no representations received. 3/10/2213/FP

4.0Parish Council Representations:

4.1No representations have been received from Braughing Parish Council at the time of writing this report.

5.0Other Representations:

5.1The application has been advertised by way of press notice, site notice and neighbour notification.

5.2No letters of representation have been received.

6.0Policy:

6.1The main policies relevant to this application are East Herts Local Plan Second Review April 2007 policies:

SD3 Renewable Energy GBC2 The Rural Area beyond the Green Belt GBC3 Appropriate Development in the Rural Area beyond the Green Belt ENV1 Design and Environmental Quality

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
3/10/2213/FP: Erection of 1 no Solar thermal collector on stable roof and erection of 10 kWp ground mount solar PV system at Dassels Bury, Dassels, Braughing, SG11 2RW for Mr Martin SlackReport 42 KB DownloadRead as text
PDF
Dassels Bury Dassels Braughing WareReport 113 KB Download

At this meeting

Whole meeting
663MinutesOn the agenda 6643/11/0356/PT - Replacement of existing 10m lamppost (612) with new 12.14m lamppost type T2 telecommunication pole, 1no. new equipment cabinet and 1no. metre pillar at Junction of Great Hadham Road and Oriole Way, Bishop's Stortford for Vodafone LtdOn the agenda 6653/11/0160/FP - Construction of access road and erection of 3 no. 2 storey office buildings and 6 no. detached 4 bedroom houses on land at Jeans Lane, Bishop's Stortford, Herts, CM23 2NN for Arlberg Properties LimitedOn the agenda 6663/11/0039/RP - Erection of 11 residential dwellings, including 6 x 4 bedroom units, 2 x 3 bedroom units and 3 x 2 bedroom units with associated landscaping, car parking and private amenity space at Allotment Gardens, Ermine Street, Buntingford, SG9 9AZ for Weston Homes PLCApproved 6673/10/1147/FN - Renewal of planning permission granted under ref 3/07/0935/FP for the demolition of existing light industrial buildings and construction of 182 new residential units with car parking and landscaping at Land off Marshgate Drive, Hertford for Zog 2 LtdAgreed 6683/11/0145/FP - Change of use to equine use - retrospective, at land adjacent to Cottered Road, Thocking for Mrs Amanda BellApproved 6693/10/2214/FP - Demolition of existing footbridge and construction of new vehicle and footbridge at EHDC Car Park, St Andrews Street, Hertford, SG14 1JA for East Herts CouncilApproved 6703/11/0086/SV - Modify the S106 agreement attached to planning permission 3/06/0314/FP to remove the elderly persons age restriction (defined as being over 50 years of age) at Land at Stocking Hill Lane, Cottered for Darling Homes LLPOn the agenda
6713/10/2213/FP - Erection of 1 no Solar thermal collector on stable roof and erection of 10 kWp ground mount solar PV system at Dassels Bury, Dassels, Braughing, SG11 2RW for Mr Martin SlackThis decision
6723/10/2054/FP - Replacement Buntingford Scout Group headquarters at Buntingford Scout Group, Bowling Green Lane, Buntingford, SG9 9BT for Mrs Joanne McNamaraApproved 6733/11/0239/FP - Two storey side extensions and basement with lightwells and guardrails at 35 Burnham Green Road, Tewin, AL6 0NL for Mr Paul SmithApproved 6743/11/0027/FP - Erection of double garage at Daneswood Cottage, Stansted Hill, Perry Green, Much Hadham, SG10 6DT for Mr Malcolm WharmbyApproved 675E/08/0300/A - The unauthorised construction of a rear dormer window affecting a Grade II listed building without listed building consent at White Horse Cottage, Wareside, Ware, SG12 7QXDecided 676Item for Reporting and NotingNoted

More from East Hertfordshire Development Management Committee

All decisions
MeetingDecisionOutcome
12 Aug 2026 3/25/1986/FUL - Erection of 4 x industrial units (use classes E[g], B2 and B8) with associated parking and external works at Buntingford Business Park, Baldock Road, BuntingfordRESOLVED - in accordance with paragraph 6.5.6 of the constitution, Fergus Alexander be permitted to address the Commi... Decided Open
12 Aug 2026 Items for Reporting and NotingRESOLVED – that the following reports be noted: (A) Appeals against refusal of planning permission / non-determinatio... Noted Open
15 Jul 2026 Appointment of Vice-Chair for the 2026/27 civic yearRESOLVED – that Councillor J Thomas be appointed Vice-Chair of the Development Management Committee for the 2026/27 c... Decided Open
15 Jul 2026 Minutes - 15 April 2026RESOLVED – that the Minutes of the meeting held on 15 April 2026, be confirmed as a correct record and signed by the ... Decided Open
15 Apr 2026 Minutes - 11 March 2026RESOLVED – that the Minutes of the meeting held on 11 March 2026, be confirmed as a correct record and signed by the ... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies