Resolved
RESOLVED – that in respect of application 3/12/0495/FP, planning permission be granted subject to the conditions detailed in the report now submitted.
Development Management Committee decided this item on Wednesday 20 June 2012. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED – that in respect of application 3/12/0495/FP, planning permission be granted subject to the conditions detailed in the report now submitted.
That planning permission be GRANTED subject to the following conditions:
1. Three year time limit (1T12)
2. Approved plans (2E10) (Insert: CHQ.12.9914-01; CHQ.12.9914-02; CHQ.12.9914-04; CHQ.12.9914-07; CHQ.12.9914-09; CHQ.12.9914-11; CHQ.12.9914-19A; CHQ.12.9914-20; CHQ.12.9914-21; CHQ.12.9914- 22; CHQ.12.9914-23)
Summary of Reasons for Decision
The proposal has been considered with regard to the policies of the Development Plan (East of England Plan May 2008, Hertfordshire County Structure Plan, Minerals Local Plan, Waste Local Plan and the ’saved’ policies of the East Herts Local Plan Second Review April 2007 and in particular policy ENV1) and the National Planning Policy Framework. The balance of the considerations having regard to those policies is that permission should be granted.
(049512FP.SE)
1.1The site is shown on the attached OS extract. It lies on the western periphery of the settlement of Bishop’s Stortford, within the Bishop’s Park Centre.
1.2This application includes the erection of two timber walls for signage in the southern part of the site. One wall is proposed to the rear of the recycling centre. It is 12 metres in length and of individual timber uprights in a convex semi-circular shape at a maximum height of 1.8 metres. A ‘Recycling’ sign with a recycling emblem is proposed to be 3/12/0495/FP
sited within the wall measuring 2.7 metres in height and 1.8 metres in width. The second wall is proposed to be located to the south western corner of the supermarket building at the exit of the fuel station. It is also 12 metres in length and of individual timber uprights in a convex semi- circular shape, but will be slightly larger at a maximum height of 2.2 metres. A ‘Hello’ sign with a recycling emblem is proposed within the wall measuring 3 metres in height and 1.8 metres in width.
1.3This application also includes a single storey side extension to the eastern elevation of the store. The extension would have a triangular plan form, measuring 21m2, projecting from the main building. In combination with the development of the extension, this proposal also includes the removal of the existing ATM machines that are sited within the wall on the eastern elevation of the building, and the development of an ATM pod attached to the extension within a pedestrian area adjacent to the main entrance. The pod holds two ATMs and would measure 2.8 metres by 3 metres and at a height of 2.4 metres.
1.4All of the existing covered trolley bays are proposed to be replaced with new timber covered trolley bays. Two new covered trolley bays are also proposed. One of the new trolley bays is proposed in replacement of an existing disabled parking bay. The other forms a double trolley bay and is sited adjacent to the proposed extension and ATM pod at the entrance of the store.
1.5Finally, this application proposes a new timber larch external façade to the front elevation of the store to the right hand side of the main entrance. This new façade incorporates a “Hello” sign and measures 3.55 metres in width and 2.63 metres in height.
1.6It is noted from a recent site visit that all of the above works, apart from the proposed extension, have been completed.
2.0Site History:
2.1There is a long planning history related to this site, but the most relevant are as follows:
• 3/07/1058/FP – Relocation of new ATM enclosure and emergency exit (Approved). • 3/08/1514/FP – Installation of 1 no covered trolley bay within existing car park (Approved). 3/12/0495/FP
3.0Consultation Responses:
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
3/12/0495/FP: Single storey extension, 2 x timber walls for signage, 1x larch timber slatted 'hello' wall, new ATM pod and removal of existing ATMs. Replacement timber trolley bays, including 2 new bays at Tesco Stores, Bishop's Park Centre, Lancaster Way, Bishop's Stortford for Tesco Stores Ltd PDReport | 36 KB | DownloadRead as text |
PDF |
3120495FP PlanReport | 232 KB | Download |
Follow Development Management Committee at East Hertfordshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 12 Aug 2026 | 3/25/1986/FUL - Erection of 4 x industrial units (use classes E[g], B2 and B8) with associated parking and external works at Buntingford Business Park, Baldock Road, BuntingfordRESOLVED - in accordance with paragraph 6.5.6 of the constitution, Fergus Alexander be permitted to address the Commi... | Decided | Open |
| 12 Aug 2026 | Items for Reporting and NotingRESOLVED – that the following reports be noted: (A) Appeals against refusal of planning permission / non-determinatio... | Noted | Open |
| 15 Jul 2026 | Appointment of Vice-Chair for the 2026/27 civic yearRESOLVED – that Councillor J Thomas be appointed Vice-Chair of the Development Management Committee for the 2026/27 c... | Decided | Open |
| 15 Jul 2026 | Minutes - 15 April 2026RESOLVED – that the Minutes of the meeting held on 15 April 2026, be confirmed as a correct record and signed by the ... | Decided | Open |
| 15 Apr 2026 | Minutes - 11 March 2026RESOLVED – that the Minutes of the meeting held on 11 March 2026, be confirmed as a correct record and signed by the ... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.