Resolved
RESOLVED – that, in respect of application 3/14/0094/OP, planning permission be refused for the reasons detailed in the report now submitted.
Development Management Committee refused this item on Wednesday 30 April 2014. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED – that, in respect of application 3/14/0094/OP, planning permission be refused for the reasons detailed in the report now submitted.
That planning permission be REFUSED for the following reason:-
1. The proposed development, by reason of the elevated position of the site above Green End and the physical alterations necessary to the frontage of the site, would appear unduly prominent in the street scene and wider landscape, and would fail to preserve or enhance the character and appearance of the Braughing Conservation Area contrary to policies ENV1, BH6 and GBC14 of the East Herts Local Plan Second Review April 2007, and Sections 7 and 12 of the National Planning Policy Framework.
Summary of Reasons for Decision In accordance with the Town and Country Planning (Development Management Procedure) (England) Order 2012 (as amended). East Herts Council has considered, in a positive and proactive manner, whether the planning objections to this proposal could be satisfactorily resolved within the statutory period for determining the application. However, for the reasons set out in this decision notice, the proposal is not considered to achieve an acceptable and sustainable development in accordance with the Development Plan and the National Planning Policy Framework.
(009414OP.HI)
1.1The application site is shown on the attached OS extract and comprises 0.72 hectares of vacant land located to the north of Green End and outside the village boundary. To the north of the site is an access track with open fields beyond, to the east is the B1368 road with the Pound Close development opposite, to the south is neighbouring residential land, and to the west is Green End Farm. There is a public footpath (Footpath 1) that runs along the southern boundary of the site with steps connecting to the B1368. The site rises steeply from east to west with a 3/14/0094/OP
maximum height difference of 8m, and includes a raised bank adjacent to the road (approximately 1m higher) with a hawthorn hedge on top. The site comprises of mostly unmanaged grassland, scrub vegetation and tree/hedge screening along its boundaries.
1.2The site was apparently formerly used for agricultural purposes and the applicant has made reference to the remains of a previous structure and hard-standing on site, but this has blended into the landscape. Officers therefore consider the site to be greenfield. The application is in outline form with all matters reserved, except for access, for up to 10 dwellings with a new access to the B1368. Although layout is a reserved matter, two indicative layout options have been submitted to indicate how the proposed development could be achieved. A parameters plan has also been submitted to inform the design of any subsequent reserved matters application. The application is accompanied by a Planning, Design and Access Statement, a Landscape Appraisal, Tree Survey, Transport Assessment, Surface Water Drainage Assessment, Utility Report, and Habitat Survey.
2.0Site History
2.1There is no planning history in relation to this site. Reference is made in this report to a number of other recent developments in Braughing, including Pound Close – a development of 17 dwellings on land south of Gravelly Lane opposite the site (3/09/01730/FP), 27 new dwellings at Pentlows Farm (3/11/2209/FP), and 2 new dwellings currently under construction at no. 50 Green End.
3.0Consultation Responses
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
3/14/0094/OP: Outline planning application for a development of up to 10 dwellings with all matters reserved except highway access onto Green End (B1368) on Land East of Green End Farm, Green End, Braughing, SG11 2PG for The Fairfield PartnershipReport | 214 KB | DownloadRead as text |
PDF |
3140094OP PlanReport | 143 KB | Download |
Follow Development Management Committee at East Hertfordshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 12 Aug 2026 | 3/25/1986/FUL - Erection of 4 x industrial units (use classes E[g], B2 and B8) with associated parking and external works at Buntingford Business Park, Baldock Road, BuntingfordRESOLVED - in accordance with paragraph 6.5.6 of the constitution, Fergus Alexander be permitted to address the Commi... | Decided | Open |
| 12 Aug 2026 | Items for Reporting and NotingRESOLVED – that the following reports be noted: (A) Appeals against refusal of planning permission / non-determinatio... | Noted | Open |
| 15 Jul 2026 | Appointment of Vice-Chair for the 2026/27 civic yearRESOLVED – that Councillor J Thomas be appointed Vice-Chair of the Development Management Committee for the 2026/27 c... | Decided | Open |
| 15 Jul 2026 | Minutes - 15 April 2026RESOLVED – that the Minutes of the meeting held on 15 April 2026, be confirmed as a correct record and signed by the ... | Decided | Open |
| 15 Apr 2026 | Minutes - 11 March 2026RESOLVED – that the Minutes of the meeting held on 11 March 2026, be confirmed as a correct record and signed by the ... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.