CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
East Hertfordshire District Council
Development Management Committee, Wednesday 24 June 2015 at 7.00pm

3/15/0564/OP – Outline planning permission for the demolition of existing buildings and erection of 4 no 4 bedroomed dwellings at Ideal Farm, Braughing Friars, SG11 2NR for 2 Agriculture Ltd

Decided Committee 3 papers

Development Management Committee decided this item on Wednesday 24 June 2015. Below is the council's own wording, with the papers it was decided on.

Item109

Resolved

RESOLVED – that in respect of application 3/15/0564/OP , planning permission be granted subject to the conditions detailed in the report now submitted.
Word for word from the decision East Hertfordshire published for this meeting. Source: democracy.eastherts.gov.uk

Follow this further

Built from East Hertfordshire's papers

What the report saysPro

Report to Development Management Committee

Recommendation

That outline planning permission be GRANTED subject to the following conditions:

1. Outline permission time limit (1T03)

2. Outline – submission of details (2E01)

3. Approved Plans (2E10)

4. No development shall take place, including any works of demolition, until a Construction Method Statement shall be submitted to, and approved in writing by, the Local Planning Authority. The approved Statement shall be adhered to throughout the construction process and shall provide for:

a. Details of works for demolition, remediation and clean-up of the site; b. Methods for accessing the site, including construction vehicle numbers and routing; c. Location and details of wheel washing facilities; d. Measures to control the emission of dust and dirt during demolition and construction; e. A scheme for recycling/disposing of waste resulting from demolition and constriction works; f. Associated parking areas and storage of materials clear of the public highway; g. The protection of users of the highway and adjacent Public Rights of Way, including the bridleway that crosses the two parts of the site.

Reason:To protect the amenity of neighbouring residents and in the interests of highway safety in accordance with policy ENV1 of the East Herts Local Plan Second Review April 2007.

5. Withdrawal of P.D. (Part 1 Class E) (2E22) 3/15/0564/OP

6. Contaminated land survey and remediation (2E33)

7. Prior to the commencement of development, a detailed planting and management scheme for the woodland areas to the northern and southern parts of the application site and including the adjacent woodland shown within land edged blue, based on indicative drawing 200-01 F, shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall include (a) Planting plans (b) Written specifications (including cultivation and other operations associated with plant establishment) (c) Schedules of plants, noting species, planting sizes and proposed numbers/densities where appropriate (d) Implementation timetables (e) A schedule of landscape maintenance for a minimum period of 5 years. The development shall thereafter be carried out in accordance with the approved details.

Reason:To mitigate the visual impact of the development and ensure the provision of continued amenity afforded by appropriate landscape design, in accordance with policies GBC14, ENV1, ENV2 and ENV11 of the East Herts Local Plan Second Review April 2007.

8. Landscape works implementation (4P13)

9. No development shall take place, including any works of demolition or clearance of vegetation, until a final check for the presence of bats has been carried out by a suitably qualified ecologist, and a report submitted to and approved in writing by the Local Planning Authority, which shall include appropriate mitigation measures should evidence of bats be identified on site. The development shall be carried out in accordance with any specified mitigation measures, unless otherwise agreed in writing by the Local Planning Authority.

Reason:In the interests of bats, a European Protected Species in accordance with policy ENV16 of the East Herts Local Plan Second Review April 2007.

10. The total number of residential units within the development hereby permitted in outline shall not exceed 4, and the dwellings shall be located within the northern part of the site with no part of the buildings positioned more than 110 metres away from Friars Road, as shown on the submitted indicative layout plan 200-01 F.

Reason:To ensure the provision of an appropriate form of development that is compatible with the context of the surrounding area, in accordance with policy ENV1 of the Local Plan. 3/15/0564/OP

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
3/15/0564/OP: Outline planning permission for the demolition of existing buildings and erection of 4 no 4 bedroomed dwellings at Ideal Farm, Braughing Friars, SG11 2NR for 2 Agriculture LtdReport 173 KB DownloadRead as text
PDF
3150564OUT 1-15000Report 1 pages Download
PDF
3150564OUT 1-5000Report 129 KB Download

At this meeting

Whole meeting
105Minutes – 10 June 2015Decided 1063/14/2250/FP – Two storey Sports Hall / Teaching facility at Chauncy School, Park Road, Ware, SG12 0DP for The Chauncy SchoolOn the agenda 1073/14/2292/FP – Development of land at Chauncy School to deliver 47 homes (18 houses and 29 flats), associated car parking and amenity space and new vehicular access, Land at Chauncy School, Park Road, Ware for Riversmead Housing AssociationOn the agenda 1083/15/0413/FUL – Erection of 120 residential units, 100 sqm of commercial floorspace, provision of a link road between Mill Road and Mead Lane and passenger interchange, associated car parking, landscaping and groundworks at Land between MilOn the agenda
1093/15/0564/OP – Outline planning permission for the demolition of existing buildings and erection of 4 no 4 bedroomed dwellings at Ideal Farm, Braughing Friars, SG11 2NR for 2 Agriculture LtdThis decision
1103/15/0196/FP – Internal alterations to convert 5 maisonettes into 10 flats at 1-6 Dean House, Havers Lane, Bishop’s Stortford, CM23 3GB for Mr T DeanDecided 1113/14/1851/FP – Change of use of nine parking spaces to hand car wash and valeting operation including installation of an office and erection of a canopy with illumination at Tesco, 1 Bishop's Park Centre, Lancaster Way, Bishop's Stortford, CM23 4DA for Waves Consultancy LimitedRefused 1123/15/0709/HH – Extension and raising of roof to create first floor to garage and insertion of external staircase at Swiss Cottage, Widford Road, Much Hadham, SG10 6EZ for Mr R KeyDecided 1133/15/0384/HH – Single storey side extension at Oakwood House, Standon Green End, High Cross, SG11 1BP for Mr D WarburtonDecided 114Items for Reporting and NotingNoted

On this subject at East Hertfordshire

Search all
  1. 3/15/0564/OP – Outline planning permission for the demolition of existing buildings and erection of 4 no 4 bedroomed dwellings at Ideal Farm, Braughing Friars, SG11 2NR for 2 Agriculture LtdThis decision
  2. 3/24/0294/FUL - Outline approval for a residential development for around 200 new market and affordable homes and full planning approval for the construction of new Medical Centre, car parking area, related drainage, and SuDs infrastructureAgreed
  3. 3/14/1102/OP – Outline planning permission for the erection of 4 no 4 bedroomed dwellings at Ideal Farm, Braughing Friars for R Rafferty, 2 Agriculture LtdRefused
  4. 3/14/0094/OP – Outline planning application for a development of up to 10 dwellings with all matters reserved except highway access onto Green End (B1368) on Land East of Green End Farm, Green End, Braughing, SG11 2PG for The Fairfield PartnershipRefused
  5. 3/13/1023/FO – Variation of Conditions 3 and 5 of outline planning permission 3/11/0554/OP to alter development plot boundaries, alterations to minimum plot heights and removal of pedestrian access B onto Burnt Mill Lane at Terlings Park, Eastwick Road, Eastwick, CM20 2QR for Bloor HomesAgreed
  6. 3/11/0377/FN - Outline planning permission (all matters reserved) for the demolition of the existing buildings and the erection of five houses with associated parking (renewal of permission 3/08/0940/OP) at 65 and 67 North Road, Hertford, SG14 1NF for David McDonnellApproved

More from East Hertfordshire Development Management Committee

All decisions
MeetingDecisionOutcome
12 Aug 2026 3/25/1986/FUL - Erection of 4 x industrial units (use classes E[g], B2 and B8) with associated parking and external works at Buntingford Business Park, Baldock Road, BuntingfordRESOLVED - in accordance with paragraph 6.5.6 of the constitution, Fergus Alexander be permitted to address the Commi... Decided Open
12 Aug 2026 Items for Reporting and NotingRESOLVED – that the following reports be noted: (A) Appeals against refusal of planning permission / non-determinatio... Noted Open
15 Jul 2026 Appointment of Vice-Chair for the 2026/27 civic yearRESOLVED – that Councillor J Thomas be appointed Vice-Chair of the Development Management Committee for the 2026/27 c... Decided Open
15 Jul 2026 Minutes - 15 April 2026RESOLVED – that the Minutes of the meeting held on 15 April 2026, be confirmed as a correct record and signed by the ... Decided Open
15 Apr 2026 Minutes - 11 March 2026RESOLVED – that the Minutes of the meeting held on 11 March 2026, be confirmed as a correct record and signed by the ... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies