Resolved

RESOLVED That support be given to implement the final part (Stage 2) of the Legbourne Road Flood Relief Scheme to a maximum of £90K as allocated within the Capital Programme. Reason for the decision - To allow completion of the project to protect in excess of 40 residential properties from flooding during periods of heavy rainfall. Other options for consideration- None.
Word for word from the decision East Lindsey published for this meeting. Source: democracy.e-lindsey.gov.uk

Follow this further

Built from East Lindsey's papers

What the report saysPro

Report to Executive Board, 7 pages

Summary

On 15th December 2010, Full Council considered the availability of capital resources for the final part (Stage 2) of the Legbourne Road Flood Relief Scheme within the Capital Programme. This scheme is designed to significantly reduce the likelihood of flooding of residential properties in the Legbourne Road/Kenwick Road area of Louth during periods of heavy rainfall.

Recommendations

That support is given by the Executive Board to implement the final part (Stage 2) of the Legbourne Road Flood Relief Scheme to a maximum of £90K as allocated within the Capital Programme.

REASON: To allow completion of the project to protect in excess of 40 residential properties from flooding during periods of heavy rainfall.

This report has been prepared by:

John Green, Regulatory Services Manager - Tel: 01507 Ext. 372 - e-mail: [email protected]

This report was prepared after consultation with:

Jane Froggatt – Strategic Director

This report is number 1 in a series of 1.

This report has been signed off by:

Stuart Davy – Strategic Director The following policies form a context to this report:

Not applicable.

This report is not a key decision included in the Forward Plan. LIST OF BACKGROUND PAPERS AS REQUIRED BY LAW (papers relied on to write the report but which are not published and do not contain exempt information)

1. Not applicable.

OTHER HELPFUL PAPERS (papers which the report author considers might be helpful – this might include published material)

1. Report to Portfolio Holder – Amenities: ‘Draft Discussion Document: The 2007 Flood Response and the Challenges Ahead’ dated 22nd April 2010.

Local Government (Access to Information Act) 1985

Is the report Exempt –No

Please contact the person who has written this report or Stuart Davy, Strategic Director Tel. No. (01507) 601111 Ext. 310 e-mail: [email protected], if you want more information about this report or the background papers.

1.0INTRODUCTION 1.1. The severe flooding during the summer of 2007 seriously affected the Kenwick Road /Legbourne Road areas of Louth. In excess of 40 residential properties were flooded, many internally. This included several in the adjoining Albany Road area. As a consequence, research into the flooding history and formulation of a permanent solution to the problems have been undertaken by the Land Drainage Officer in the Regulatory Services business unit, working with the Environment Agency and Lincolnshire County Council Highways Division through the local Inter-Agency Flood Forum. A flood relief scheme for this area has been developed, Stage 1 of which was completed during 2008. It has been identified that the works needed to complete the land drainage improvements, thereby protecting the previously affected properties from future flooding, amounts to an estimated £75K. Easements and compensation to the landowner will amount to an additional £15K. The total funding required to complete the scheme amounts to £90K.

1.2The solution being applied involves the construction of new dykes and culverts to divert surface water from the Kenwick Hill area to join the Stewton Beck at a point further down its course, well away from residential developments (see Appendix D).

2.0BACKGROUND 2.1. Prior to, during and after the floods of 2007, the Kenwick Road /Legbourne Road junction of Louth has been a problem area for flooding of residential properties. The presence of nearby outdated and inadequate surface water drainage arrangements can result in a high volume of water running off the surrounding agricultural land during heavy rainfall, overtopping dykes and flowing down the road to the junction with Legbourne Road (see map - Appendix A).

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Flooding report Exec Board Jan 2011 Appendix DAppendix 1 pages Download
PDF
Legbourne Road Flood Alleviation Scheme:Report 7 pages DownloadRead as text
PDF
SURFACE WATER MAN BID NOV 09 APPENDIX AAppendix 1 pages Download
PDF
SURFACE WATER MAN BID NOV 09 Appendix BAppendix 1 pages Download
PDF
SURFACE WATER MAN BID NOV 09 Appendix CAppendix 1 pages Download

At this meeting

Whole meeting

More from East Lindsey Executive Board

All decisions
MeetingDecisionOutcome
23 Sep 2026 East Lindsey Investment Fund Update ReportThat the un-committed spend of ELIF 1 in para 2.3 and for ELIF 2 in para 2.5 be noted. 2. That the proposed activitie... Noted Open
23 Sep 2026 Acceptance of Ministry of Housing, Communities and Local Government (MHCLG) Playground Fund GrantThat the signed Memorandum of Understanding between East Lindsey District Council and MHCLG for the Playground Fund b... Noted Open
23 Sep 2026 Vehicle parking improvements to the Waste Depot, Fairfield Industrial Estate, LouthThat the addition of £500,000 to the 2026/27 Capital Programme to fund the improvements to vehicle parking provision ... Approved Open
23 Sep 2026 2026/27 Quarter 1 Finance Update1) That the General Fund forecast revenue outturn position for 2026/27 being an underspend of £56k as detailed in Tab... Noted Open
23 Sep 2026 Quarter 1 26/27 Performance and Risk ReportThat the performance and risk information contained within the report and appendices be noted. 2. That the risk appet... Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies