Resolved
That temporary permission be GRANTED subject to the following condition(s) and that the Service Director of Climate Change, Compliance, Planning and Transport be authorised to add, vary and amend the planning conditions as necessary: 1 The development shall be carried out in complete accordance with the approved plans as detailed below – 100:02 - Site Location Plan C3742 Rev A - Photovoltaic System Schematic 10295-ARP-PV-GF-PL-V - Mounting System Site Elevation 10295-ARP-PV-GF-PL-V - Mounting System Front Elevation 10295-ARP-PV-GF-PL-V - Mounting System Back Elevation Proposed Panel Information, Deep Blue 4.0 Proposed Inverter Information, Solar Edge Project Overview Document, AR Power Coal Mining Risk Assessment, The Coal Authority, December 2024 (71009810622001) Design and Access Statement, Gradon Architecture, March 2025 (Rev D) BNG Metric, OS Ecology, November 2024 BNG Net Gain Assessment, OS Ecology, March 2025 (24371 BNG v2) Preliminary Ecology Appraisal, Equans , October 2024 (24371 PEA v1) Any material change to the approved plans will require a formal planning application to vary this condition and any non-material change to the plans will require the submission of details and the agreement in writing by the Local Planning Authority prior to any non-material change being made. 2 The development to which this permission relates must be commenced not later than 3 years from the date of this permission. 3 Within three months of the expiry of this permission or the cessation of the development for which permission is hereby granted, whichever is the sooner, the site shall be cleared of all hardstanding, any structures and materials connected with the development and the land returned to its former condition, or such alternative scheme as may be submitted to and approved in writing by the Local Planning Authority. 4 No development shall commence until a Construction Management Plan (CMP) has been submitted to and approved in writing by the Local Planning Authority. The DMP shall include: a. a dust management plan b. a noise management plan c. contractor parking All external works and ancillary operations in connection with the demolition and/or construction of the development, including deliveries to the site, shall be carried out only between 0800 hours and 1800 hours on Mondays to Saturdays and at no time on Sundays, Bank Holidays or Public Holidays, unless otherwise approved in writing by the Local Planning Authority. Reason for Pre-commencement Condition This pre commencement condition is required to satisfy the Local Planning Authority that the demolition and construction phases of the development can be carried out in a manner which minimises nuisance to surrounding residents and businesses. This information is fundamental to the development and requires approval prior to development starting on the site as the commencement of demolition and construction works and the manner in which they are ... view the full minutes text for item PD80b