Resolved
That permission be GRANTED subject to the following condition(s) and that the Service Director of Climate Change, Compliance, Planning and Transport be authorised to add, vary and amend the planning conditions as necessary 1 The development shall be carried out in complete accordance with the approved plan(s) as detailed below - C978643 Rev B - Earth Point Connection Details LCSF-DUN-CK-DR-S-20_10-100 Rev P2 - Base Substation LCSF-DUN-CK-DR-S-20_10-101 Rev P1 - LV Cabinet Base C991549 Rev F - Substation in Enclosure 82-378_001 - Tree Constraints Plan JR010384-CLA-XX-ZZ-DR-E-DC600001 Rev C 02 - LV Distribution Layout JR010384-CLA-PE-00-DR-X-DC400001 Rev C0 2 - Site Layout Plan 220_01 Rev 01 - Elevations 220_02 Rev 01 - Elevations BNG Metric BNG Report (82-378 R1-2) Arboricultural Impact Assessment (82-378-R2-1) Preliminary Ecological Appraisal (82-378-R3-1) Noise Impact Assessment (11767.3 Rev A) Acer 65_50 Specifications Birch Range Specifications Design and Access Statement (Rev C) Noise Impact Assessment (11767.3 Rev A) Any material change to the approved plans will require a formal planning application to vary this condition and any non-material change to the plans will require the submission of details and the agreement in writing by the Local Planning Authority prior to any non-material change being made. 2 The development to which this permission relates must be commenced not later than 3 years from the date of this permission. 3 Prior to the first operation of the plant equipment hereby approved, a solid noise mitigation barrier with a minimum height of 2.5 metres shall be installed in full accordance with the Apex Acoustics Noise Impact Assessment (Ref: 11767.3A, dated 1 November 2024). The barrier shall: Fully enclose the plant on all sides; Be constructed of materials with a minimum surface density of 10 kg/m² (e.g. overlapping timber boards, solid concrete, or brick); Be continuous to the ground with no cracks or gaps. The barrier and associated plant shall thereafter be retained and maintained in accordance with the manufacturer's specifications and the approved Noise Impact Assessment. Any damage or deterioration affecting the acoustic performance of the barrier shall be repaired or replaced within 14 days. The rating level of noise from the plant, measured at the nearest noise-sensitive receptors, shall not exceed the representative background sound levels: 42 dB LA90, 1hr (07:00-23:00) and 30 dB LA90, 15min (23:00-07:00). 4 All external works and ancillary operations in connection with the construction of the development, including deliveries to the site, shall be carried out only between 0800 hours and 1800 hours on Mondays to Saturdays and at no time on Sundays, Bank Holidays or Public Holidays, unless otherwise approved in writing by the Local Planning Authority. 5 In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the ... view the full minutes text for item PD40a