AI summaryGateshead Council has approved the installation of eight air source heat pumps at Dunston Leisure Centre, with conditions covering noise, tree protection and a 10% biodiversity net gain. The work is partly retrospective.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeApprovedSubject to 17 planning conditions
MoneyNo CIL liabilityNot chargeable development under CIL
What happens nextCommence within 3 yearsFrom date of this permission
Who it affectsDunston Leisure Centre and nearby residentsOn Park Avenue and Dunston Bank

What was decided

Full planning permission was granted for the installation of eight air source heat pumps and associated infrastructure, even though the units have already been put in place. Report 1.6, 1.7, 7.0

Conditions require a 2.5 metre solid noise barrier enclosing the plant, with operational noise limits of 42 dB during the day and 30 dB at night. Report P112, P113, P114, 5.18

A Biodiversity Gain Plan, Construction Environmental Management Plan, soft landscaping, ecological management plan and integrated bird nesting features must be approved and implemented. Report P127, P133, P139, P142, P146, 5.42

Why

The scheme provides a low-carbon alternative to gas heating at a council-owned building, supporting the Council's declared Climate Emergency and Policy CS16 of the Local Plan. Report 1.8, 5.6, 5.8

Officers accepted that noise from the plant can be controlled within background levels using the specified barrier, so neighbouring amenity would not be unacceptably harmed. Report 5.17, 5.18, 5.20

Updated ecological information shows a post-intervention biodiversity value of 1.02 units against 0.93 baseline, giving a 10.16% on-site net gain that meets the statutory 10% requirement. Report 5.41, 5.42

What happens next

The applicant must submit and obtain approval of a Biodiversity Gain Plan, a CEMP for Biodiversity, a soft landscaping scheme and a long-term ecological management plan before any development or works begin. Report P127, P133, P139, P142

The 2.5 metre solid noise barrier must be installed and the integrated bird nesting features fitted before the plant is first operated. Report P112, P146, P148

The development must be begun no later than 3 years from the date of permission, otherwise the consent will lapse. Report P110, P111

Options considered

  • Chosen: Grant planning permission subject to conditions. Scheme accords with NPPF and Local Plan policies on climate change, with no unacceptable impacts on amenity, trees or ecology subject to conditions Report 6.4, 6.5, 7.0
  • Rejected: Refuse planning permission. No material considerations arose that would justify refusal Report 5.55, 6.5

Implications

  • Climate: Replaces gas heating with low-carbon heat pumps at a council leisure centre, supporting Gateshead's declared Climate Emergency and decarbonisation programme. Report 1.8
  • Equalities: Nearest homes on Park Avenue (67+ m) and Dunston Bank (54+ m) are protected by noise limits and a solid barrier, addressing amenity concerns raised in objections. Report 1.3, 5.18
  • Risk: Contamination condition (5) requires any previously unidentified contamination to be reported, investigated and remediated before development continues. Report P118, P120
  • Other: Mature trees, including a veteran beech, are protected by a Tree Protection Plan, Arboricultural Method Statement and supervision at key construction stages. Report 5.34, 5.35, P122, P123, P124

Who and where

  • Users of Dunston Leisure Centre, who will benefit from low-carbon heating and hot water Report 1.2, 1.8
  • Residents on Park Avenue, more than 67 metres to the south, whose amenity is protected by noise conditions Report 1.3, 5.18
  • Residents on Dunston Bank, more than 54 metres to the east, whose amenity is protected by noise conditions Report 1.3, 5.18
  • A Ward Councillor who objected, alongside four other objectors concerned about noise and property values Report 3.2, P25, P26
  • Biodiversity on and around the site, with a 10.16% net gain required and habitat creation secured by condition Report 5.41, 5.42

Timeline

  • 1 November 2024: Apex Acoustics Noise Impact Assessment (Ref: 11767.3A) dated Report P112
  • 11 April 2025: Application validated by the Council Report P3
  • 23 April 2025: Temporary planning permission granted for 300-panel solar PV array at the same site (DC/24/01084/FUL) Report P18
  • July 2025: Updated Preliminary Ecological Appraisal and Statutory BNG Metric submitted Report 5.41
  • 1 October 2025: Planning and Development Committee resolves to grant permission subject to conditions Report 7.0
  • Within 3 years of permission: Development must be begun, otherwise the permission expires Report P110

Plain English for the jargon

  • ASHP: Air Source Heat Pump, a unit that extracts heat from outside air to provide heating and hot water
  • BNG: Biodiversity Net Gain, an approach requiring developments to leave biodiversity in a measurably better state than before
  • CIL: Community Infrastructure Levy, a charge councils can levy on certain new developments to fund infrastructure
  • dB LA90: The A-weighted sound level, in decibels, that is exceeded for 90% of the measurement period, used as a background noise indicator
  • AMS and TPP: Arboricultural Method Statement and Tree Protection Plan, documents setting out how trees will be safeguarded during construction
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
ItemPD40a

Resolved

That permission be GRANTED subject to the following condition(s) and that the Service Director of Climate Change, Compliance, Planning and Transport be authorised to add, vary and amend the planning conditions as necessary 1 The development shall be carried out in complete accordance with the approved plan(s) as detailed below - C978643 Rev B - Earth Point Connection Details LCSF-DUN-CK-DR-S-20_10-100 Rev P2 - Base Substation LCSF-DUN-CK-DR-S-20_10-101 Rev P1 - LV Cabinet Base C991549 Rev F - Substation in Enclosure 82-378_001 - Tree Constraints Plan JR010384-CLA-XX-ZZ-DR-E-DC600001 Rev C 02 - LV Distribution Layout JR010384-CLA-PE-00-DR-X-DC400001 Rev C0 2 - Site Layout Plan 220_01 Rev 01 - Elevations 220_02 Rev 01 - Elevations BNG Metric BNG Report (82-378 R1-2) Arboricultural Impact Assessment (82-378-R2-1) Preliminary Ecological Appraisal (82-378-R3-1) Noise Impact Assessment (11767.3 Rev A) Acer 65_50 Specifications Birch Range Specifications Design and Access Statement (Rev C) Noise Impact Assessment (11767.3 Rev A) Any material change to the approved plans will require a formal planning application to vary this condition and any non-material change to the plans will require the submission of details and the agreement in writing by the Local Planning Authority prior to any non-material change being made. 2 The development to which this permission relates must be commenced not later than 3 years from the date of this permission. 3 Prior to the first operation of the plant equipment hereby approved, a solid noise mitigation barrier with a minimum height of 2.5 metres shall be installed in full accordance with the Apex Acoustics Noise Impact Assessment (Ref: 11767.3A, dated 1 November 2024). The barrier shall: Fully enclose the plant on all sides; Be constructed of materials with a minimum surface density of 10 kg/m² (e.g. overlapping timber boards, solid concrete, or brick); Be continuous to the ground with no cracks or gaps. The barrier and associated plant shall thereafter be retained and maintained in accordance with the manufacturer's specifications and the approved Noise Impact Assessment. Any damage or deterioration affecting the acoustic performance of the barrier shall be repaired or replaced within 14 days. The rating level of noise from the plant, measured at the nearest noise-sensitive receptors, shall not exceed the representative background sound levels: 42 dB LA90, 1hr (07:00-23:00) and 30 dB LA90, 15min (23:00-07:00). 4 All external works and ancillary operations in connection with the construction of the development, including deliveries to the site, shall be carried out only between 0800 hours and 1800 hours on Mondays to Saturdays and at no time on Sundays, Bank Holidays or Public Holidays, unless otherwise approved in writing by the Local Planning Authority. 5 In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the ... view the full minutes text for item PD40a
Word for word from the decision Gateshead published for this meeting. Source: democracy.gateshead.gov.uk

Follow this further

Built from Gateshead's papers

What the report saysPro

Report to Planning and Development Committee

REPORT NO 2

Committee Report

Application No: DC/24/01152/FUL Case Officer David Morton Date Application Valid 11 April 2025 Applicant [name removed]: Dunston Leisure Centre Dunston Bank Gateshead NE11 9PY

Ward: Dunston Hill And Whickham East Proposal: Proposed installation of eight air source heat pumps (ASHP). Recommendation: GRANT Application Type Full Application

1.0The Application:

1.1DESCRIPTION OF THE SITE

1.2The application site is located within the grounds of Dunston Leisure Centre, Dunston Bank, Gateshead. More specifically, the application site is located to rear of main leisure centre building and currently comprises an area of hard standing (where existing plant equipment is located) and a grassed area (south elevation). The site is bounded by mature trees and areas of woodland to the south and east, with the leisure centre and associated car park to the north.

1.3The area is characterised by a mix of leisure, community and residential uses. The nearest residential properties are located to the south and east of the site, located on Park Avenue (in excess of 67 metres away) and Dunston Bank (in excess of 54 metres away) respectively. These properties are beyond the grassed area and separated by mature trees and intervening woodland, land level also rise from north to south. The site is not part of any statutory nature conservation designation, but it lies within a designated Wildlife Corridor as identified in the Local Plan.

1.4The Council's Open Space Assessment (2018) identifies land within this wider site as low to medium quality open space. The space affected by the proposal does not contain formal recreational facilities or public rights of way, although it is accessible as informal green space.

1.5DESCRIPTION OF THE APPLICATION

1.6The application seeks full planning permission for the installation of eight air source heat pumps (ASHP) to serve Dunston Leisure Centre. The proposed units would be located within an existing plant area to the south of the main leisure centre building. Each heat pump would be positioned on a concrete plinth and grouped to allow connection to the existing energy systems of the leisure centre. The installation of these ASHPs has already taken place, meaning that the application is partially retrospective.

1.7The development includes associated infrastructure, including cabling, ducting, and a small switch room/substation to facilitate the connection of the plant to the building. The proposals also include a solid noise mitigation barrier, designed to fully enclose the plant, with a minimum height of 2.5 metres, in accordance with the submitted Noise Impact Assessment. These elements of the development have not been undertaken.

1.8The air source heat pumps are intended to provide low-carbon heating and hot water to the leisure centre, reducing reliance on fossil fuels and supporting the Council's climate change commitments. The scheme forms part of the wider programme of energy efficiency improvements across Gateshead Council's public buildings.

1.9Access for construction and maintenance will be taken from the existing leisure centre car park. No new vehicular or pedestrian accesses are required, and no public rights of way and/or access will be affected.

1.10The application is supported by a Design and Access Statement, Preliminary Ecological Appraisal, Biodiversity Net Gain Assessment, Noise Impact Assessment, and an Arboricultural Assessment.

1.11PLANNING HISTORY

1.12The relevant planning history is set out below;

• DC/24/01084/FUL; Temporary planning permission granted for 'Installation of a 300- panel solar photovoltaic (PV) array adjacent to the leisure centre building and car park. (Amended 11.03.2025)' Date; 23 April 2025.

2.0Consultation Responses:

Tyne and Wear Archaeology No objection.

The Coal Authority No objection.

3.0Representations:

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
No.2: Dunston Leisure Centre, Dunston Bank, Gateshead, NE11 9PYReport 211 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

13 of 21 attended
JT
Councillor Judith TurnerChair, present
KW
Councillor Keith WoodVice-Chair, present
VA
Councillor Vicky AndersonCommittee Member, apologies
DB
Councillor Dot BurnettCommittee Member, present
LC
Councillor Lynne CaffreyCommittee Member, present
SD
Councillor Sonya DickieCommittee Member, present
PE
Councillor Paul ElliottCommittee Member, apologies
AG
Councillor Alex GeddesCommittee Member, apologies
TG
Councillor Tom GrahamCommittee Member, apologies
HK
Councillor Hugh KellyCommittee Member, present
KM
Councillor Kathleen McCartneyCommittee Member, present
EM
Councillor Eileen McMasterCommittee Member, present

All 21 on the meeting page

On this subject at Gateshead

Search all
  1. No.2 - Dunston Leisure Centre, Dunston Bank, Gateshead, NE11 9PYThis decision
  2. No.2 - Dunston Leisure Centre, NE11 9PYApproved

More from Gateshead Planning and Development Committee

All decisions
MeetingDecisionOutcome
9 Sep 2026 Planning Applicationsi) That the full planning applications and outline applications specified in the appendix to these minutes be granted... Refused Open
9 Sep 2026 No.1 - Alexandra Guest House, 377 Alexandra Road, Gateshead, NE8 4HYThat permission be GRANTED, subject to the following conditions and the addition of an Operational and Management Pla... Approved Open
9 Sep 2026 No.2 - St Cuthberts Clearance Area Land Between Askew RoadThat planning permission is GRANTED subject to the following conditions and that the Service Director of Climate Chan... Approved Open
9 Sep 2026 No.3 - Discover Leisure PLC,Portobello Road, Birtley, DH3 2SNThat permission be GRANTED subject to the following condition(s) and that the Service Director of Climate Change, Com... Approved Open
9 Sep 2026 No.4 - 16 Langdale Road, Gateshead, NE9 5RNThat permission be GRANTED subject to the following condition(s) and that the Service Director of Climate Change, Com... Approved Open