Resolved
TO GRANT PLANNING PERMISSION subject to the following conditions: 1 The development must be begun not later than 2 nd July 2028. 2 The development hereby permitted shall be completed in accordance with the submitted documents: Existing Plans, received 18th November 2024 Proposed Elevation Plans, 23rd October 2024 Proposed Floor Plans, received 3rd October 2024 Proposed Site Plan, received 3rd October 2024 Site Location Plan, received 3rd October 2024 Application Form, received 3rd October 2024 Drawing no. PBLS-BSP-ZZ-ZZ-DR-D-0001 Rev P02, received 23rd January 2025 3 The development shall be undertaken in the materials identified on the submitted Elevation Plans and Material Details received by the Local Planning Authority on 25th July 2025 as part of discharge of condition application 2025/0581DOC. 4 The development shall not be occupied until a detailed scheme for the boundary treatment of the site, including position, design and materials, and to include all boundaries, cycle storage area and bin storage area, has been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be completed before the development is first brought into use. 5 The hard landscaping works shall be carried out in accordance with the submitted External Works Layout Plan and Hard Landscaping Plan, 480-L-D-111 Rev P01 received by the Local Planning Authority on 25th July 2025 as part of discharge of condition application 2025/0581DOC. 6 Prior to completion of development the surface water drainage scheme approved as part of discharge of condition application reference number 2025/0581DOC shall be implemented in full. The approved documents are;- 601186-HEX-XX-XX-D-C-9201 P01 Exceedance Plan, received 29th October 2025 601186-HEX-XX-XX-D-C-9210 P02 Drainage Details Sheet 1, received 2nd October 2025 601186-HEX-00-XX-T-C-9210 V01 Surface Water Maintenance and Management Plan, received 2nd October 2025 601186-HEX-XX-XX-D-C-9200 P02 Surface Water Drainage Layout, received 2nd October 2025 601186-HEX-XX-XX-D-C-9210 P02 Drainage Details Sheet 1, received 2nd October 2025 Surface Water Flow V01, received 2nd October 2025 7 From the date of first occupation the development shall be provided with access to electric vehicle (EV) charge point(s) in line with Part S of the Building Regulations. A minimum of three (3) active chargepoints and, cable ... view the full minutes text for item 38.