Resolved
Resolved that the report be noted.
Gravesham Joint Transportation Board noted this item on Wednesday 21 March 2007. Below is the council's own wording, with the papers it was decided on.
Resolved
Resolved that the report be noted.
For information
1. Background and discussion
1.1Ringway Specialist Services took over the maintenance of all aspects of street lighting with effect from 10 July 2006. This includes all District lighting, Parish lighting, Housing lighting, Car Park lighting and Leisure Services lighting within Gravesham .
1.2The target set for street lighting is 98% in light with a response time of 7 days to a reported fault. Due to the adherence to the Working at Height Regulations under Health and Safety at Work, this time is extended where the reported unit is in an area where there is no access to a vehicle with a suitable elevating platform. e.g. Footpaths
1.3The figure taken as December 2006 shows the performance for Gravesham is 99.54%. The overall figure for Kent was 99.01%.
1.4There is a continuous development on maintenance of existing stock using technology to introduce more effective and efficient lighting. This includes cost savings on energy consumption and lower maintenance costs. Areas covered include :-
a. The use of electronic gear and photocells showing a 35% reduction in energy costs. Within Gravesham on Kent Highway Services lighting a total of 463 units have been upgraded with the new electronic lanterns. Plans are in hand with GBC Engineering to upgrade GBC lighting when funding is available. b. Reduction in energy costs by introducing non-illuminated bollard where appropriate. There are also plans to introduce solar powered illuminated bollards using a 3 watt LED lamp as compared to the current 3 x 11 watt fluorescent lamps plus gear where lit bollards are required. These will be available in the next financial year as they are being introduced in late March.
c. Replacement of school flasher units with remote controlled LED units reducing energy and maintenance costs. This also improves the illumination to approaching drivers.
d. Replacement of all time clock controlled units with photocells producing an 11 watt energy saving per unit per hour in light. That will reduce costs and outages due to power cuts and mechanical failures. This is planned for 2007 / 2008, however, in Gravesham this type of unit in all outlying areas such as villages have already been replaced with photocell units. That has shown a marked improvement in lighting and a reduction in failures.
e. Replacement of standard columns in areas not accessible by elevated platform vehicles with fold down columns to allow the engineer to return to a 7 day response as the engineer can fold down the column and work on the unit without leaving ground level . Currently 80 KHS units have been replaced on footpaths.
f. Improving all stock held on behalf of GBC by a program of works. Currently within the housing stock upgrades have been carried out on Wallis Park, Kings Farm, Mackenzie Way, Gravesham Court and Homemead . Within the Car Park stocks the Milton Place car Park is upgraded to meet the Safer Car Parks standard and plans are in hand to upgrade Rathmore Road Car Park to a similar standard.
g. All street lighting waste is disposed of under the WEEED Regulations to provide a greener environment.
h. Bulk lamp replacement is being phased out except along primary routes and on signs and bollards. Savings in this area are being used to support other street lighting aspects.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Street LightingReport | 20 KB | DownloadRead as text |
Follow Gravesham Joint Transportation Board at Gravesham and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 10 Mar 2021 | Bath Street - Fastrack Infrastructure SchemeResolved that the report be noted. | Noted | Open |
| 10 Mar 2021 | Highway Forward Works Programme - 2019/20 onwardsResolved the report be noted. | Noted | Open |
| 10 Mar 2021 | Issues raised by Councillors with the approval of the ChairIt was agreed that the results of the ATC be shared with Cllr Rana. It was noted that the officer had previously disc... | Agreed | Open |
| 14 Mar 2018 | Gravesham Highway Works Programme 2017/18Resolved that the Board noted the information contained within the report and agreed the following: ยท The Gravesham D... | Noted | Open |
| 14 Mar 2018 | Petitions from residents at the JTB (KCC Petition Scheme)Resolved that the Board look at the original JTB Legal Agreement between KCC and GBC with the view to amending it to ... | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.