Gravesham Borough Council
Report to: Joint Transportation Board
Date: 25th March 2009
Reporting officer: Head of Countywide Improvements
Subject: Highway and Transportation Schemes Progress Report – 2008/9 Purpose and summary of report: This report advises members of the progress of highway and transportation schemes in Gravesham.
Recommendations: For information and comment.
1. Background.
1.1Following the acceptance of the proposed schemes for the 2008/9 Urban and Rural Packages, and Highway Improvement schemes, this report shows the progress on these schemes to date.
1.2Appendix 1 shows each scheme within the Kent Thameside (Gravesham) packages; Gravesham Rural package and Crash remedial Schemes. Progress to date and anticipated progress prior to the next Joint Board is detailed. Also detailed are those schemes from the 2007/08 financial year that were still to be completed in the last report.
1.3For Members’ information on the progress on these schemes
BACKGROUND DOCUMENTS: The background papers pertaining to this report are held on the Kent Highways Services files.
All requests to inspect the above documents MUST be directed in the first instance to the Committee Section of the Democratic Services Department
Contact Officers: See last column in Appendix 1 (tel 08458 247 800). Highway and Transportation Scheme Progress Report – 2008/9: APPENDIX 1
1. Kent Thameside (Gravesham) Urban Package 2008/09
Kent
Forecast Out-turn KHS Location Description of Works Current Progress Anticipated Actions for next 3 Highway
allocation
2008 – 09 2008 - 09 Original Ref months Services (Prior to next JTB) Contact 08458 247800 Sites for permanent traffic monitoring equipment, (count A226 Rochester 08-ITS- UTMC – Traffic loops), identified and David Road / Stonebridge N/a £50k £50k GR-01 congestion information installation expected to be Batchelor Rd – Gravesend completed by end of march 2009.
Agreement between KCC & GBC has been signed, and work on installing equipment 08-ITS- Off-vehicle ticketing & Installation & commissioning David Fastrack – Route B has commenced on Thames £390k £80k GR-02 CCTV to be completed. George Way with a view to completion before the end of the financial year.
Outline design has been Hall Road / 08-ITS- Cycle route & pedestrian progressed and discussions Outline design to be Peter Coldharbour Road rd £20k £10k GR-03 improvements. regarding purchase of 3 party completed Slaughter – Northfleet land continuing.
Pedestrian crossing & 08-ITS- Hall Rd / A2 Slip cycle improvements & GR-04 Works completed Monitoring £60k £70k Julian Cook roads. - Northfleet removal of old traffic signals equipment. Formal Pedestrian Darnley Road / 08-ITS- crossing facilities to be Works completed September Dashwood Road. N/a £90k £95k Julian Cook GR-05 added to existing traffic 2008 Gravesend signals 1. Kent Thameside (Gravesham) Urban Package 2008/09 (continued)
Kent
Forecast Out- Anticipated Actions for next 3
Allocation Highway
2008 – 09 2008 - 09 Original KHS Location Description of Works Current Progress months Services
turn Ref (Prior to next JTB) Contact 08458 247800
Old Rd West Crash Remedial 08-ITS- (B261) / Wrotham Measure - Junction Works completed N/a £5k £5k Geoff Dance GR-09 Rd (A227) - improvements – signing Gravesend & lining
Pedestrian crossing 08-ITS- Various locations – Simon improvements – various Works completed N/a £25k £25k GR-07 Gravesend Allsopp locations
08-ITS- Thames Way – GR- Extension of cycle-route. Works completed Monitoring £47k £30k Julian Cook Northfleet 010
Pedestrian crossing improvements – 08-ITS- B260 – Longfield Simon provision of dropped Works completed N/a £50k £50k GR-06 Road – Meopham. Allsopp kerbs at various locations
08-ITS- Wrotham Rd – Andy Extension of cycle route Works completed Monitoring £30k £50k GR-08 Istead Rise Padgham
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Highway and Transportation Schemes Progress Report 2008/09Report | 44 KB | DownloadRead as text |
Follow Gravesham Joint Transportation Board at Gravesham and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 10 Mar 2021 | Bath Street - Fastrack Infrastructure SchemeResolved that the report be noted. | Noted | Open |
| 10 Mar 2021 | Highway Forward Works Programme - 2019/20 onwardsResolved the report be noted. | Noted | Open |
| 10 Mar 2021 | Issues raised by Councillors with the approval of the ChairIt was agreed that the results of the ATC be shared with Cllr Rana. It was noted that the officer had previously disc... | Agreed | Open |
| 14 Mar 2018 | Gravesham Highway Works Programme 2017/18Resolved that the Board noted the information contained within the report and agreed the following: · The Gravesham D... | Noted | Open |
| 14 Mar 2018 | Petitions from residents at the JTB (KCC Petition Scheme)Resolved that the Board look at the original JTB Legal Agreement between KCC and GBC with the view to amending it to ... | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.