Resolved
That the update be noted. That the briefing in relation to the removal of Wifi facilities on Metrolink be shared with all Members of the Committee. That a breakdown of complaints by type be included in future reports to the Committee.
Greater Manchester Transport Committee noted this item on Friday 22 January 2021. Below is the council's own wording, with the papers it was decided on.
Resolved
That the update be noted. That the briefing in relation to the removal of Wifi facilities on Metrolink be shared with all Members of the Committee. That a breakdown of complaints by type be included in future reports to the Committee.
This report provides an update on Metrolink operation and performance.
Members are asked to note the contents of this report.
BACKGROUND DOCUMENTS:
GMTC report of 23 December 2020
CONTACT OFFICERS:
Daniel Vaughan Head of Metrolink 0161 244 1519 [email removed]
Victoria Mercer Metrolink Service Delivery 0161 244 1737 Manager [email removed] Equalities Implications: n/a Climate Change Impact Assessment and Mitigation Measures – n/a Risk Management: n/a Legal Considerations: n/a Financial Consequences – Revenue: n/a Financial Consequences – Capital: n/a
Number of attachments to the report: 1
Appendix 1: Period date listing Appendix 2: Face covering compliance by line
Comments/recommendations from Overview & Scrutiny Committee
BACKGROUND PAPERS: n/a
TRACKING/PROCESS Does this report relate to a major strategic decision, as set out in the No GMCA Constitution
EXEMPTION FROM CALL IN Are there any aspects in this report which n/a means it should be considered to be exempt from call in by the relevant Scrutiny Committee on the grounds of urgency?
GM Transport Committee Overview & Scrutiny Committee n/a n/a 1. ABOUT METROLINK
1.1Metrolink is the largest urban light rail network in the UK. It provides a fast, frequent service which is fully accessible to all, running 7 days a week, 364 days of the year.
1.2The Metrolink network is owned by TfGM and is operated on TfGM’s behalf through a contract with KeolisAmey Metrolink (KAM).
1.3The network uses high-floor trams with raised platform stops and had reached patronage of over 45 million passengers each year, pre Covid.
1.4There are currently 121 operational trams serviced from two depots. All available trams run in service on weekdays, with as many doubles as possible to facilitate social distancing.
1.5Trams serve 99 stops covering routes totalling just over 100km. Metrolink is the most accessible of the public transport networks in Greater Manchester, providing step free access across the entire network.
2. PERFORMANCE SUMMARY
2.1The Metrolink Quarterly Performance Report provides a performance summary for the rolling 12-month period.
2.298.1% of scheduled miles were operated during the 12 months to December 2020 against a performance target of 99.4%. Performance was impacted by two significant overhead line equipment (OHLE) failures, a serious road traffic collision and the ongoing influence of short notice staff unavailability due to COVID.
2.3Recorded incidents of crime and anti-social behaviour on the network have risen following the increase in patronage post first lockdown but overall remain lower than levels recorded in 2019. However, reported criminal damage has escalated across the network (platform shelters, TVMs, ticket validators, saloon windows, tram seats and cycle hubs) and is notably higher than those reported in 2019.
2.4Issues relating to ticketing remain consistently the top reason for customer contact.
2.5Additional COVID measures were implemented in December to include increased resourcing to support customers travelling safely. This included an additional 500 hours per week of touch point cleaning, teams of ‘Trambassadors’ engaging with customers on the requirements for safe travel as well as the installation of hand sanitiser units on high footfall stops.
2.6KAM’s Customer Compliance Plan resulted in improved fare and face covering compliance. Strategic deployment of Customer Service Representatives to check tickets and issue standard fares, planned days of action with TfGM and GMP, and effective school engagement were key enablers. 2.7 Vehicle availability was reduced for two weeks during the November lockdown to facilitate fleet inspections and maintenance following an identified fault on the track brake suspension brackets. This work was completed before the end of lockdown 2.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Metrolink Service PerformanceReport | 1.2 MB | DownloadRead as text |
Follow Greater Manchester Transport Committee at Greater Manchester Combined Authority and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 17 Mar 2023 | ApologiesApologies were received and noted from Councillors Tracey Rawlins, Howard Sykes, Naeem Hassan, Kevin Peel and George ... | Noted | Open |
| 17 Mar 2023 | Chairs Announcements and Urgent BusinessThere were no Chair’s announcements or items of urgent business. | Decided | Open |
| 17 Mar 2023 | Declarations of InterestThat Councillor Phil Burke declared a personal interest as an employee of Metrolink. | Decided | Open |
| 17 Mar 2023 | Minutes of the Greater Manchester Transport Committee meeting held on 17 February 2023That the minutes of the GM Transport Committee meeting held on 17 February 2023 be approved as a correct record. | Approved | Open |
| 17 Mar 2023 | Minutes of the Sub Committee MeetingsThat the minutes of the Metrolink & Rail Sub Committee held on 3 March 2023 be noted. 2. That the minutes of the Bus ... | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.