Greater Manchester Transport Committee noted this item on Friday 11 November 2022. Below is the council's own wording, with the papers it was decided on.
That the content of the report be received and noted. 2. That Vicky Mercer, TfGM would share campaign material targeted for the festive period around tram safety be shared with Members of the Committee. 3. That Daniel Vaughan, TfGM be asked to give further thought as to how the effectiveness and impact of the Crucial Crew be measured and reported.
Word for word from the decision Greater Manchester Combined Authority published for this meeting.Source: democracy.greatermanchester-ca.gov.uk
Follow this further
Built from Greater Manchester Combined Authority's papers
GREATER MANCHESTER TRANSPORT COMMITTEE METROLINK AND RAIL NETWORKS SUB-COMMITTEE
Date: 11 November 2022
Subject: Metrolink Service Performance
Report of: Danny Vaughan, Head of Metrolink, TfGM
PURPOSE OF REPORT: This report provides an update on Metrolink services and performance.
RECOMMENDATION: Members are asked to note the contents of this report.
CONTACT OFFICERS:
Danny Vaughan Head of Metrolink [email removed]
Victoria Mercer Metrolink Service Delivery Manager [email removed] Equalities Implications: n/a
Climate Change Impact Assessment and Mitigation Measures: n/a
Risk Management: n/a
Legal Considerations: n/a
Financial Consequences – Revenue: n/a
Financial Consequences – Capital: n/a
Number of attachments to the report: 2
• Appendix 1: Period date listing • Appendix 2: Patronage by line
Comments/recommendations from Overview & Scrutiny Committee: n/a
BACKGROUND PAPERS: Metrolink Service Performance report of 16 September 2022
TRACKING/PROCESS
Does this report relate to a major strategic decision, as set out in the GMCA Constitution? No
EXEMPTION FROM CALL IN Are there any aspects in this report which means it should be considered to be exempt from call in by the relevant Scrutiny Committee on the grounds of urgency? No
GM Transport Committee n/a
Overview & Scrutiny Committee n/a 1. ABOUT METROLINK
1.1Metrolink is the largest urban light rail network in the UK. It provides a fast, frequent service which is fully accessible to all, running 7 days a week, 364 days of the year.
1.2The Metrolink network is owned by TfGM and is operated and maintained on TfGM’s behalf through a contract with KeolisAmey Metrolink (KAM).
1.3The network uses high-floor trams with raised platform stops and had reached patronage of over 45 million passengers each year prior to the covid pandemic.
1.4There are 147 trams serviced from two depots. The final of the new batch of trams arrived in Manchester on Saturday 24 September.
1.5Trams serve 99 stops covering routes totalling just over 100km. Metrolink is the most accessible of the public transport networks in Greater Manchester, providing step free access across the entire network.
2. PERFORMANCE SUMMARY
2.1The Metrolink Quarterly Performance Report provides a performance summary for the rolling 12-month period.
2.2Patronage has continued recovering, punctuated by impacts of holiday periods, planned engineering work on the network, heat during the summer months, rail strikes and most recently, events of national significance. The 4 weeks of October 2022 have ranked 4th, 2nd, 1st and 5th in relation to post-pandemic recovery since March 2020.
2.3Operational performance improved during periods 5 and 6, though significant hot weather impacts continued to be experienced into period 5 with temporary speed restrictions applied in various locations across the network between 10 and 14 August due to the temperatures exceeding 30°C. 2.4 Engineering and renewals works continue into autumn which will see planned changes to city centre services (see Section 5 for planned engineering works). Due to a delay in track repairs at Piccadilly Gardens, and to ensure the continued and safe operation of services, a temporary change to some Metrolink services commenced from Monday 24 October. The work to repair the track will take place during week commencing 21 November 2022.
2.5A pilot of carriage of dogs on Metrolink began on 1 August 2022 to fulfil a mayoral manifesto commitment. The pilot allows passengers to take two non-assistance dogs on Metrolink at any time of the day for no charge, subject to following guidance regarding behaviour. The pilot period ends on 31 October 2022, but the carriage of dogs on trams will be permitted until January 2023 whilst a full review of feedback takes place. 3. PATRONAGE
3.1Patronage measures the number of single journeys that are made on the network.
3.2As can be seen in the chart below, patronage has been steadily recovering since
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Greater Manchester Transport Committee at Greater Manchester Combined Authority and we tell you when its next papers are published, before the meeting rather than after it.
Minutes of the Sub Committee MeetingsThat the minutes of the Metrolink & Rail Sub Committee held on 3 March 2023 be noted. 2. That the minutes of the Bus ...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.