What was decided
Full planning permission was granted for a mixed-use phased redevelopment providing residential development with flexible Class E commercial uses at ground floor, together with vehicle access, servicing, car and cycle parking, landscaping and public realm improvements.
The development is capped at 258 residential units (29,078 GIA, 803 habitable rooms) and up to 274 sqm of Class E floorspace, with blocks A1 (8 storeys), A2 (6 storeys), A3 (9 storeys), B1 (6 storeys) and B2 (20 storeys). Report P11, P12
Consent is subject to Stage II referral to the Mayor of London, a Section 106 legal agreement, the conditions set out in Appendix 2, and Environmental Impact Assessment compliance under Regulations 26 and 29 of the 2017 Regulations.
Why
The application was supported by an Environmental Statement, a Design and Access Statement, town planning, transport, energy, sustainability, drainage, air quality, noise, contamination, fire, biodiversity net gain, health impact and other technical documents dated August to September 2025. Report P2, P3, P7, P8, P9
Conditions are imposed to ensure the development is built in line with the approved drawings, quantum and phasing, with environmental mitigation measures, Construction Environmental Management Plan, air quality, noise, contamination, unexploded ordnance, travel plans, cycle and car parking and refuse strategies all secured through planning conditions. Report P5, P6, P25, P50, P66, P71, P80
What happens next
The application must be referred to the Mayor of London under the Town and Country Planning (Mayor of London) Order 2008 (Stage II) before planning permission can be issued.
A Section 106 agreement under the Town and Country Planning Act 1990 containing the planning obligations set out in the heads of terms in Section 28 of the report must be completed.
The Assistant Director (Planning and Building Control) is authorised to make minor changes to the wording of the recommended conditions and issue the notice of determination.
Options considered
- Chosen: Grant full planning permission subject to conditions, Section 106 agreement and Mayor of London referral
Implications
- Legal: Planning permission is conditional on completion of a Section 106 legal agreement and on Environmental Impact Assessment regulations compliance being recorded in writing. Report P19, P20
- Equalities: Accessible M4(3) social rented units are to be allocated a minimum of 6 blue badge parking bays, with car park management to be secured by condition. Report P75
- Risk: Conditions require remediation, verification reports, unexploded ordnance risk assessment, contamination response, noise testing and air quality assessment to manage construction and operational risks. Report P42, P44, P47, P50, P53, P55, P61
- Staffing:
- Climate: Energy, sustainability, whole life carbon, overheating, biodiversity net gain, air quality positive, sustainable urban drainage and circular economy statements have been submitted to address climate and environmental matters. Report P2, P3, P7, P8
- Financial:
Who and where
- Future residents of 258 new homes at Greenwich Millennium Village Report P11
- Existing and neighbouring residents in the Greenwich Peninsula ward Report P25, P39, P68
- Users of up to 274 sqm of Class E commercial floorspace at ground floor Report P12
- Mayor of London (Stage II referral recipient)
- Royal Borough of Greenwich as local planning authority and through its Highways and Waste Management teams Report P67, P75, P80
Timeline
- August 2025: Environmental Statement, technical and design documents submitted in support of the application Report P4, P7, P8, P9
- 11 September 2025: Covering letter submitted by the applicant Report P2, P7
- November 2025: Environmental Statement Non-Technical Summary Rev P03 and ES Review Applicant Response Revision 1 issued Report P4, P9
- 2026-02-24: Royal Borough of Greenwich Planning Board resolves to grant full planning permission subject to referral, Section 106 and conditions
- Within 3 years of permission: Development must be begun before the expiration of three years from the date of permission (Section 91 requirement). Report P5
Plain English for the jargon
- AOD: Above Ordnance Datum, the standard height reference used for building heights in the United Kingdom.
- Class E: Use class covering commercial, business and service uses such as shops, cafes, offices, clinics, gyms and indoor sport.
- CEMP: Construction Environmental Management Plan, setting out dust, noise and other controls during building works.
- EIA / Environmental Statement: Environmental Impact Assessment and the formal report of likely significant environmental effects, required for certain larger developments.
- Section 106 agreement: A legal agreement under Section 106 of the Town and Country Planning Act 1990 used to secure planning obligations, such as affordable housing or financial contributions.
- Stage II referral: The step at which a planning application is referred to the Mayor of London, who can direct refusal or call it in if it raises strategic issues.