AI summaryRoyal Borough of Greenwich Planning Board grants full planning permission and listed building consent to install air source heat pumps in Building 10, Royal Arsenal Riverside, Woolwich, to decarbonise the existing energy centre.
Written from the decision and the officer reportPDF Pro
OutcomeApproved
MoneyNot stated
What happens nextWork to begin within three yearsStandard time limit condition under Section 91, Town and Country Planning Act 1990
Who it affectsNot stated
What was decided
The Planning Board granted full Planning Permission under ref 25/4134/F and Listed Building Consent under ref 25/4135/L for Air Source Heat Pumps in units 9 and 10 of Building 10, with associated internal and external works, to support decarbonisation of the existing energy centre.
An additional informative was added requiring residents to be told where noise monitoring will take place and what the results are, to confirm maximum noise levels are not exceeded.
The Assistant Director (Planning and Building Control) was authorised to make minor wording changes to the recommended conditions in Appendices 2 and 3, including any addendums, before issuing the final decision notice.
Why
The proposal forms part of the wider strategy to decarbonise the energy centre serving the Royal Arsenal Riverside Consent, previously approved under planning permission 21/2055/F.
Conditions are imposed to safeguard the special interest of the Grade II Listed Building, including matching materials, retaining existing roof trusses, and matching brickwork tint and pointing. Report P47, P93, P97, P100
Noise from mechanical plant must be at least 5 dB below background sound level at the nearest noise sensitive receptors, assessed in line with BS 4142:2014+A2:2020. Report P40
What happens next
Before any works start, the developer must submit and gain approval for the Demolition and Construction Management Plan, Construction Logistics Plan, surface water drainage strategy, cold plume analysis, and a noise assessment. Report P21, P29, P37, P40, P65
Detailed drawings, brick sample panels, materials specifications, lighting strategy and Swift box details must be approved in writing by the Local Planning Authority before relevant works commence. Report P47, P52, P56, P60
After construction, the renewable or low carbon energy equipment must be monitored and data submitted to the Council daily for five years, and a maintenance contract must be in place for the same period. Report P25, P26
Options considered
Chosen: Grant full Planning Permission and Listed Building Consent subject to conditions and an additional informative on resident engagement on noise monitoring. Recommended by officers and resolved by the Planning Board to support decarbonisation of the energy centre, subject to heritage, noise, drainage and construction safeguards.
Implications
Climate: Replaces part of the existing energy provision with air source heat pumps, supporting decarbonisation of the Royal Arsenal Riverside energy centre.
Legal: Listed Building Consent conditions require new work to match existing fabric in material, colour, texture and profile, and retain existing roof trusses. Report P93, P97
Risk: Construction phase must control dust, emissions, noise and vibration through an approved Demolition and Construction Management Plan, with deliveries scheduled outside 08:00-10:00 and 16:00-18:00 network peaks. Report P29, P30, P32
Equalities: Residents must be told where noise monitoring will occur and what the outcomes are, to provide reassurance that maximum noise levels are not exceeded.
Other: Surface water drainage must be agreed with the Lead Local Flood Authority because the site is partially in Flood Zone 2 within an area benefitting from flood defences, and lies over a Secondary Aquifer. Report P21, P71, P74
Who and where
Residents and occupiers of nearby residential properties in the Royal Arsenal Riverside area, including noise-sensitive receptors Report P40
Operators of commercial units 9 and 10 in Building 10, where the heat pumps will be installed
The Grade II Listed Building itself, with conditions aimed at safeguarding its special architectural and historic interest Report P47, P93, P97
Construction workforce and haulage contractors working to CLOCS and FORS standards Report P30, P38
Timeline
30 July 2014: Royal Greenwich Core Strategy with Detailed Policies adopted Report P118
November 2025: Energy and Heat Network Decarbonisation Report, Drainage Strategy, and Transport Technical Note submitted Report P4, P5
03.11.2025: Planning Statement submitted by Stantec Report P4
26.11.2025: Fire Statement and Air Quality Assessment submitted Report P5
27.11.2025: Preliminary Ecological Assessment and Biodiversity Net Gain submitted by Ecology Solutions Report P5
28.11.2025: Noise Impact Assessment submitted by Sol Acoustics and Structural Design Report by Buro Happold Report P5
December 2025: Heritage Statement and Schedule of Works and Method Statement submitted by Orion Report P4
04.12.2025: Statement of Community Involvement submitted by Lowick Report P5
2026-04-14: Planning Board resolves to grant full Planning Permission and Listed Building Consent
Plain English for the jargon
ASHP: Air Source Heat Pump, a system that transfers heat from outside air to provide heating and hot water
DCMP: Demolition and Construction Management Plan, setting out how dust, noise and traffic will be controlled during building works
CLP: Construction Logistics Plan, setting out vehicle routes, access and mitigation for construction traffic
LLFA: Lead Local Flood Authority, the council body responsible for managing local flood risk
AEMP: Automated Energy Monitoring Platform, used to record renewable energy equipment performance
BS 4142:2014+A2:2020: British Standard method for rating industrial and commercial sound against background noise
CLOCS: Construction Logistics and Community Safety, a standard for safer construction vehicle operations
FORS: Fleet Operators Recognition Scheme, a voluntary accreditation for safer and more efficient fleet operations
NPPF: National Planning Policy Framework, the government's planning policy for England
Flood Zone 2: Land assessed as having between a 1 in 100 and 1 in 1000 annual probability of river or sea flooding
What was decided, why, and what happens next
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item7
Resolved
Resolved that full Planning Permission and Listed Building Consent be GRANTED for the proposed installation of Air Source Heat Pumps in the eastern portion of Building 10, specifically within the commercial floorspace in units 9 and 10, previously approved under planning permission 21/2055/F, with other associated works to the internal and external elements of the building, to support the decarbonisation of the existing energy centre as part of the overall strategy for Royal Arsenal Riverside Consent subject to the Conditions set out in Appendix 2 of the report and its addendum in respect of Ref 25/4134/F and Appendix 3 of the report in respect of Ref 25/4135/L with an additional informative in relation to Ref 25/4134/F requiring that - Residents are informed of where the noise monitoring locations will be and what the outcome of the monitoring is to provide reassurance that the maximum noise levels are not exceeded. That the Assistant Director (Planning & Building Control) to make any minor changes to the detailed wording of the recommended conditions as set out in the Appendix 2 and Appendix 3 of the report, its addendums and the minutes of this Planning Board meeting, where the Assistant Director (Planning & Building Control) considers it appropriate, before issuing the final decision notice.
Word for word from the decision Greenwich published for this meeting.Source: committees.royalgreenwich.gov.uk
Documents: Design and Access Statement; Planning Statement dated 03.11.2025 by Stantec; Heritage Statement dated December 2025 by Orion;
ITEM NO: 7 - Appendices PAGE NO: 1 APPENDICES Energy and Heat Network Decarbonisation Report dated November 2025 by Hodkinson; Preliminary Ecological Assessment and Biodiversity Net Gain dated 27.11.2025 by Ecology Solutions; Noise Impact Assessment dated 28.11.2025 by Sol Acoustics; Drainage Strategy dated November 2025 by Waterman; Fire Statement dated 26.11.2025 prepared by BB7; Air Quality Assessment dated 26.11.2025 by Logika Group; Transport Technical Note (inc. CMP/CLP) dated November 2025 by Iceni; Statement of Community Involvement dated 04.12.2025 by Lowick; Schedule of Works and Method Statement dated December 2025 by Orion; Structural Design Report dated 28.11.2025 by Buro Happold; Materials Specification for Replacement Features;
Ref. 25/4135/L The following drawings and documents have been submitted by the applicant to accompany application reference 25/4134/F:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.