Royal Borough of Greenwich
Planning Board, Tuesday 14 April 2026 at 6.30pm

Building 10, Station Way, Royal Arsenal Riverside, Woolwich SE18 6SU - Ref: 25/4134/F & 25/4135/L

Approved Planning 3 papers

AI summaryRoyal Borough of Greenwich Planning Board grants full planning permission and listed building consent to install air source heat pumps in Building 10, Royal Arsenal Riverside, Woolwich, to decarbonise the existing energy centre.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeApproved
MoneyNot stated
What happens nextWork to begin within three yearsStandard time limit condition under Section 91, Town and Country Planning Act 1990
Who it affectsNot stated

What was decided

The Planning Board granted full Planning Permission under ref 25/4134/F and Listed Building Consent under ref 25/4135/L for Air Source Heat Pumps in units 9 and 10 of Building 10, with associated internal and external works, to support decarbonisation of the existing energy centre.

An additional informative was added requiring residents to be told where noise monitoring will take place and what the results are, to confirm maximum noise levels are not exceeded.

The Assistant Director (Planning and Building Control) was authorised to make minor wording changes to the recommended conditions in Appendices 2 and 3, including any addendums, before issuing the final decision notice.

Why

The proposal forms part of the wider strategy to decarbonise the energy centre serving the Royal Arsenal Riverside Consent, previously approved under planning permission 21/2055/F.

Conditions are imposed to safeguard the special interest of the Grade II Listed Building, including matching materials, retaining existing roof trusses, and matching brickwork tint and pointing. Report P47, P93, P97, P100

Noise from mechanical plant must be at least 5 dB below background sound level at the nearest noise sensitive receptors, assessed in line with BS 4142:2014+A2:2020. Report P40

What happens next

Before any works start, the developer must submit and gain approval for the Demolition and Construction Management Plan, Construction Logistics Plan, surface water drainage strategy, cold plume analysis, and a noise assessment. Report P21, P29, P37, P40, P65

Detailed drawings, brick sample panels, materials specifications, lighting strategy and Swift box details must be approved in writing by the Local Planning Authority before relevant works commence. Report P47, P52, P56, P60

After construction, the renewable or low carbon energy equipment must be monitored and data submitted to the Council daily for five years, and a maintenance contract must be in place for the same period. Report P25, P26

Options considered

  • Chosen: Grant full Planning Permission and Listed Building Consent subject to conditions and an additional informative on resident engagement on noise monitoring. Recommended by officers and resolved by the Planning Board to support decarbonisation of the energy centre, subject to heritage, noise, drainage and construction safeguards.

Implications

  • Climate: Replaces part of the existing energy provision with air source heat pumps, supporting decarbonisation of the Royal Arsenal Riverside energy centre.
  • Legal: Listed Building Consent conditions require new work to match existing fabric in material, colour, texture and profile, and retain existing roof trusses. Report P93, P97
  • Risk: Construction phase must control dust, emissions, noise and vibration through an approved Demolition and Construction Management Plan, with deliveries scheduled outside 08:00-10:00 and 16:00-18:00 network peaks. Report P29, P30, P32
  • Equalities: Residents must be told where noise monitoring will occur and what the outcomes are, to provide reassurance that maximum noise levels are not exceeded.
  • Other: Surface water drainage must be agreed with the Lead Local Flood Authority because the site is partially in Flood Zone 2 within an area benefitting from flood defences, and lies over a Secondary Aquifer. Report P21, P71, P74

Who and where

  • Residents and occupiers of nearby residential properties in the Royal Arsenal Riverside area, including noise-sensitive receptors Report P40
  • Operators of commercial units 9 and 10 in Building 10, where the heat pumps will be installed
  • The Grade II Listed Building itself, with conditions aimed at safeguarding its special architectural and historic interest Report P47, P93, P97
  • Construction workforce and haulage contractors working to CLOCS and FORS standards Report P30, P38

Timeline

  • 30 July 2014: Royal Greenwich Core Strategy with Detailed Policies adopted Report P118
  • November 2025: Energy and Heat Network Decarbonisation Report, Drainage Strategy, and Transport Technical Note submitted Report P4, P5
  • 03.11.2025: Planning Statement submitted by Stantec Report P4
  • 26.11.2025: Fire Statement and Air Quality Assessment submitted Report P5
  • 27.11.2025: Preliminary Ecological Assessment and Biodiversity Net Gain submitted by Ecology Solutions Report P5
  • 28.11.2025: Noise Impact Assessment submitted by Sol Acoustics and Structural Design Report by Buro Happold Report P5
  • December 2025: Heritage Statement and Schedule of Works and Method Statement submitted by Orion Report P4
  • 04.12.2025: Statement of Community Involvement submitted by Lowick Report P5
  • 2026-04-14: Planning Board resolves to grant full Planning Permission and Listed Building Consent

Plain English for the jargon

  • ASHP: Air Source Heat Pump, a system that transfers heat from outside air to provide heating and hot water
  • DCMP: Demolition and Construction Management Plan, setting out how dust, noise and traffic will be controlled during building works
  • CLP: Construction Logistics Plan, setting out vehicle routes, access and mitigation for construction traffic
  • LLFA: Lead Local Flood Authority, the council body responsible for managing local flood risk
  • AEMP: Automated Energy Monitoring Platform, used to record renewable energy equipment performance
  • BS 4142:2014+A2:2020: British Standard method for rating industrial and commercial sound against background noise
  • CLOCS: Construction Logistics and Community Safety, a standard for safer construction vehicle operations
  • FORS: Fleet Operators Recognition Scheme, a voluntary accreditation for safer and more efficient fleet operations
  • NPPF: National Planning Policy Framework, the government's planning policy for England
  • Flood Zone 2: Land assessed as having between a 1 in 100 and 1 in 1000 annual probability of river or sea flooding
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item7

Resolved

Resolved that full Planning Permission and Listed Building Consent be GRANTED for the proposed installation of Air Source Heat Pumps in the eastern portion of Building 10, specifically within the commercial floorspace in units 9 and 10, previously approved under planning permission 21/2055/F, with other associated works to the internal and external elements of the building, to support the decarbonisation of the existing energy centre as part of the overall strategy for Royal Arsenal Riverside Consent subject to the Conditions set out in Appendix 2 of the report and its addendum in respect of Ref 25/4134/F and Appendix 3 of the report in respect of Ref 25/4135/L with an additional informative in relation to Ref 25/4134/F requiring that - Residents are informed of where the noise monitoring locations will be and what the outcome of the monitoring is to provide reassurance that the maximum noise levels are not exceeded. That the Assistant Director (Planning & Building Control) to make any minor changes to the detailed wording of the recommended conditions as set out in the Appendix 2 and Appendix 3 of the report, its addendums and the minutes of this Planning Board meeting, where the Assistant Director (Planning & Building Control) considers it appropriate, before issuing the final decision notice.
Word for word from the decision Greenwich published for this meeting. Source: committees.royalgreenwich.gov.uk

Follow this further

Built from Greenwich's papers

What the report saysPro

Report to Planning Board

APPENDICES Appendix 1 - Drawing numbers

Ref. 25/4134/F The following drawings and documents have been submitted by the applicant to accompany application reference 25/4134/F:

Drawings: Site Information Drawings: Z487-TPB02-SW-00-DR-A-110-101-P01 – Site Location Plan; Z487-TPB02-SW-RF-DR-A-110-110-P01 – Proposed Site Plan; Existing Building Drawings: Z487-TPB02-EC-00-DR-A-115-100-P03 – Existing Plan, Level 00; Z487-TPB02-EC-01-DR-A-115-101-P03 – Existing Plan, Level 01; Z487-TPB02-EC-RF-DR-A-115-110-P01 – Existing Plan, Roof Level; Z487-TPB02-EC-ZZ-DR-A-115-201-P03 – Existing Elevations, Sheet 1; Z487-TPB02-EC-ZZ-DR-A-115-301-P01 – Existing Sections, Sheet 1; Details Drawings: Z487-TPB02-EC-ZZ-DR-A-195-501-P01 – Details, Sheet 1; Z487-TPB02-EC-ZZ-DR-A-195-502-P01 - Details, Sheet 2; Demolition Drawings: Z487-TPB02-EC-00-DR-A-200-100-P02 – Demolition Plans, Level 00; Z487-TPB02-EC-01-DR-A-200-101-P02 – Demolition Plans, Level 01; Z487-TPB02-EC-RF-DR-A-200-110-P01 – Demolition Plans, Roof Level; Z487-TPB02-EC-ZZ-DR-A-200-201-P02 – Demolition Elevations Sheet 1; Proposed Drawings: Z487-TPB02-EC-00-DR-A-880-100-P02 – Proposed Plan, Level 00; Z487-TPB02-EC-01-DR-A-880-101-P02 – Proposed Plan, Level 01; Z487-TPB02-EC-02-DR-A-880-102-P01 – Proposed Plan, Level 02; Z487-TPB02-EC-RF-DR-A-880-110-P01 – Proposed Plan, Roof Level; Z487-TPB02-EC-ZZ-DR-A-880-201-P02 – Proposed Elevations; Z487-TPB02-EC-ZZ-DR-A-880-301-P02 – Proposed Sections; Z487-TPB02-SW-ZZ-DR-A-110-201-P01 – Site Wide, Proposed Elevations, Sheet 1 Access and Escape Drawings: Z487-TPB02-EC-00-DR-A-155-100-P01 – Escape Strategy Plan, Level 00 Z487-TPB02-EC-01-DR-A-155-101-P01 – Escape Strategy Plan, Level 01; Z487-TPB02-EC-02-DR-A-155-102-P01 – Escape Strategy Plan, Level 02;

Documents: Design and Access Statement; Planning Statement dated 03.11.2025 by Stantec; Heritage Statement dated December 2025 by Orion;

ITEM NO: 7 - Appendices PAGE NO: 1 APPENDICES Energy and Heat Network Decarbonisation Report dated November 2025 by Hodkinson; Preliminary Ecological Assessment and Biodiversity Net Gain dated 27.11.2025 by Ecology Solutions; Noise Impact Assessment dated 28.11.2025 by Sol Acoustics; Drainage Strategy dated November 2025 by Waterman; Fire Statement dated 26.11.2025 prepared by BB7; Air Quality Assessment dated 26.11.2025 by Logika Group; Transport Technical Note (inc. CMP/CLP) dated November 2025 by Iceni; Statement of Community Involvement dated 04.12.2025 by Lowick; Schedule of Works and Method Statement dated December 2025 by Orion; Structural Design Report dated 28.11.2025 by Buro Happold; Materials Specification for Replacement Features;

Ref. 25/4135/L The following drawings and documents have been submitted by the applicant to accompany application reference 25/4134/F:

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Appendices to Building 10, Station Way Ref- 25-4134-F & 25-4135-L PBReport 130 KB DownloadRead as text
PDF
Building 10, Station Way, Royal Arsenal Riverside, Woolwich SE18 6SU: Ref: 25/4134/F & 25/4135/LReport 1.3 MB Download
PDF
Item 7: Addendum to Building 10, Station Way Ref- 25-4134-F & 25-4135-L PBAddendum 61 KB Download

At this meeting

Whole meeting

Who was there

6 of 14 attended
GD
Councillor Gary DillonChair, apologies
SB
Councillor Sandra BauerVice-Chair, apologies
OB
Councillor Olu BabatolaCommittee Member, apologies
CB
Councillor Clare Burke-McDonaldCommittee Member, apologies
MR
Councillor Maisie Richards CottellCommittee Member, present
DG
Councillor David GardnerCommittee Member, present
CO
Councillor Calum O'Byrne MulliganCommittee Member, present
‘H
Councillor ‘Lade Hephzibah OlugbemiCommittee Member, apologies
DS
Councillor Dave SullivanCommittee Member, present
PG
Councillor Patricia GreenwellCommittee Member, present
TR
Councillor Tamasin RhymesCommittee Member, present
VG
Victoria GeogheganOfficer, in attendance

All 14 on the meeting page

More from Greenwich Planning Board

All decisions
MeetingDecisionOutcome
24 Sep 2026 Former Lewisham College, 1 Deptford Bridge, London, SE8 4HH - Ref: 25/0798/FResolved – That consideration of the application be DEFERRED pending Lewisham Council’s determination of the applicat... Deferred Open
24 Sep 2026 Land at 71-73 Nathan Way, Thamesmead, London, SE28 0BQ - Ref: 26/1040/FResolved - That full planning permission be GRANTED for: A . The Erection of industrial warehouse buildings for flexi... Agreed Open
21 Jul 2026 STC Ivor Grove Sports Club, Ivor Grove, Eltham, London, SE9 2AJResolved that full planning permission be REFUSED for the demolition of all existing sports club buildings and redeve... Refused Open
21 Jul 2026 Land to the east of East Parkside, south of Edmund Halley Way and west of Olympian Way ('Plot 20.02'), Greenwich Peninsula SE10Resolved that full planning permission be GRANTED for the temporary use of land for up to 10 years for the installati... Agreed Open
21 Jul 2026 Garage Sites Opposite to 48 - 53 Sewell Road SE2 9XW & 23 Ampleforth Road SE2 9BD - 17 Sewell Road SE2 9XNResolved that full planning permission be GRANTED for the redevelopment of 2 sites, comprising residential dwellings ... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies