Land bounded by 58 Wood Lane and Westway, London W12 7RZ, College Park and Old Oak, 2021/03751/FUL
ApprovedPlanning1 paper
Planning and Development Control Committee approved this item on Tuesday 7 June 2022. Below is the council's own wording, with the papers it was decided on.
RESOLVED THAT: Planning Application 2021/03751/FUL be approved subject to: 1. That the Chief Planning Officer be authorised to grant permission subject to the conditions listed below. 2. That the Chief Planning Officer after consultation with the Assistant Director, Legal Services and the Chair of the Planning and Development Control Committee be authorised to make any minor changes to the proposed conditions, which may include the variation, addition or deletion of conditions, any changes shall be within their discretion.
Word for word from the decision Hammersmith & Fulham published for this meeting.Source: democracy.lbhf.gov.uk
Description: Erection of five temporary structures measuring 11.5m to 26.1m in height to provide; two theatre event spaces; restaurant / exhibition / food hall space; wellbeing and collaborate space; and ancillary front of house space for a temporary period of 10 years, together with temporary access via a proposed link bridge to the south, landscaping and associated works. Drawing Nos: See Condition No.2
Application Type: Full Detailed Planning Application
Officer Recommendation:
1) That the Committee resolve that the Chief Planning Officer be authorised to grant permission subject to the conditions listed below.
2) That the Chief Planning Officer after consultation with the Head of Law and the Chair of the Planning and Development Control Committee be authorised to make any minor changes to the proposed conditions, which may include the variation, addition or deletion of conditions, any changes shall be within their discretion.
Conditions:
TEMPORARY PERMISSION
1. The use is permitted only for a limited period only and shall be discontinued on or before 31st June 2032 upon which all the temporary associated structures and equipment hereby approved shall be removed from site and the site shall be restored to its former condition.
To comply with the wider regeneration of the site and to allow the Council to assess the impact of the operation of the use on the amenities of surrounding occupiers in accordance with Policies DC1, DC2 and DC8 of the Local Plan 2018.
DRAWINGS
2. The development hereby permitted shall be carried out in accordance with the following drawings and documents submitted:
Location Plan (P-TTL-LC-21-001); Block Plan (P-TTL-LC-21-003); Uses Ground Floor (P-TTL-LC-21-004); Uses Upper Ground (P-TTL-LC-21-005); Uses Level One (P-TTL-LC-21-006); Uses Level Two (P-TTL-LC-21-007); Elevations (P-TTL-LC-21-008); Street (P-TTL-LC-21-025); Access (P-TTL- LC-21-029); Lighting (P-TTL-LC-21-036); and Site Levels (P-TTL-LC-21- 045).
To ensure full compliance with the planning application hereby approved and to prevent harm arising through deviations from the approved plans, in accordance with Policies D1, D2, D3, D4, D5, D8, D9, D11, D12, D13, HC1, HC3, HC4 and G7 of the London Plan 2021, and Policies DC1, DC2, DC3, DC4, DC7 and DC8 of the Local Plan 2018 and Key Principles of the Planning Guidance SPD 2018.
GROSS FLOORSPACE
3. Overall gross maximum floor space by land use, notwithstanding the provisions of the Town and Country Planning (Use Classes Order 1987) (as amended) or (General Permitted development) Order 1995 (as amended) or any subsequent act, shall not exceed the following:
Theatre / Events (Sui Generis): 1,792 sqm Food and Drink (Use Class E(b)): 1,093 sqm Experience Atrium / Exhibit (Sui Generis): 708 sqm Gym / Fitness (Use Class E(d)): 564 sqm Offices / Collaborate (Use Class E(g)(i)): 251 sqm Rooftop Bar / Terrace (Sui Generis): 398 sqm
To ensure the development carried out does not exceed the cumulative maximum floor space, in accordance with the approved plans and to ensure a suitable mix and distribution of land uses within the development, in accordance with the NPPF 2018, Policies D1, D5, D8, HC1, HC5 and HC6 of the London Plan 2021, and Policies TLC1, TLC5, CF1, and CF2 of the Local Plan 2018.
CONSTRUCTION LOGISTICS PLAN
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Planning and Development Control Committee at Hammersmith & Fulham and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.