Former Dairy Crest Site, Land Beneath and Bounded by Westway and West London Railway Line and Adjoining 58 Wood Lane, London W12, College Park And Old Oak, 2025/02724/VAR

Agreed Planning 1 paper

AI summaryHammersmith and Fulham committee authorises officer to grant permission to vary seven conditions on the Imperial College White City outline scheme, raising academic floorspace, lifting a building height cap, switching to at-grade servicing and a heat pump energy system.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeAgreedSubject to legal agreement and conditions in the report
MoneyNo sums stated in the supplied report
What happens nextComplete legal agreement, then grantOfficer may make minor changes to terms or conditions
Who it affectsCollege Park and Old Oak wardFormer Dairy Crest site, White City W12

What was decided

The committee resolved to authorise the Executive Director of Place to grant planning permission once a satisfactory legal agreement is completed and the conditions in the report (as amended by the addendum) are met. Report P15, P16, P17

The Executive Director, in consultation with the Assistant Director of Legal Services and the committee chair, may make minor changes to the legal agreement heads of terms or to the conditions, including varying, adding or deleting conditions. Report P17

Seven conditions on the 28 April 2021 outline permission (ref 2018/00267/OUT) are varied: conditions 4 (Design Codes and Parameters), 14 (Use/Floorspace), 36 (BREEAM), 84 (maximum residential car parking), 85 (maximum non-residential car parking), 86 (electric vehicle charging points) and 87 (disabled parking spaces). Report P9, P10, P11

Why

The variation allows up to 42,200 sqm of academic (Class D1) floorspace in Development Zone 3, with no change to the development zone or masterplan boundaries. Report P11, P74

Design changes lift the southern maximum building height in DZ3 from +70.35 AOD to +77.35 AOD, add an 8m eastern setback at upper levels and adjust the colonnade zone limits to give more flexibility around the Arrival Square and Western Access Road. Report P11

Servicing moves from a basement tunnel network to an at-grade arrangement that prioritises pedestrians, and the energy strategy drops the CHP-powered energy centre in favour of a heat pump-led system with the option to connect into a wider heat network. Report P11, P140, P141

What happens next

The Section 73 application must be supported by a legal agreement; the Executive Director can sign off the final terms after consulting legal services and the committee chair. Report P15, P16, P17

Reserved matters applications for Phase 2 must be submitted within 10 years of 28 April 2021, Phase 3 within 18 years and Phase 4 within 20 years, with each phase to begin within two years of its reserved matters approval. Report P23, P24, P25, P26

A series of pre-commencement conditions require further approvals, including design codes, demolition and construction management plans, an updated energy statement, drainage and SuDS strategies, archaeology, contamination reports, an air quality monitoring programme and Secure by Design details. Report P18, P27, P30, P34, P40, P44, P49, P52, P58, P90, P98, P101, P105, P109, P112, P118, P125, P128, P140, P143, P148, P158, P161, P168

Options considered

  • Chosen: Grant planning permission, subject to legal agreement and conditions. Officer recommendation in the report Report P15, P16

Implications

  • Legal: Permission can only be issued once a satisfactory legal agreement is in place; the Executive Director can make minor changes to heads of terms or conditions in consultation with legal services and the committee chair. Report P16, P17
  • Climate: Energy strategy replaces a CHP-powered energy centre with a heat pump-led system and the ability to connect to a wider heat network; the development must still meet BREEAM and Home Quality Mark standards. Report P11, P140, P141, P143, P145
  • Financial: A CIL Phasing Plan must be approved before any part of the development is carried out, so each chargeable phase can be identified for the Community Infrastructure Levy. Report P35, P36, P37
  • Risk: Conditions require detailed management plans covering demolition, construction, logistics, air quality and dust, plus monitoring reports, secured by design measures, blast-resistant glazing, contamination remediation, drainage and flood risk, and archaeology, to protect surrounding occupiers, transport infrastructure and the environment. Report P41, P43, P47, P52, P57, P62, P90, P94, P98, P101, P105, P109, P112, P118, P125, P128, P130, P140, P150, P155, P158, P168
  • Other: Up to 373 residential units, 178,102 sqm of research and development or business floorspace, a 9,290 sqm hotel, 13,539 sqm of active uses and 42,200 sqm of academic floorspace are permitted, capped at 242,255 sqm above ground and 267,427 sqm in total. Report P70, P71, P74, P75, P76, P78, P79, P80, P86

Who and where

  • The applicant, Imperial College London Report P9
  • Future residents, workers, students and visitors to the seven-zone White City masterplan Report P10, P11, P74, P78, P79
  • Occupiers and businesses around the Wood Lane Conservation Area, the Westway and the West London Railway Line Report P2, P8, P10
  • Transport for London and Network Rail, given the site is above the Central Line Report P10, P11, P41

Timeline

  • 28 April 2021: Original outline planning permission granted (ref 2018/00267/OUT) Report P9, P10
  • Within 10 years of 28 April 2021: Deadline for Phase 2 reserved matters applications Report P24
  • Within 18 years of 28 April 2021: Deadline for Phase 3 reserved matters applications Report P25
  • Within 20 years of 28 April 2021: Deadline for Phase 4 reserved matters applications Report P26
  • 29 November 2024: Reserved matters approval for Phase 1 (ref 2024/00947/RES) Report P23
  • 06.10.2025: Section 73 application validated Report P8
  • 14.04.2026: Planning and Development Control Committee resolves to authorise grant Report P9

Plain English for the jargon

  • Section 73 application: Application to vary or remove conditions attached to an existing planning permission
  • Outline planning permission: Permission that establishes the principle of a development, with details reserved for later approval
  • Reserved matters: Details such as appearance, landscaping, layout, scale and access that must be approved before development begins
  • Development Zone: One of seven numbered areas (DZ1 to DZ7) that make up the outline masterplan
  • AOD: Above Ordnance Datum, the standard UK height reference in metres
  • GEA: Gross External Area, a measure of a building's total floorspace measured to the outside of external walls
  • BREEAM: Building Research Establishment Environmental Assessment Method, used to rate the sustainability of buildings
  • CHP: Combined Heat and Power, a system that generates electricity and captures useful heat
  • CIL: Community Infrastructure Levy, a charge developers pay to fund local infrastructure
  • SuDS: Sustainable Drainage Systems, designed to manage surface water close to where it falls
  • ULEZ: Ultra Low Emission Zone, an area where vehicles must meet certain emissions standards
  • Secure by Design: Police-led scheme that sets standards for crime prevention in new developments
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item5

Resolved

RESOLVED That the Executive Director of Place be authorised to grant planning permission upon the completion of a satisfactory legal agreement and subject to the conditions listed in the report as amended by the Addendum. That the Executive Director of Place, after consultation with the Assistant Director of Legal Services and the Chair of the Planning and Development Control Committee, be authorised to make any minor changes to the proposed Heads of Terms of the legal agreement or proposed conditions, which may include the variation, addition or deletion of conditions, any such changes shall be within their discretion.
Word for word from the decision Hammersmith & Fulham published for this meeting. Source: democracy.lbhf.gov.uk

Follow this further

Built from Hammersmith & Fulham's papers

What the report saysPro

Report to Planning and Development Control Committee

-------------------------------------------------------------------------------------------------------------------- Ward: College Park And Old Oak

Site Address: Former Dairy Crest Site, Land Beneath and Bounded by Westway and West London Railway Line and Adjoining 58 Wood Lane, London W12

ICL White City Campus North

ICL White City RBKC Campus South

St James: White City Living

© Crown Copyright. All Rights Reserved. London Borough Hammersmith and Fulham LA100019223 (2013). For identification purposes only - do not scale.

Reg. No: Case Officer: 2025/02724/VAR Jesenka Oezdalga

Date Valid: Conservation Area: 06.10.2025 Wood Lane Conservation Area - Number 42

Committee Date: Applicant: 14.04.2026 Imperial College London C/O Agent Description: Application under Section 73 of the Town and Country Planning Act (1990) for variation to: Condition 4 (Design Codes and Parameters); Condition 14 (Use/Floorspace); Condition 36 (BREEAM); Condition 84 (Maximum Residential Car Parking); Condition 85 (Maximum Non-Residential Car Parking); Condition 86 (Electric Vehicle Charging Points) and Condition 87 (Disabled Parking Spaces); to Outline Planning Permission dated 28th April 2021 (ref. 2018/00267/OUT); as amended by Non-Material Amendment Application (ref.2025/00473/NMAT) for:

'Outline planning application for a mixed use development delivered as a phased masterplan, comprising 7 development zones, accommodating research & development, offices and other business uses in 6-13 storey buildings; up to 373 residential units in 18-32 storey buildings; a hotel up to 8 storeys and associated facilities; non-residential institution use; community and/or leisure uses and retail, cafes, restaurants and bars, together with access, bridge over the railway (Central Line), parking, servicing and; and the demolition of Stadium House.'

The amendments include: increase of D1 floorspace within Development Zone 3 (‘DZ3’) to allow up to 42,200 sqm of academic use, with no changes to the development zone or masterplan boundaries; minor design changes to DZ3, including an increase in the southern maximum building height from +70.35 AOD to +77.35 AOD; a revised 8m eastern setback at upper levels, and adjustments to the colonnade zone limits to provide greater flexibility in addressing the 'Arrival Square' and 'Western Access Road'; amendments to the servicing strategy by replacing the previously approved basement tunnel network with an at-grade servicing arrangement that prioritises pedestrian movement and a revision of the energy strategy, to remove the CHP-powered energy centre, in favour of a heat pump-led system and ability to connect into a wider heat network.

This application is accompanied by an Environmental Impact Assessment.

Drg Nos: As per Condition 3 below

Application Type: Vary or Delete Conditions Full/Outline

Officer Recommendation:

1) That the Committee resolve that the Executive Director of Place be authorised to grant planning permission upon the completion of a satisfactory legal agreement and subject to the conditions listed below.

2) That the Committee resolve that the Executive Director of Place, after consultation with the Assistant Director of Legal Services and the Chair of the Planning and Development Control Committee, be authorised to make any minor changes to the proposed Heads of Terms of the legal agreement or proposed conditions, which may include the variation, addition or deletion of conditions, any such changes shall be within their discretion. CONDITIONS

1) Details Reserved Matters Prior to Commencement of the Development hereby approved (in Outline) hereby approved in each Phase or part thereof (other than Demolition, Ground and Enabling Works, approved pursuant to Condition 6), the following Reserved Matters details shall be submitted to and approved in writing by the Local Planning Authority:

• Appearance • Landscaping • Layout • Scale • Means of access

The Development shall be carried out in full accordance with the approved details.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Former Dairy Crest Site, Land Beneath and Bounded by Westway and West London Railway Line and Adjoining 58 Wood Lane, London W12, College Park And Old Oak, 2025/02724/VARReport 2.2 MB DownloadRead as text

At this meeting

Whole meeting

Who was there

6 of 8 attended
NS
Councillor Nikos SouslousChair, present
NT
Councillor Nicole TrehyVice-Chair, present
RM
Councillor Ross MeltonCommittee Member, present
PW
Councillor Patrick WalshCommittee Member, apologies
AP
Councillor Adrian Pascu-TulbureCommittee Member, present
CN
Councillor Callum NimmoCommittee Member, apologies
LP
Councillor Lydia PaynterCommittee Member, present
AK
Councillor Alex KarmelCommittee Member, present

On this subject at Hammersmith & Fulham

Search all
  1. Former Dairy Crest Site, Land Beneath and Bounded by Westway and West London Railway Line and Adjoining 58 Wood Lane, London W12, College Park And Old Oak, 2025/02724/VARThis decision
  2. Former Dairy Crest Site, Land Beneath and Bounded by Westway and West London Railway Line and Adjoining 58 Wood Lane, W12, College Park and Old Oak 2012/02454/OUTAgreed
  3. Former Dairy Crest Site Land Beneath and Bounded by Westway and West London Railway Line and Adjoining 58 Wood Lane London W12, College Park and Old Oak 2012/02454/OUT and 2012/02455/CACAgreed

More from Hammersmith & Fulham Planning and Development Control Committee

All decisions
MeetingDecisionOutcome
15 Sep 2026 Unit 1b, Waterside Tower, The Boulevard, London, SW6 2UB, Sands End, P/2026/01012/FULRESOLVED That the Director of Planning and Property be authorised to grant planning permission subject to the conditi... Decided Open
15 Sep 2026 40 Barclay Road, London, Hammersmith and Fulham, SW6 1EH, Walham Green, P/2026/01137/FULRESOLVED That the Director of Planning and Property be authorised to grant planning permission subject to the conditi... Decided Open
15 Sep 2026 Land North of Westfield London Shopping Centre, Ariel Way, London W12, Shepherd's Bush Green, 2025/03376/VARRESOLVED That subject to there being no contrary direction from the Mayor of London, the Director of Planning and Pro... Agreed Open
15 Sep 2026 Land At Albert Wharf and Swedish Wharf, Wandsworth Bridge Road, London SW6 2TY, Sands End, 2025/02448/VARRESOLVED That subject to there being no contrary direction from the Mayor for London, that the Director of Planning a... Agreed Open
15 Sep 2026 1 - 3 Sussex Place, London, W6 9EA, Hammersmith Broadway, P/2026/00633/FULRESOLVED That subject to there being no contrary direction from the Mayor for London, that the Director of Planning a... Agreed Open