Planning and Development Control Committee, Tuesday 7 July 2026 at 7.00pm

72 - 76 Railway Arches, Ranelagh Gardens, London SW6 3UH, Palace and Hurlingham, 2026/00249/FUL

Agreed Planning 1 paper

AI summaryHammersmith & Fulham Planning Committee approved plans to refurbish 5 railway arches at 72-76 Ranelagh Gardens for flexible Class E commercial use, subject to 30 conditions and a legal agreement.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeAgreedSubject to legal agreement and 30 planning conditions
MoneyNot stated
What happens nextLegal agreement to be completedBefore planning permission is granted
Who it affectsNot stated

What was decided

The committee authorised the Executive Director for Place to grant planning permission, subject to a satisfactory legal agreement and the conditions set out in the report and any addendum. Report P7, P8

The Executive Director for Place, in consultation with the Assistant Director of Legal Services and the Committee Chair, was authorised to make minor changes to the legal agreement terms or conditions. Report P8

Why

The scheme is consistent with the Railway Arches Supplementary Planning Document (2022), supporting viable employment, neighbouring amenity, sustainable transport, and active frontage improvements. Report P93, 4.5

The proposals would preserve and enhance the Hurlingham and Putney Bridge conservation areas, complying with section 72 of the Planning (Listed Buildings and Conservation Areas) Act 1990. Report P94

The development would not cause unacceptable harm to neighbouring residential amenity in terms of daylight, outlook, privacy, noise, or disturbance, subject to conditions. Report P95

What happens next

A satisfactory legal agreement must be completed before the planning permission is granted. Report P7

The development must begin within 3 years of the date of the planning permission, in line with condition 1. Report P9, P10

The applicant is asked to consider Secured by Design crime prevention guidance from the Metropolitan Police. Report P98, P99, P100

Options considered

  • Chosen: Grant planning permission subject to a legal agreement and conditions (officer recommendation). The proposal complies with the London Plan (2021), Local Plan (2018), and the Railway Arches SPD (2022), and is acceptable on land use, design, residential amenity, transport, and environmental grounds. Report P6, P7, P93, P94, P95, P96, P97

Implications

  • Legal: A legal agreement is required before planning permission can be granted, securing highway works and other obligations. Report P7, P8, P96
  • Equalities: The site falls within Flood Zone 3, the Thames Policy Area, an Archaeological Priority Area, and two conservation areas, requiring detailed design and mitigation. Report P114, P94
  • Climate: Air Source Heat Pumps and electric water heaters are required for space heating, hot water, and cooling to manage air quality impacts. Report P69, P70
  • Risk: A staged land contamination assessment (preliminary risk assessment through to verification and long-term monitoring) is required before development starts. Report P45, P47, P48, P55, P59

Who and where

  • Residents of Hurlingham Court, Ranelagh Gardens, Carrara Wharf, and Milton Court who objected to the scheme Report P112, P113, P126
  • Users of the Thames Path, which runs partly along the site Report P114
  • Small and medium enterprises seeking flexible Class E commercial space in the borough Report P93

Timeline

  • 26 November 2025: Application form received by the Council Report P108
  • 02.02.2026: Application validated Report P4
  • 07.07.2026: Planning and Development Control Committee meeting date Report P4
  • Within 3 years of permission: Time limit for the development to begin (condition 1) Report P9

Plain English for the jargon

  • Class E: Use class covering commercial, business and service uses such as retail, cafes, offices, indoor sport, creches, and clinics.
  • PTAL 6a: Public Transport Accessibility Level rating of 6a, indicating excellent access to public transport.
  • Sui Generis: A planning use class of its own kind, outside the standard use classes.
  • ASHP: Air Source Heat Pump, a low-carbon heating and cooling system.
  • NRMM: Non-Road Mobile Machinery used on construction sites, subject to emissions standards.
  • Secured by Design (SBD): A police crime prevention initiative that sets standards for safer building design.
  • DSP: Delivery and Servicing Plan, a document setting out how deliveries and waste collections will be managed.
  • CLP: Construction Logistics Plan, detailing how construction traffic and works will be managed.
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item9

Resolved

RESOLVED That the Executive Director for Place be authorised to grant planning permission upon the completion of a satisfactory legal agreement and subject to the conditions listed in the report and changes in the Addendum. That the That the Executive Director for Place, after consultation with the Assistant Director of Legal Services and the Chair of the Planning and Development Control Committee be authorised to make any minor changes to the proposed Heads of Terms of the legal agreement or proposed conditions, which may include the variation, addition or deletion of conditions, any such changes shall be within their discretion.
Word for word from the decision Hammersmith & Fulham published for this meeting. Source: democracy.lbhf.gov.uk

Follow this further

Built from Hammersmith & Fulham's papers

What the report saysPro

Report to Planning and Development Control Committee

Ward: Palace and Hurlingham

Site Address: 72 - 76 Railway Arches Ranelagh Gardens, London SW6 3UH

Reg. No: Case Officer: 2026/00249/FUL Ronny Ferley

Date valid: Conservation Area: 02.02.2026 Hurlingham Conservation Area - No.4 / Putney Bridge Committee Date: Conservation Area - No.40 07.07.2026 Applicant: [name removed] for London Victoria Station House 191 Victoria Street London SW1E 5NE

Description: Installation of new commercial frontages and rear facades to railway arches 72-76 Ranelagh Gardens; demolition of rear extensions at arches 75/76; installation of new fencing to yard space fronting Thames path; installation of new lighting and wayfinding; change of use of existing yard space from car rental use (Class Sui Generis) into flexible use within Class E; use of arches 72/73 within Class E (commercial, business and service). Application type: Full Detailed Planning Application

Officer Recommendation:

(1) That the Committee resolve that the Executive Director of Place be authorised to grant planning permission upon the completion of a satisfactory legal agreement and subject to the conditions listed below.

(2) That the Committee resolve that the Executive Director of Place, after consultation with the Assistant Director of Legal Services and the Chair of the Planning and Development Control Committee be authorised to make any minor changes to the proposed Heads of Terms of the legal agreement or proposed conditions, which may include the variation, addition or deletion of conditions, any such changes shall be within their discretion. Conditions:

1) Time Limit The development hereby permitted shall not commence later than the expiration of 3 years beginning with the date of this planning permission.

Condition required to be imposed by section 91(1)(a) of the Town and Country Planning Act 1990 (as amended by section 51 of the Planning and Compulsory Purchase Act 2004).

2) Approved Plans The development hereby permitted shall be carried out in complete accordance with the following approved drawing numbers and documents, other than where those details are altered pursuant to the conditions of this planning permission:

PLACES_PBA_2026-120-01 Rev R02; PLACES_PBA_2026-120-02 Rev R02; PLACES_PBA_2026-120-03 Rev R02; PLACES_PBA_2026-120-04 Rev R02; PLACES_PBA_2026-120-06 Rev R02; PLACES_PBA_2026-130-05 Rev R02; PLACES_PBA_2026-130-06 Rev R02; PLACES_PBA_2026-210-05 Rev R02; PLACES_PBA_2026-210-06 Rev R02; PLACES_PBA_2026-210-07 Rev R02.

To ensure full compliance with the planning permission hereby approved and to prevent harm arising through deviations from the approved plans, in accordance with Policies DC1, DC4 and DC8 of the Local Plan (2018).

3) Materials No part of the structure above ground level shall be constructed until details and samples of all materials to be used on the external faces of the building, including walls, roof coverings, windows and doors, have been submitted to and approved in writing by the Council. No part of the development shall be used or occupied prior to the completion of the development in accordance with the approved details.

To ensure a satisfactory external appearance and to prevent harm to the visual amenities of surrounding properties, in accordance with Policies DC1, DC4 and DC8 of the Local Plan (2018). 4) Operational Hours No customers shall be on the commercial premises during the hours of 23:00 to 07:30 Mondays to Sundays and Public/Bank Holidays.

- If in Class E(b) - for the sale of food and drink for consumption (mostly) on the premises. No customers shall be on the commercial premises during the hours of 23:00 to 07:30 Mondays to Sundays and Public/Bank Holidays.

- If in Class E(d) no classes shall occur for indoor sport, recreation or fitness between the hours of 21:00 to 07:30. No customers shall be on the commercial premises during the hours of 23:00 to 07:30 Mondays to Sundays and Public/Bank Holidays.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
72: 76 Railway Arches, Ranelagh Gardens, London SW6 3UH, Palace and Hurlingham, 2026/00249/FULReport 525 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

5 of 8 attended
LP
Councillor Lydia PaynterChair, present
VB
Councillor Victoria BrignellVice-Chair, apologies
WH
Councillor Wesley HarcourtCommittee Member, present
CN
Councillor Callum NimmoCommittee Member, apologies
MM
Councillor Molly MantleCommittee Member, apologies
RM
Councillor Ross MeltonCommittee Member, present
LD
Councillor Liam Downer-SandersonCommittee Member, present
AP
Councillor Adrian Pascu-TulbureCommittee Member, present

On this subject at Hammersmith & Fulham

Search all
  1. 72 - 76 Railway Arches, Ranelagh Gardens, London SW6 3UH, Palace and Hurlingham, 2026/00249/FULThis decision
  2. The Hawks Nest, 190 Railway Arches, Shepherd's Bush Market, London W12 8DF (8PM OR AFTER CONSIDERATION OF THE FIRST ITEM)Approved
  3. Railway Arches Supplementary Planning DocumentAgreed
  4. Delina, 176 Railway Arches, Shepherd's Bush Market, London W12 8DF (6:30pm)Agreed
  5. Hawk's Nest, 190 Railway Arches, London, W12 8DFDecided
  6. Hawk's Nest, 190 Railway Arches, London, W12 8DF - (10am)Decided

More from Hammersmith & Fulham Planning and Development Control Committee

All decisions
MeetingDecisionOutcome
15 Sep 2026 Unit 1b, Waterside Tower, The Boulevard, London, SW6 2UB, Sands End, P/2026/01012/FULRESOLVED That the Director of Planning and Property be authorised to grant planning permission subject to the conditi... Decided Open
15 Sep 2026 40 Barclay Road, London, Hammersmith and Fulham, SW6 1EH, Walham Green, P/2026/01137/FULRESOLVED That the Director of Planning and Property be authorised to grant planning permission subject to the conditi... Decided Open
15 Sep 2026 Land North of Westfield London Shopping Centre, Ariel Way, London W12, Shepherd's Bush Green, 2025/03376/VARRESOLVED That subject to there being no contrary direction from the Mayor of London, the Director of Planning and Pro... Agreed Open
15 Sep 2026 Land At Albert Wharf and Swedish Wharf, Wandsworth Bridge Road, London SW6 2TY, Sands End, 2025/02448/VARRESOLVED That subject to there being no contrary direction from the Mayor for London, that the Director of Planning a... Agreed Open
15 Sep 2026 1 - 3 Sussex Place, London, W6 9EA, Hammersmith Broadway, P/2026/00633/FULRESOLVED That subject to there being no contrary direction from the Mayor for London, that the Director of Planning a... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies