CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Hampshire County Council
River Hamble Harbour Board, Friday 15 July 2022 at 10.00am

Harbour Works Consent Application - Retention of existing jetty (retrospective application) and installation of new ecological enhancements at Highfield, SO31 7DF

Approved Committee 6 papers

River Hamble Harbour Board approved this item on Friday 15 July 2022. Below is the council's own wording, with the papers it was decided on.

Item43

Resolved

That the Board approves Harbour Works Consent for the proposal set out in paragraph 4 of the report and subject to the following conditions: a. The proposal is to be built in accordance with the details, plans and method set out in paragraph 4. b. The size, arrangement and specific location of the enhancement features are to be submitted to and approved by the Harbour Master in writing prior to installation. c. The applicant should ensure that all equipment, temporary structures, waste and/or debris associated with the consented activities be removed upon completion of the consented activities.
Word for word from the decision Hampshire published for this meeting. Source: democracy.hants.gov.uk

Follow this further

Built from Hampshire's papers

What the report saysPro

Report to River Hamble Harbour Board

Recommendations

2. That the River Hamble Harbour Board approves Harbour Works Consent for the proposal set out in paragraph 4 of this report and subject to the following conditions: a. The proposal is to be built in accordance with the details, plans and method set out in paragraph 4. b. The size, arrangement and specific location of the enhancement features are to be submitted to and approved by the Harbour Master in writing prior to installation. c. The applicant should ensure that all equipment, temporary structures, waste and/or debris associated with the consented activities be removed upon completion of the consented activities.

Executive summary

3. This report seeks to:

• Set out an application for Harbour Works Consent made by the owner of Highfield, Green Lane, Lower Swanwick, SO31 7D, via his agent Marina Projects Limited, for the retention of an existing jetty structure (retrospective application) and the installation of new ecological enhancements to the existing saltmarsh and intertidal area.

• Consider the impacts of the proposal on safety and ease of navigation and on the environment of the Hamble Estuary, both during construction and once operational.

Project Description

4. The proposal consists of two elements. The first relates to a timber ‘jetty’ structure 14.4 metres long by 2.64 meters wide which has already been built (in autumn 2020) and serves as a small slipway from the owner’s garden into the head of an intertidal creek. The second element relates to a small ecological enhancement scheme comprising coir rolls and low-profile wicker fencing to be placed by hand around the edges of the adjacent saltmarsh in order to reduce erosion and encourage sedimentation and colonisation by saltmarsh plants. The following documents have been provided by the applicant to support this application, and reference must be made to these for a full understanding of the proposal (see Appendix 1 to 7): 1. Project Summary File Note MP276-FN-07 2. Location Plan MP276-00-A-001 3. Jetty Footprint and area of impact MP276-00-A-200 4. Jetty Plan and Section – as built MP276-00-A-300 5. Enhancements – proposed approximate locations MP276-00-A-201 6. Fareham Borough Council HRA Screening Matrix and Appropriate Assessment Statement 7. Fathom Ecology Preliminary Environment Assessment Walkover Survey

Harbour Authority’s Responsibilities

5. Consent may be granted by the River Hamble Harbour Board permitting harbour works in the River Hamble in accordance with Section 10 of the Southampton Harbour Act 1924 and Section 48 of the Southampton Harbour Act 1949 as amended by the River Hamble Harbour Revision Orders 1969 to 1989. Within the River Hamble Harbour Board’s statutory duties lies the responsibility to ensure that all matters concerning navigational safety and responsibilities under the Habitat Regulations are addressed. This area of responsibility includes the proposed development.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Project Summary File NoteAppendix 1 1.4 MB Download
PDF
Location PlanAppendix 2 4 MB Download
PDF
Jetty Footprint and area of impactAppendix 3 3.6 MB Download
PDF
Jetty Plan and Section: as builtAppendix 4 2.4 MB Download
PDF
Enhancements: proposed approximate locationsAppendix 5 3.7 MB Download
PDF
Harbour Works Consent Application: Retention of existing jetty (retrospective application) and installation of new ecological enhancements at Highfield, SO31 7DFReport 150 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

6 of 8 attended
SW
Councillor Seán WoodwardChairman, present
MF
Councillor Michael FordVice-Chairman, present
KH
Councillor Keith HouseCommittee Member, apologies, sent representative
NH
Nikki Hiorns Environmental Management RepresentativeCo-opted Member, apologies
DJ
David Jobson Recreational Sailing RepresentativeCo-opted Member, apologies
CM
Chris Moody Marine Industry RepresentativeCo-opted Member, present
JS
Jason Scott Marine Director (non voting)Co-opted Member, present
TG
Councillor Tim GrovesLiberal Democrats Deputy, present as substitute

On this subject at Hampshire

Search all
  1. Harbour Works Consent Application - Retention of existing jetty (retrospective application) and installation of new ecological enhancements at Highfield, SO31 7DFThis decision
  2. Harbour Works Consent Application - Quay Wall Refurbishment & Pontoon Works at Riverside BoatyardApproved
  3. Harbour Works Consent Application - Quay Wall Refurbishment & Pontoon Works at Riverside BoatyardApproved
  4. Harbour Works Consent Application - Minor rearrangement of walkway pontoon and installation of two finger pontoons at Prince Philip Yacht HavenApproved
  5. Harbour Works Consent Application - Minor rearrangement of walkway pontoon and installation of two finger pontoons at Prince Phillip Yacht HavenApproved
  6. Harbour Works Consent Application - Retention of existing jetty (retrospective application) and installation of new ecological enhancements at Highfield, SO31 7DFApproved

More from Hampshire River Hamble Harbour Board

All decisions
MeetingDecisionOutcome
26 Jun 2026 Marine Director and Harbour Master's Report and Current IssuesRESOLVED That the River Hamble Harbour Board supported the contents of this report. Decided Open
26 Jun 2026 Environmental UpdateRESOLVED That the River Hamble Harbour Board noted and supported the contents of this report. Noted Open
26 Jun 2026 River Hamble Final Accounts 2025/26 and Forecast Outturn 2026/27RESOLVED · That this report, the statutory accounts and management accounts for 2025/26 be approved by the River Hamb... Approved Open
26 Jun 2026 Review of Harbour DuesRESOLVED That the River Hamble Harbour Board approves an increase in Harbour Dues of 5% for the 2027 calendar year. Approved Open
26 Jun 2026 Forward Plan of Future MeetingsRESOLVED That the River Hamble Harbour Board noted the contents of this report. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies