Harbour Works Consent Application - Retention of existing jetty (retrospective application) and installation of new ecological enhancements at Highfield, SO31 7DF
ApprovedCommittee6 papers
River Hamble Harbour Board approved this item on Friday 15 July 2022. Below is the council's own wording, with the papers it was decided on.
That the Board approves Harbour Works Consent for the proposal set out in paragraph 4 of the report and subject to the following conditions: a. The proposal is to be built in accordance with the details, plans and method set out in paragraph 4. b. The size, arrangement and specific location of the enhancement features are to be submitted to and approved by the Harbour Master in writing prior to installation. c. The applicant should ensure that all equipment, temporary structures, waste and/or debris associated with the consented activities be removed upon completion of the consented activities.
Word for word from the decision Hampshire published for this meeting.Source: democracy.hants.gov.uk
2. That the River Hamble Harbour Board approves Harbour Works Consent for the proposal set out in paragraph 4 of this report and subject to the following conditions: a. The proposal is to be built in accordance with the details, plans and method set out in paragraph 4. b. The size, arrangement and specific location of the enhancement features are to be submitted to and approved by the Harbour Master in writing prior to installation. c. The applicant should ensure that all equipment, temporary structures, waste and/or debris associated with the consented activities be removed upon completion of the consented activities.
Executive summary
3. This report seeks to:
• Set out an application for Harbour Works Consent made by the owner of Highfield, Green Lane, Lower Swanwick, SO31 7D, via his agent Marina Projects Limited, for the retention of an existing jetty structure (retrospective application) and the installation of new ecological enhancements to the existing saltmarsh and intertidal area.
• Consider the impacts of the proposal on safety and ease of navigation and on the environment of the Hamble Estuary, both during construction and once operational.
Project Description
4. The proposal consists of two elements. The first relates to a timber ‘jetty’ structure 14.4 metres long by 2.64 meters wide which has already been built (in autumn 2020) and serves as a small slipway from the owner’s garden into the head of an intertidal creek. The second element relates to a small ecological enhancement scheme comprising coir rolls and low-profile wicker fencing to be placed by hand around the edges of the adjacent saltmarsh in order to reduce erosion and encourage sedimentation and colonisation by saltmarsh plants. The following documents have been provided by the applicant to support this application, and reference must be made to these for a full understanding of the proposal (see Appendix 1 to 7): 1. Project Summary File Note MP276-FN-07 2. Location Plan MP276-00-A-001 3. Jetty Footprint and area of impact MP276-00-A-200 4. Jetty Plan and Section – as built MP276-00-A-300 5. Enhancements – proposed approximate locations MP276-00-A-201 6. Fareham Borough Council HRA Screening Matrix and Appropriate Assessment Statement 7. Fathom Ecology Preliminary Environment Assessment Walkover Survey
Harbour Authority’s Responsibilities
5. Consent may be granted by the River Hamble Harbour Board permitting harbour works in the River Hamble in accordance with Section 10 of the Southampton Harbour Act 1924 and Section 48 of the Southampton Harbour Act 1949 as amended by the River Hamble Harbour Revision Orders 1969 to 1989. Within the River Hamble Harbour Board’s statutory duties lies the responsibility to ensure that all matters concerning navigational safety and responsibilities under the Habitat Regulations are addressed. This area of responsibility includes the proposed development.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Harbour Works Consent Application: Retention of existing jetty (retrospective application) and installation of new ecological enhancements at Highfield, SO31 7DFReport
43Harbour Works Consent Application - Retention of existing jetty (retrospective application) and installation of new ecological enhancements at Highfield, SO31 7DFThis decision
Harbour Works Consent Application - Retention of existing jetty (retrospective application) and installation of new ecological enhancements at Highfield, SO31 7DFThis decision
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.