CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Hampshire County Council
River Hamble Harbour Board, Friday 6 October 2023 at 10.00am

Harbour Works Consent Application - Quay Wall Refurbishment & Pontoon Works at Riverside Boatyard

Approved Committee 5 papers

River Hamble Harbour Board approved this item on Friday 6 October 2023. Below is the council's own wording, with the papers it was decided on.

Item98

Resolved

RESOLVED The River Hamble Harbour Board approved Harbour Works Consent for the proposal set out in paragraph 4 of the report and subject to the following conditions: a. The proposal is to be built in accordance with the details, plans and method set out in paragraph 4. b. The applicant should ensure that only coatings and treatments that are suitable for use in the marine environment are used in accordance with best environmental practice. All reasonable precautions will be undertaken to ensure no pollutants enter the waterbody. c. The applicant should ensure that all equipment, temporary structures, waste and/or debris associated with the licensed activities is/are removed upon completion of the licensed activities. d. Necessary measurements of the new facilities to be made to calculate the new annual rate of Harbour Dues payable by the boatyard. e. The development must be completed within 3 years from the date of the approval granted by the Harbour Board
Word for word from the decision Hampshire published for this meeting. Source: democracy.hants.gov.uk

Follow this further

Built from Hampshire's papers

What the report saysPro

Report to River Hamble Harbour Board

Recommendations

2. That the River Hamble Harbour Board approves Harbour Works Consent for the proposal set out in paragraph 4 of this report and subject to the following conditions: a. The proposal is to be built in accordance with the details, plans and method set out in paragraph 4. b. The applicant should ensure that only coatings and treatments that are suitable for use in the marine environment are used in accordance with best environmental practice. All reasonable precautions will be undertaken to ensure no pollutants enter the waterbody. c. The applicant should ensure that all equipment, temporary structures, waste and/or debris associated with the licensed activities is/are removed upon completion of the licensed activities. d. Necessary measurements of the new facilities to be made to calculate the new annual rate of Harbour Dues payable by the boatyard. e. The development must be completed within 3 years from the date of the approval granted by the Harbour Board. Executive Summary

3. This report seeks to:

• Set out an application for Harbour Works Consent made by Foulkes & Son (via its agent Lymington Technical Services) for development at Riverside Boatyard, Blundell Lane, Bursledon, Southampton SO31 1AA.

• Consider the impacts of the proposal on safety and ease of navigation and on the environment of the Hamble Estuary, both during construction and once operational.

Project Description

4. The proposal is for: i. the refurbishment of the existing quay wall, ii. the installation of a pontoon on the existing concrete slipway, iii. two small extensions to existing pontoons (no piling or dredging).

The following documents have been provided by the applicant to support this application, and reference must be made to these for a full understanding of the proposal (see Appendices 1a to 1d): • Supporting information document (10948 Rpt3C revised June 2023) • Drawing 10948/2D Location and Quay wall elevation • Drawing 10948/3C Pontoon Works • Information for Habitats Regulations Assessment (10948 Rpt 4C Revised June 2023)

Harbour Authority’s Responsibilities

5. Consent may be granted by the River Hamble Harbour Board permitting harbour works in the River Hamble in accordance with Section 10 of the Southampton Harbour Act 1924 and Section 48 of the Southampton Harbour Act 1949 as amended by the River Hamble Harbour Revision Orders 1969 to 1989. Within the River Hamble Harbour Board’s statutory duties lies the responsibility to ensure that all matters concerning navigational safety and responsibilities under the Habitat Regulations are addressed. This area of responsibility includes the proposed development.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
. Supporting InformationAppendix 1a 1.4 MB Download
PDF
. Drawing 10948.2D. Location and Quay wall elevationAppendix 1b 172 KB Download
PDF
. Drawing 10948.3C Pontoon WorksAppendix 1c 120 KB Download
PDF
. Information for Habitats Regulations Assessment 10948 Rpt 4CAppendix 1d 1.6 MB Download
PDF
Harbour Works Consent Application: Quay Wall Refurbishment & Pontoon Works at Riverside BoatyardReport 142 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

6 of 7 attended
SW
Councillor Seán WoodwardChairman, present
MF
Councillor Michael FordVice-Chairman, present
KH
Councillor Keith HouseCommittee Member, present
NH
Nikki Hiorns Environmental Management RepresentativeCo-opted Member, apologies
DJ
David Jobson Recreational Sailing RepresentativeCo-opted Member, present
JS
Jason Scott Marine Director (non voting)Co-opted Member, present
NW
Nicola WalshCo-opted Member, present

On this subject at Hampshire

Search all
  1. Harbour Works Consent Application - Quay Wall Refurbishment & Pontoon Works at Riverside BoatyardThis decision
  2. Harbour Works Consent Application - Quay Wall Refurbishment & Pontoon Works at Riverside BoatyardApproved
  3. Harbour Works Consent Application - Minor rearrangement of walkway pontoon and installation of two finger pontoons at Prince Philip Yacht HavenApproved
  4. Harbour Works Consent Application - Minor rearrangement of walkway pontoon and installation of two finger pontoons at Prince Phillip Yacht HavenApproved
  5. Harbour Works Consent Application - Retention of existing jetty (retrospective application) and installation of new ecological enhancements at Highfield, SO31 7DFApproved
  6. Harbour Works Consent Application - Retention of existing jetty (retrospective application) and installation of new ecological enhancements at Highfield, SO31 7DFApproved

More from Hampshire River Hamble Harbour Board

All decisions
MeetingDecisionOutcome
26 Jun 2026 Marine Director and Harbour Master's Report and Current IssuesRESOLVED That the River Hamble Harbour Board supported the contents of this report. Decided Open
26 Jun 2026 Environmental UpdateRESOLVED That the River Hamble Harbour Board noted and supported the contents of this report. Noted Open
26 Jun 2026 River Hamble Final Accounts 2025/26 and Forecast Outturn 2026/27RESOLVED · That this report, the statutory accounts and management accounts for 2025/26 be approved by the River Hamb... Approved Open
26 Jun 2026 Review of Harbour DuesRESOLVED That the River Hamble Harbour Board approves an increase in Harbour Dues of 5% for the 2027 calendar year. Approved Open
26 Jun 2026 Forward Plan of Future MeetingsRESOLVED That the River Hamble Harbour Board noted the contents of this report. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies