Mar25Tuesday

Cabinet Procurement Committee

HaringeyHeldPapers from www.minutes.haringey.gov.uk
Tuesday 25 March 2008, 6.30pmHeld 6815 days ago.
Civic CentreHigh Road, Wood Green, N22 8LE. Open to the public.
14 items, 11 papersAbout 3.9 MB, led by Bruce Grove, Townscape Heritage Initiative, Phase 2.
No exempt items listedEvery item is due to be heard in public.
This meeting was held25 March 2008
14items
11papers
10decisions
–exempt
Running order, sized by papersItem 59 to 72
ReportsProcedureExempt parts

The agenda, item by item

What the committee will consider, in order, with every paper attached to its item.

59
Procedure

Apologies for Absence

(if any)

60
Procedure

Urgent Business

The Chair will consider the admission of any late items of urgent business. Late items will be considered under the agenda item where they appear. New items will be dealt with at item 15 below. New items of exempt business will be dealt with at item 26 below.

61
Procedure

Declarations of Interest

A member with a personal interest in a matter who attends a meeting of the authority at which the matter is considered must disclose to that meeting the existence and nature of that interest at the commencement of that consideration, or when the interest becomes apparent. A member with a personal interest in a matter also has a prejudicial interest in that matter if the interest is one which a member of the public...

62
Report

Minutes

To confirm and sign the minutes of the meetings of the Procurement Committee held on 19 and 26 February 2008.

Decision: That the minutes of the following meetings be agreed and signed: - 19 February 2008 - 26 February 2008 Decision page

2 papers, 112 KBSearch inside with Pro
Report2008.03.25_Item 04_Minutes (26-2)62 KBDownload
ReportMinutes50 KBDownload
63
Procedure

Deputations / Petitions / Presentations / Questions

To consider any requests received in accordance with Standing Orders.

64
Report

Bruce Grove, Townscape Heritage Initiative, Phase 2

(Report of the Director of Urban Environment): To recommend the award of a contract for the second phase of the Heritage Lottery Fund Townscape Heritage in Bruce Grove (Nos. 527, 541, 543, 551 and 553 Tottenham High Road.

Decision: That approval be given to award the contract for the Bruce Grove Townscape Heritage Initiative, Phase 2 (Part A) project, as allowed under Contract Standing Orders (CSO) 11, in accordance with the recommendations in paragraph 18 of this report. 2. That the contract be awarded for a period of 18 weeks. Decision page

1 paper, 2.6 MBSearch inside with Pro
ReportBruce Grove, Townscape Heritage Initiative, Phase 22.6 MBDownload
65
Report

Renewal of the Purdey Gas Maintenance Contract for the Operational Building Portfolio

(Report of the Director of Corporate Resources): To seek approval to the renewal of the Purdey gas equipment maintenance contract for a period of twelve months.

Decision: That approval be granted for a 12 months extension to the Purdy Contracts Ltd gas equipment maintenance contract (“the Purdy contract”) in respect of the Council’s operational buildings from 1 st April 2008. Decision page

1 paper, 124 KBSearch inside with Pro
ReportRenewal of the Purdey Gas Maintenance Contract for the Operational Building Portfolio124 KBDownload
66
Report

North Tottenham Decent Homes Works Phase NT1

(Report of the Director of Urban Environment): To seek approval to the award of the contract for the Decent Homes Programme for the Roundway and Waltheof Gardens N.17.

Decision: That the contract for the North Tottenham Decent Homes Works Phase NT1 contract be awarded to Lovell Partnership Ltd , as allowed under Contract Standing Order (CSO) 11.03. 2. That the total Agreed Maximum Price excluding fees as detailed in Para 2.1 of Appendix A be noted. Decision page

1 paper, 146 KBSearch inside with Pro
ReportNorth Tottenham Decent Homes Works Phase NT1146 KBDownload
67
Report

North Tottenham Decent Homes Works Phase NT2

(Report of the Director of Urban Environment): To seek approval to the award of the Decent Homes Programme contracts for White Hart Lane and Durban Road N17.

Decision: That the contract for the North Tottenham Decent Homes Works Phase NT2 contract be awarded to Lovell Partnership Ltd, as allowed under Contract Standing Order (CSO) 11.03. 2. That the total Agreed Maximum Price exclusing fees as detailed in Para 2.1 of Appendix A be noted. Decision page

1 paper, 146 KBSearch inside with Pro
ReportNorth Tottenham Decent Homes Works Phase NT2146 KBDownload
68
Report

North Tottenham Decent Homes Works Phase NT3

(Report of the Director of Urban Environment): To seek approval to the award of the Decent Homes Programme contract for Risley Avenue N17.

Decision: That the contract for the North Tottenham Decent Homes Works Phase NT3 contract be awarded to Lovell Partnership Ltd as allowed under Contract Standing Order (CSO) 11.03. 2. That the total Agreed Maximum Price exclusing fees as detailed in Para 2.1 of Appendix A be noted. Decision page

1 paper, 146 KBSearch inside with Pro
ReportNorth Tottenham Decent Homes Works Phase NT3146 KBDownload
69
Report

North Tottenham Decent Homes Works Phase NT4

(Report of the Director of Urban Environment): To seek approval to the award of the Decent Homes Programme contracts for Tilson Road, Spencer Road, Wycombe Road and Glendish Road N17.

Decision: That the contract for the North Tottenham Decent Homes Works Phase NT4 contract be awarded to Lovell Partnership Ltd, as allowed under Contract Standing Order (CSO) 11.03. 2. That the total Agreed Maximum Price exclusing fees as detailed in Para 2.1 of Appendix A be noted. Decision page

1 paper, 147 KBSearch inside with Pro
ReportNorth Tottenham Decent Homes Works Phase NT4147 KBDownload
70
Report

South Tottenham Decent Homes Works Phase ST1

(Report of the Director of Urban Environment): To seek approval to the award of the contract for Decent Homes Programme contract for Spondon Road, Montague Road, Tenby Road and Stainby Road N15.

Decision: That the contract for the South Tottenham Decent Homes Works Phase ST1 contract be awarded to Apollo Group Ltd as allowed under Contract Standing Order (CSO) 11.03. 2. That the total Agreed Maximum Price exclusing fees as detailed in Para 2.1 of Appendix A be noted. Decision page

1 paper, 147 KBSearch inside with Pro
ReportSouth Tottenham Decent Homes Works Phase ST1147 KBDownload
71
Report

Consultants for Construction Work Framework Agreement - Award of Contract

(Joint Report of the Director of Corporate Resources and the Chief Financial Officer): To seek agreement to enter into a Framework Agreement for the provision of construction related consultancy services with a single lead supplier.

Decision: That approval be given to the proposal to enter into a Framework Agreement for the provision of construction-related consultancy services with the single lead supplier NPS Property Consultants Ltd as allowed under Contract Standing Order (CSO) 11.03, for a period of two years with the option to extend the framework agreement for a further two years on an annuakl basis subject to satisfactory performance of the company. Decision page

1 paper, 178 KBSearch inside with Pro
ReportConsultants for Construction Work Framework Agreement: Award of Contract178 KBDownload
72
Report

Consultants for Construction Works Framework Agreement (Additional Services) - Award of Contract

(Joint Report of the Director of Corporate Resources and the Chief Financial Officer): To seek agreement to enter into a Consultants for Construction Works (Additional Services) Framework Agreement with identified companies.

Decision: That approval be given to the proposal to enter into a Consultants for Construction Works (Additional Services) Framework Agreement with: Ø John Burke Associates for provision of clerk of works services Ø Gardiner &Theobald LLP for provision of CDM co-ordinator services Ø Frankham Consultancy Group, Erinaceous Group, Keegans Ltd, Potter Raper partnership LLP for provision of quantity surveying as allowed under Contract Standing Order (CSO) 11.03, for a period of two years with the option to... Decision page

1 paper, 150 KBSearch inside with Pro
ReportConsultants for Construction Works Framework Agreement (Additional Services): Award of Contract150 KBDownload
Read inside all 11 papersPro opens every page, searches every appendix, and keeps the papers if the council removes them.

Every paper for this meeting

All 11 papers in one list, with the item each belongs to, its size, and our copy of it. Download any paper from our archive once signed in; read and search it here with Pro.

PaperSizeOur copy
2008.03.25_Item 04_Minutes (26-2)Item 62, Minutes
62 KB
Kept 2 Oct
MinutesItem 62, Minutes
50 KB
Kept 2 Oct
Bruce Grove, Townscape Heritage Initiative, Phase 2Item 64, Bruce Grove, Townscape Heritage Initiative, Phase 2
2.6 MB
Kept 2 Oct
Renewal of the Purdey Gas Maintenance Contract for the Operational Building PortfolioItem 65, Renewal of the Purdey Gas Maintenance Contract for the Operational Building Portfolio
124 KB
Kept 2 Oct
North Tottenham Decent Homes Works Phase NT1Item 66, North Tottenham Decent Homes Works Phase NT1
146 KB
Kept 2 Oct
North Tottenham Decent Homes Works Phase NT2Item 67, North Tottenham Decent Homes Works Phase NT2
146 KB
Kept 2 Oct
North Tottenham Decent Homes Works Phase NT3Item 68, North Tottenham Decent Homes Works Phase NT3
146 KB
Kept 2 Oct
North Tottenham Decent Homes Works Phase NT4Item 69, North Tottenham Decent Homes Works Phase NT4
147 KB
Kept 2 Oct
South Tottenham Decent Homes Works Phase ST1Item 70, South Tottenham Decent Homes Works Phase ST1
147 KB
Kept 2 Oct
Consultants for Construction Work Framework Agreement: Award of ContractItem 71, Consultants for Construction Work Framework Agreement - Award of Contract
178 KB
Kept 2 Oct
Consultants for Construction Works Framework Agreement (Additional Services): Award of ContractItem 72, Consultants for Construction Works Framework Agreement (Additional Services) - Award of Contract
150 KB
Kept 2 Oct

Last time, and what carried over

The committee last met on 26 February 2008. 1 of its items lead into this meeting; 8 items are new. Point at any item to follow a thread. Procedural items are left out.

Feb26
26 February 20089 items, 9 papers
Held
carried over
Mar25
25 March 200814 items, 11 papers
Held
51
MinutesTo confirm and sign the minutes of the meeting of the Procurement...
52
Recreation Approved Suppliers Framework Contract(Report of the Director of Adult Culture and Community Services): To...
53
Bounds Green Children Centre and Federated School Works(Report of the Director of the Children and Young People’s Service)...
54
Addition to and Remodelling and Refurbishment of the Existing Sports Hall at Gladesmore Community School(Report of the Director of the Children and Young People’s...
55
Coleridge Primary Expansion Phase 2 - Variation of Contract(Report of the Director of the Children and Young People’s Service)...
56
Extension of Network Security and Datacentre Services (Logicalis)(Report of the Director of Corporate Resources): To seek an extension...
57
Purchase of Insurance Policies from External Providers(Report of the Chief Financial Officer): To inform Members of the...
58
Sustainable Procurement(Report of the Director of Corporate Resources): To outline the...
62
MinutesNew this time
64
Bruce Grove, Townscape Heritage Initiative, Phase 2New this time
65
Renewal of the Purdey Gas Maintenance Contract for the Operational Building PortfolioNew this time
66
North Tottenham Decent Homes Works Phase NT1New this time
67
North Tottenham Decent Homes Works Phase NT2New this time
68
North Tottenham Decent Homes Works Phase NT3New this time
69
North Tottenham Decent Homes Works Phase NT4New this time
70
South Tottenham Decent Homes Works Phase ST1New this time
71
Consultants for Construction Work Framework Agreement - Award of Contract(Joint Report of the Director of Corporate Resources and the Chief...
72
Consultants for Construction Works Framework Agreement (Additional Services) - Award of Contract(Joint Report of the Director of Corporate Resources and the Chief...

The threads

  • Recreation Approved Suppliers Framework Contract leads to item 71, Consultants for Construction Work Framework Agreement - Award of Contract
  • Recreation Approved Suppliers Framework Contract leads to item 72, Consultants for Construction Works Framework Agreement (Additional Services) - Award of Contract

Not carried over

Bounds Green Children Centre and Federated School Works, Addition to and Remodelling and Refurbishment of the Existing Sports Hall at Gladesmore Community School, Coleridge Primary Expansion Phase 2 - Variation of Contract, Extension of Network Security and Datacentre Services (Logicalis) and 2 more do not return this time.

See the 26 February meeting

This committee over time

Every Cabinet Procurement Committee meeting we have read, the dates it has set for the future, and each time those dates have changed.

125 meetings, 2002 to 2012Dot size shows the number of papers
200220042006200820102012
HeldThis meeting
MeetingItemsPapers
12 Apr 2012Thursday
7items
6papers
HeldOpen
23 Feb 2012Thursday
3items
2papers
HeldOpen
12 Jan 2012Thursday
8items
6papers
HeldOpen
17 Nov 2011Thursday
7items
5papers
HeldOpen
6 Oct 2011Thursday
7items
2papers
HeldOpen
28 Jul 2011Thursday
9items
9papers
HeldOpen
30 Jun 2011Thursday
5items
4papers
HeldOpen
16 Jun 2011Thursday
0items
0papers
HeldOpen
12 May 2011Thursday
4items
2papers
HeldOpen
5 May 2011Thursday
0items
0papers
HeldOpen
24 Mar 2011Thursday
6items
5papers
HeldOpen
24 Feb 2011Thursday
4items
3papers
HeldOpen
3 Feb 2011Thursday
4items
4papers
HeldOpen
16 Dec 2010Thursday
5items
3papers
HeldOpen
25 Nov 2010Thursday
5items
2papers
HeldOpen
21 Oct 2010Thursday
7items
0papers
HeldOpen
16 Sep 2010Thursday
15items
12papers
HeldOpen
22 Jul 2010Thursday
15items
16papers
HeldOpen
6 Jul 2010Tuesday
10items
0papers
HeldOpen
22 Jun 2010Tuesday
5items
0papers
HeldOpen
21 Jun 2010Monday
4items
3papers
HeldOpen
27 Apr 2010Tuesday
19items
17papers
HeldOpen
30 Mar 2010Tuesday
13items
11papers
HeldOpen
16 Feb 2010Tuesday
14items
10papers
HeldOpen
12 Jan 2010Tuesday
4items
4papers
HeldOpen
22 Dec 2009Tuesday
6items
5papers
HeldOpen
24 Nov 2009Tuesday
5items
4papers
HeldOpen
27 Oct 2009Tuesday
12items
12papers
HeldOpen
2 Oct 2009Friday
4items
2papers
HeldOpen
1 Oct 2009Thursday
0items
0papers
HeldOpen
15 Sep 2009Tuesday
10items
9papers
HeldOpen
28 Jul 2009Tuesday
10items
8papers
HeldOpen
7 Jul 2009Tuesday
10items
11papers
HeldOpen
11 Jun 2009Thursday
4items
3papers
HeldOpen
14 May 2009Thursday
3items
2papers
HeldOpen
28 Apr 2009Tuesday
12items
12papers
HeldOpen
31 Mar 2009Tuesday
9items
8papers
HeldOpen
19 Mar 2009Thursday
4items
4papers
HeldOpen
3 Mar 2009Tuesday
4items
3papers
HeldOpen
19 Feb 2009Thursday
4items
4papers
HeldOpen
16 Feb 2009Monday
0items
0papers
HeldOpen
3 Feb 2009Tuesday
4items
5papers
HeldOpen
19 Jan 2009Monday
2items
2papers
HeldOpen
18 Dec 2008Thursday
7items
4papers
HeldOpen
25 Nov 2008Tuesday
14items
14papers
HeldOpen
13 Nov 2008Thursday
0items
0papers
HeldOpen
28 Oct 2008Tuesday
12items
12papers
HeldOpen
16 Oct 2008Thursday
6items
6papers
HeldOpen
30 Sep 2008Tuesday
11items
10papers
HeldOpen
2 Sep 2008Tuesday
12items
12papers
HeldOpen
29 Jul 2008Tuesday
11items
8papers
HeldOpen
17 Jul 2008Thursday
1items
1papers
HeldOpen
24 Jun 2008Tuesday
10items
15papers
HeldOpen
12 Jun 2008Thursday
4items
3papers
HeldOpen
15 May 2008Thursday
7items
6papers
HeldOpen
29 Apr 2008Tuesday
6items
6papers
HeldOpen
25 Mar 2008Tuesday, this meeting
14items
11papers
26 Feb 2008Tuesday
9items
9papers
HeldOpen
19 Feb 2008Tuesday
2items
2papers
HeldOpen
29 Jan 2008Tuesday
5items
8papers
HeldOpen
20 Dec 2007Thursday
2items
0papers
HeldOpen
27 Nov 2007Tuesday
7items
10papers
HeldOpen
20 Nov 2007Tuesday
1items
0papers
HeldOpen
23 Oct 2007Tuesday
7items
0papers
HeldOpen
4 Sep 2007Tuesday
8items
9papers
HeldOpen
24 Jul 2007Tuesday
5items
9papers
HeldOpen
27 Jun 2007Wednesday
12items
0papers
HeldOpen
17 May 2007Thursday
4items
0papers
HeldOpen
17 Apr 2007Tuesday
9items
0papers
HeldOpen
13 Mar 2007Tuesday
8items
7papers
HeldOpen
13 Feb 2007Tuesday
16items
15papers
HeldOpen
7 Dec 2006Thursday
4items
0papers
HeldOpen
14 Nov 2006Tuesday
9items
0papers
HeldOpen
25 Jul 2006Tuesday
1items
0papers
HeldOpen
18 Jul 2006Tuesday
4items
3papers
HeldOpen
26 Jun 2006Monday
11items
9papers
HeldOpen
21 Mar 2006Tuesday
8items
9papers
HeldOpen
28 Feb 2006Tuesday
10items
9papers
HeldOpen
2 Feb 2006Thursday
2items
1papers
HeldOpen
31 Jan 2006Tuesday
10items
5papers
HeldOpen
3 Jan 2006Tuesday
8items
6papers
HeldOpen
20 Dec 2005Tuesday
2items
1papers
HeldOpen
6 Dec 2005Tuesday
11items
9papers
HeldOpen
29 Nov 2005Tuesday
0items
0papers
HeldOpen
25 Oct 2005Tuesday
0items
0papers
HeldOpen
11 Oct 2005Tuesday
0items
0papers
HeldOpen
20 Sep 2005Tuesday
0items
0papers
HeldOpen
26 Jul 2005Tuesday
0items
0papers
HeldOpen
12 Jul 2005Tuesday
0items
0papers
HeldOpen
21 Jun 2005Tuesday
0items
0papers
HeldOpen
2 Jun 2005Thursday
0items
0papers
HeldOpen
17 May 2005Tuesday
0items
0papers
HeldOpen
26 Apr 2005Tuesday
0items
0papers
HeldOpen
5 Apr 2005Tuesday
0items
0papers
HeldOpen
1 Mar 2005Tuesday
0items
0papers
HeldOpen
1 Feb 2005Tuesday
0items
0papers
HeldOpen
4 Jan 2005Tuesday
0items
0papers
HeldOpen
30 Nov 2004Tuesday
0items
0papers
HeldOpen
26 Oct 2004Tuesday
0items
0papers
HeldOpen
21 Sep 2004Tuesday
0items
0papers
HeldOpen
24 Aug 2004Tuesday
0items
0papers
HeldOpen
13 Jul 2004Tuesday
0items
0papers
HeldOpen
22 Jun 2004Tuesday
0items
0papers
HeldOpen
17 May 2004Monday
0items
0papers
HeldOpen
22 Apr 2004Thursday
0items
0papers
HeldOpen
23 Mar 2004Tuesday
0items
0papers
HeldOpen
24 Feb 2004Tuesday
0items
0papers
HeldOpen
15 Jan 2004Thursday
0items
0papers
HeldOpen
18 Dec 2003Thursday
0items
0papers
HeldOpen
25 Nov 2003Tuesday
0items
0papers
HeldOpen
3 Nov 2003Monday
0items
0papers
HeldOpen
23 Sep 2003Tuesday
0items
0papers
HeldOpen
15 Jul 2003Tuesday
0items
0papers
HeldOpen
17 Jun 2003Tuesday
0items
0papers
HeldOpen
13 May 2003Tuesday
0items
0papers
HeldOpen
15 Apr 2003Tuesday
0items
0papers
HeldOpen
18 Mar 2003Tuesday
0items
0papers
HeldOpen
18 Feb 2003Tuesday
0items
0papers
HeldOpen
21 Jan 2003Tuesday
0items
0papers
HeldOpen
10 Dec 2002Tuesday
0items
0papers
HeldOpen
12 Nov 2002Tuesday
0items
0papers
HeldOpen
15 Oct 2002Tuesday
0items
0papers
HeldOpen
10 Sep 2002Tuesday
0items
0papers
HeldOpen
23 Jul 2002Tuesday
0items
0papers
HeldOpen
25 Jun 2002Tuesday
0items
0papers
HeldOpen

Follow the Cabinet Procurement Committee

Choose what you want to hear about. The preview is built from this committee's real papers and changes, so you can see what would have reached you.

What should we tell you?

Haringey, Cabinet Procurement Committee

Cabinet Procurement Committee: 3 kinds of updateHaringey, sent the same day
PDF
11 papers published for 25 MarchBruce Grove, Townscape Heritage Initiative, Phase 2 and 10 more papers
DAT
Meeting dates updatedAny date added, moved or dropped
DEC
Decisions from 25 MarchThe committee's resolutions, the day they are recorded
ABC
"bruce" found in 1 paperBruce Grove, Townscape Heritage Initiative, Phase 2
Each update links to the paper and the council's own copy
Free: one weekly alert. Pro: every option, the same day. Pro Plus: straight into your own systems.

Free

One alert, sent weekly, on titles and decisions.

£0for good
  • 1 alert, weekly summary
  • Titles and decisions
  • Link to every official paper
Save this alert free
Most chosen

Pro

Unlimited alerts the same day, searching every page.

£99per user a month
  • Unlimited alerts, same day
  • Matches inside every page and appendix
  • Every council, not just this one

Pro Plus

Your team, with every match pushed into your own tools.

£449a month, 3 users included
  • Everything in Pro, for 3 users
  • Alerts as webhooks into Slack or a CRM
  • API key and bulk export of this council

Data licence

Every council's records in your own products and research.

£12,000a year, from
  • Unlimited API and full archive delivery
  • Rights to use the data in your products
  • Back to 2000, every council
Talk to us

Never miss what this committee decides

Papers, decisions and date changes for the Cabinet Procurement Committee, and every other committee you follow, the day they appear.

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies