It was agreed that a condition could be imposed to appropriately limit the hours of use of the service yard. · Opportunities to improve the appearance of the boundary fence to Wilson’s Avenue and the visual impact of the service yard were queried. It was agreed that a condition could be added requiring details of boundary treatment to be submitted to the Council for approval. · Clarification was requested on the refuse storage arrangements for the development and it was agreed that this could be added as a condition. · Members requested that the Committee be provided with the opportunity to view the materials proposed for the development once available. Two local residents, [name removed] and [name removed], addressed the Committee in objection to the application and raised the following issues in their presentations and responses to questions from the Committee: · The importance of replacing the landmark Post Office building originally on the site with one of high design merit. · The design and massing of the proposed building was not appropriate and would have the effect of narrowing the surrounding area. · Concerns remained despite the revisions made to the initial application, that the mix of flats proposed was unsuitable in terms of too few family units being provided and that the development ... view the full minutes text for item 34.
Word for word from the decision Haringey published for this meeting.Source: www.minutes.haringey.gov.uk
Proposal: Erection of 4 storey building comprising 3 commercial units at ground floor level and 16 residential units over first, second and third floor levels
Existing Use: Vacant (former Post Office and retail)
Proposed Use: Retail/Commercial and Residential
Applicant: [name removed]: Private
DOCUMENTS Title Design and Access Statement Air Quality Statement Archaeological Desktop Report BREEAM Preliminary Assessment Daylight, Sunlight and Rights of Light Statement Energy Assessment Planning Stage Heritage / Conservation Area Statement Environmental Noise Impact Assessment Site Condition Investigation Transport Statement
PLANS Plan Number Rev. Plan Title LP(0)001 Site Location Plan L(0)001 04 Ground Floor Plan L(0)002 A First floor plan L(0)003 A Second Floor Plan L(0)004 A Third Floor Plan L(0)005 Roof Plan L(0)010 04 Section AA & BB L(0)011 04 Section CC & DD L(0)020 05 Elevations 01 & 02 L(0)021 05 Elevations 03 & 04 OFFREPC Officers Report For Sub Committee C(0)002 A First floor front elevation windows L(6)003 Indicative drainage strategy Case Officer Contact: Jeffery Holt P: 0208 489 5131 E: [email protected] PLANNING DESIGNATIONS: § Conservation Area
RECOMMENDATION GRANT PERMISSION subject to conditions and the completion of a s106 legal agreement SUMMARY OF REPORT
The application proposes a 4-storey mixed use building with retail on the ground floor and residential above to replace a terrace of mixed use Georgian buildings which were damaged in the 2011 riots and later demolished.
The proposal is a revised version of a previous scheme which was refused on three grounds: poor design and harm to the conservation area, inappropriate dwelling mix, and substandard residential accommodation. The principle of the development, impact on amenity and local traffic conditions were all considered acceptable.
The previous scheme has been redesigned and the current proposal has received support from Haringey Design and Conservation Officers and the Haringey Design Panel. The height and massing of the development is appropriate to the town centre and its elevations are led by the features of surrounding development. The development is considered to preserve the character of the conservation area. The dwelling mix has been revised to include larger family units and the aspect and amenity spaces have been designed to provide better living conditions.
Officers are satisfied that the three reasons for refusal have been overcome.
Due to financial viability issues, no affordable housing or substantial s106 contributions are sought however the mix of local housing and the need for redevelopment of this riot damaged site are considered to be mitigating circumstances.
The Council has consulted widely and responses were taken into account by officers.
The proposal is considered to be in accordance with National Guidance and London and Local Policy and planning permission should therefore be granted subject to conditions and a section 106 agreement.
OFFREPC Officers Report For Sub Committee TABLE OF CONTENTS
1.0SITE PLAN 2.0 IMAGES 3.0 SITE AND SURROUNDIINGS 4.0 PLANNING HISTORY 5.0 PROPOSAL DESCRIPTION 6.0 RELEVANT PLANNING POLICY 7.0 CONSULTATION 8.0 ANALYSIS / ASSESSMENT OF APPLICATION 9.0 SUMMARY AND CONCLUSION 10.0 RECOMMENDATION 11.0 APPENDICES: Appendix 1: Consultation Responses Appendix 2: DM Forum Minutes
OFFREPC Officers Report For Sub Committee 1.0 SITE PLAN
OFFREPC Officers Report For Sub Committee 2.0 IMAGES
View north along High Road
View South along High Road OFFREPC Officers Report For Sub Committee Ground Floor Plan
OFFREPC Officers Report For Sub Committee First Floor Plan
OFFREPC Officers Report For Sub Committee Second Floor Plan
OFFREPC Officers Report For Sub Committee Third Floor Plan
OFFREPC Officers Report For Sub Committee 3.0 SITE AND SURROUNDINGS
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.