CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
London Borough of Haringey
Alexandra Park and Palace Board, Tuesday 17 November 2015 at 7.30pm

EAST WING RESTORATION REPORT

Noted Committee 1 paper

Alexandra Park and Palace Board noted this item on Tuesday 17 November 2015. Below is the council's own wording, with the papers it was decided on.

Item44

Resolved

RESOLVED to note to contents of the report.
Word for word from the decision Haringey published for this meeting. Source: www.minutes.haringey.gov.uk

Follow this further

Built from Haringey's papers

What the report saysPro

Report to Alexandra Park and Palace Board

Agenda item: 10

Alexandra Park and Palace Board 17 November 2015

Report Title: East Wing Restoration Report

Report of: Emma Dagnes, Managing Director, Alexandra Park and Palace

1. Purpose 1.1 To update the Board of progress of the East Wing Restoration project

2. Recommendations 2.1 The Board are asked to note the contents of this report

Report Authorised by: Louise Stewart, Chief Executive, Alexandra Park and Palace

Contact Officer: Emma Dagnes, Alexandra Park & Palace, Alexandra Palace Way, Wood Green N22 7AY Tel No. 020 8365 4340

3. Executive Summary 3.1 The design team have been progressing with RIBA stage 4 (technical design) deliverables including reviewing the Theatre ceiling walkway, the acoustic treatment of the East Court, and the roof light leading into the BBC foyer.

3.2The Theatre’s artistic policy and the fundraising strategy are currently under review following the recent appointment of the new Chief Executive.

4. Reasons for any change in policy or for new policy development (if applicable) 4.1 N/A

5. Local Government (Access to Information) Act 1985 5.1 N/A 6. UPDATE JULY - OCTOBER

6.1Following the formal issue of tender documents on 7th September, a mid-tender review was held on the 23rd September at the Palace where contractors were given a further guided tour. A number of follow-up visits by all contractors with their respective supply chains have also taken place. Tenders have been received by the deadline of the 26th October 2015. The Project Board has met twice since the last Trustee Board meeting and the Programme Board has also met twice.

7. DESIGN

The design team have been progressing with the development of RIBA Stage 4 (Technical Design) deliverables including engineering to the Theatre, finishes and containment to the BBC Studios, roof light proposals to the BBC Foyer, rainwater and below ground drainage systems and options for acoustic treatments, amongst other items.

7.1Theatre

The Theatre Designers are reviewing the theatre ceiling walkway and levels with a view to establishing a preferred arrangement. A 3D model of the theatre roof space is being produced and will be used to facilitate coordination of the walkways and the ventilation plenums.

The scaffold specification and loadings for the ceiling plasterwork investigations were completed and the condition survey commenced at the start of October. Work is on schedule and will be completed at the start of November. During this time the Haringey Council Conservation Officer and the Inspector of Historic Buildings and Areas from Historic England attended site to take advantage of the access the scaffolding tower allowed to areas of the ceiling which would normally be too difficult to safely reach.

The team are looking in more detail at the roof trusses and structural repairs and also the balcony seating structure / support work needed. Further work has been developed in relation to the floor levels and seating.

7.2East Court

The team have been looking further into acoustic treatment of the space, in particular sound absorption measures including baffles and banners, as well as furnishings and fittings.

7.3BBC Wing

Further review work is being undertaken in regards to the roof light into the BBC foyer with a view to utilising the maximum glass sheet size.

7.4General

A significant amount of work has been undertaken by the Palace’s operations teams (Events, Catering, Facilities) with Building Performance consultants in preparing a number of use scenarios for the Theatre, East Court and BBC Wing to establish how events in these areas will be integrated with the existing events programme on the site. This has also included presentations illustrating various fire scenarios for the review of the Palace team. 7.5 Planning / Listed Building Consent / Building Control

Building Control consultants were appointed towards the end of the Development Phase with meetings held in this period between the approved inspector and the relevant design team members.

7.6Health & Safety

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
EAST WING RESTORATION REPORTMinutes 94 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

8 of 10 attended
JC
Councillor Joanna ChristophidesChair, present
TG
Councillor Tim GallagherVice-Chair, present
NW
Nigel WillmottNon-voting, present
RK
Robert KidbyNon-voting, absent
PB
Councillor Patrick BerrymanCommittee Member, present
BH
Councillor Bob HareCommittee Member, present
GH
Gordon HutchinsonNon-voting, present
LM
Councillor Liz McShaneCommittee Member, apologies
AS
Councillor Anne StennettCommittee Member, present
SM
Councillor Stephen MannNon-voting, present

On this subject at Haringey

Search all
  1. EAST WING RESTORATION REPORTThis decision
  2. East wing restoration updateNoted
  3. East wing restoration project reportNoted
  4. East wing restoration projectNoted
  5. East wing restoration project reportApproved
  6. East wing restoration project reportNoted

More from Haringey Alexandra Park and Palace Board

All decisions
MeetingDecisionOutcome
29 Oct 2026 Charitable Trust Progress ReportThe Committee noted the report. Noted Open
29 Oct 2026 FRRAC Chair's Report (Verbal update)The Committee noted the report. Noted Open
29 Oct 2026 Finance ReportThe Committee noted the 2026/27 forecast against revised budget. Noted Open
29 Oct 2026 Panorama Room ReportThe Committee noted the report. Noted Open
29 Oct 2026 Environmental Sustainability UpdateThe Committee noted the contents of this report and approve the Carbon Reduction Plan at Appendix 1. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies