Resolved
Resolved To approve the Fabric Maintenance Plan priorities for 2018/19 presented in the PowerPoint document during the meeting.
Alexandra Park and Palace Board approved this item on Tuesday 11 September 2018. Below is the council's own wording, with the papers it was decided on.
Resolved
Resolved To approve the Fabric Maintenance Plan priorities for 2018/19 presented in the PowerPoint document during the meeting.
1.1To approve the Fabric Maintenance Plan priorities for 2018/19 that will be presented in the PowerPoint document during the meeting.
2. Reason for the decision/ background
2.1Further to the preparation of the 10-year Fabric Maintenance Plan by the Surveyor to the Fabric, Purcell, in 2014 an update has been undertaken and the priorities for Year 5 2018/19 are proposed within Appendix 1.
2.2Over 10 years the plan identified that the Trust needed to spend £14.7m on the building fabric repairs, services repair/renewals, and improved roof access. This covered maintaining and repairing the existing elements, rather than wholescale enhancements which would be covered by major projects. The Trust’s capital budget and project funds do not cover all of the scheduled works.
2.3The services elements (electrics, fire systems etc) on the Theatre, East Court and BBC Studios were excluded from the FMP, as complete redesign and renewal was envisaged under the East Wing Restoration Project (EWRP).
2.4Overall progress to date on the 10-year Fabric Maintenance Plan is 21% (actual against target of 43% for end of Year 4).
2.5The requirements (not actual funds available) break down as: Building Fabric Repairs 18.5% of £11,850,200 Services Repair/Renewal 44% of £2,569,400 Roof Access Installations 1% of £279,800
2.6Year 4 continued to focus on Health and Safety and making the building weather- tight, and has been predominately successful, although there has been some deterioration particularly in the roofs over the TV studios.
2.7The fabric repairs within the FMP for the Theatre and East Court and associated spaces have been progressed as part of the main East Wing Restoration Project with the Enabling Works having been completed in Year 3, and the fabric repair therefore falling primarily into Year 4 of the FMP.
2.8Deferral of the TV studios restoration (as originally part of the East Wing Restoration Project) will further delay the progress of the FMP scheduled fabric repair and services renewal in these areas into Year 6 and beyond.
2.9Installing safe access to all roof areas is a priority for Years 5 and 6 and some permanent roof access installations are incorporated in the East Wing Restoration Project and West Yard Project in Year 4.
2.10The condition of the East Court glazing has continued to deteriorate, with urgent investigations and repairs carried out to the SW corner, and a general overhaul is planned for Year 5 from the allowance within the East Wing Restoration Project fund and is being procured directly, rather than through the main contractor.
2.11In view of the delays to the conservation works to the external elevations we have continued the bi-monthly periodic inspections by cherry picker and spider machine, to monitor the condition and make safe where necessary. These are proving essential and modest repairs and pinning works have been carried out to areas of the Great Hall South, the North Wall and the SW Tower to help retain the original fabric.
2.12Further progress has been made on the renewal of services, with priority on providing fire alarm cover where lacking and/or unreliable and to achieve energy savings.
2.13The FMP is split into 13 building sectors and the condition of each element has been reassessed to compare between the original survey of 2014 and that of late 2018, and are classed as ‘Poor’, ‘Fair’ and ‘Good’.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
ANNUAL REPORT ON FABRIC MAINTENANCE PLANMinutes | 4 pages | DownloadRead as text |
PDF |
Item 11 FMP AppendixMinutes | 12 pages | Download |
Follow Alexandra Park and Palace Board at Haringey and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 29 Oct 2026 | Charitable Trust Progress ReportThe Committee noted the report. | Noted | Open |
| 29 Oct 2026 | FRRAC Chair's Report (Verbal update)The Committee noted the report. | Noted | Open |
| 29 Oct 2026 | Finance ReportThe Committee noted the 2026/27 forecast against revised budget. | Noted | Open |
| 29 Oct 2026 | Panorama Room ReportThe Committee noted the report. | Noted | Open |
| 29 Oct 2026 | Environmental Sustainability UpdateThe Committee noted the contents of this report and approve the Carbon Reduction Plan at Appendix 1. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.