CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
London Borough of Haringey
Alexandra Park and Palace Board, Monday 14 December 2020 at 7.30pm

CEO's REPORT

Noted Committee 1 paper

Alexandra Park and Palace Board noted this item on Monday 14 December 2020. Below is the council's own wording, with the papers it was decided on.

Item52

Resolved

RESOLVED that the report be noted.
Word for word from the decision Haringey published for this meeting. Source: www.minutes.haringey.gov.uk

Follow this further

Built from Haringey's papers

What the report saysPro

Report to Alexandra Park and Palace Board, 4 pages

Recommendation

To note the content of this report.

2. Governance

Changes to Board Members

Due to changes to elected member appointments at Haringey Council, the Trust welcomed Cllr Mike Hakata and Cllr Elin Weston on 1st October 2020 as the new Chair and Vice-Chair of the APPCT Board.

3. Repairs & Maintenance

Public Areas  Ice Rink reopening works included reflective ceiling repairs, rink pad painting and application of the AP Monogram, new perimeter kicker plates, ice reinstated, ice pit and sump waterproofing and drainage survey, stud flooring repairs throughout skate hire and Café, redecoration by stands and to doors and East Corridor plinths, render repairs to plinths to Cafe/Reception and part Ice Rink, overhaul of roof lanterns over Reception, re-plastering of west staircase, and installation of sink and hot water to skate hire.  East Corridor temporary reception desk, new Ice Rink signage, and partial redecoration.  Great Hall abseil glazing survey, abseil inspections and welding repairs to external spaceframes including sample decoration panel, repairs to floor expansion joints (and minor filming damage).  East Court and Theatre - Final snagging works from East Wing Restoration Project, servicing of vents and joist hanger strengthening to Theatre ceiling.  Panorama Room - Abseil cleaning of valley gutter to fabric roof and snagging works for basement project.  Covid measures to Ice Rink, West Hall and Palm Court, including screens and sanitizers units.  Periodic inspections to front elevations.  Pitch & Putt - Repairs and redecoration Back of House  West Yard Building - Installation of cage over lift shaft and commissioning of goods lift.  West Yard - Installation of trough sink for contractors/staff.  North Yard/GH Bridge - Structural survey and CAD drawings.  North Yard/Palace Suite - Commence dismantling of redundant chiller plant.  BBC Tower - Ceiling propping and repair to 4th floor, and partial office re-plastering and redecoration.  Periodic inspections to rear elevations.

4. Covid update

4.1Anti-social behavior and Alexandra Palace Way

Despite the closure of parking bays, evening and night time drivers and anti-social behaviour (ASB) is now blocking a lane of Alexandra Place Way some evenings. We remain in dialogue with the Police about measures to be taken. Crimes and anti-social behaviour should be reported to the local authority’s dedicated ASB Team (Tel 020 8489 1335) and the Police.

The road was closed around fireworks weekend to prevent an anticipated increase in ASB particularly related to setting off fireworks illegally in the grounds, which is a risk to the building and public safety. The measures were effective at keeping ASB levels low.

4.2Visitor Services

The Palace remains largely closed and the visitor services team continues to operate with limited staff. Calls are diverted to a mobile phone and, if the visitor services assistant is already on a call, the line rings out, when it would normally be diverted to another telephone line. We encourage anyone who has difficulty getting through by telephone at the current time to use the ‘Contact Us’ form on our website: https://www.alexandrapalace.com/contact/get-in- touch/#:~:text=Should%20you%20have%20any%20concerns,2121.

4.3Culture Recovery Fund

At the time of writing this report the Trust was waiting on the outcome of its application to the Culture Recovery Fund. Although some announcements have been made, the announcements for the strand of the CRF that the Trust applied for have yet to be made.

5. Park

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
CEO's REPORTMinutes 4 pages DownloadRead as text

At this meeting

Whole meeting

On this subject at Haringey

Search all
  1. CEO's REPORTThis decision
  2. CEO's GENERAL UPDATE REPORTNoted
  3. Ceo's general updateNoted
  4. Ceo reportNoted
  5. Chief executive officer (ceo) updateNoted
  6. CEOs REPORTNoted

More from Haringey Alexandra Park and Palace Board

All decisions
MeetingDecisionOutcome
29 Oct 2026 Charitable Trust Progress ReportThe Committee noted the report. Noted Open
29 Oct 2026 FRRAC Chair's Report (Verbal update)The Committee noted the report. Noted Open
29 Oct 2026 Finance ReportThe Committee noted the 2026/27 forecast against revised budget. Noted Open
29 Oct 2026 Panorama Room ReportThe Committee noted the report. Noted Open
29 Oct 2026 Environmental Sustainability UpdateThe Committee noted the contents of this report and approve the Carbon Reduction Plan at Appendix 1. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies