CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
London Borough of Haringey
Alexandra Park and Palace Board, Thursday 29 September 2022 at 7.30pm

SIGNAGE AND WAYFINDING FRAMEWORK

Approved Committee 2 papers

Alexandra Park and Palace Board approved this item on Thursday 29 September 2022. Below is the council's own wording, with the papers it was decided on.

Item9

Resolved

RESOLVED To approve the proposed framework for signage and wayfinding, subject to any comments from the Advisory and Consultative Committees.
Word for word from the decision Haringey published for this meeting. Source: www.minutes.haringey.gov.uk

Follow this further

Built from Haringey's papers

What the report saysPro

Report to Alexandra Park and Palace Board, 15 pages

APPCT SIGNAGE AND WAYFINDING FRAMEWORK July 2022

SIGNAGE AND WAYFINDING FRAMEWORK July 2022

Page 1 of 15 APPCT SIGNAGE AND WAYFINDING FRAMEWORK July 2022

1.0Introduction and Background 1.1 Inclusive signage and wayfinding There are four basic principles 1in sign design:

• Signs should only be used when necessary; • Sign location should be part of the process of planning the building and the environment; • Messages should be short, simple and easily understood; • Signs should be consistent, using prescribed typefaces, colours and contrast

Most signs can be divided into four functional groups: Information signs: for orientation and include the building, car parks and other internal signs identifying main locations inside the building and include directories, maps and plans covering the whole site, internally and externally. Direction signs: for directing visitors to destinations using arrows and can include directional text. Identification or location signs: these signs – always without an arrow – are installed at individual destinations to indicate the location of a facility or service, a room or a person, once the destination has been reached. Safety, fire safety and mandatory signs: these are essential for the safety of users and can be either warning or prohibition signs. They will be positioned in strategic locations to give warnings. They include exit signs, fire exit signs and details of fire equipment.

1.2Wayfinding as architecture In the context of Alexandra Park and Palace, wayfinding should be considered as an architectural layer – critical to helping visitors not only find their way around but also to create a sense of place that positively impacts on their experience on site. The following issues require consideration when planning for wayfinding interventions: Orientation: at the most basic level, visitors need to be able to find what they need – Where’s the front door? Where is the bus stop? Where is the bar? Where do I get my tickets from? Graphic identity: having a strong graphic identity based on both historic and contemporary qualities of the Park and Palace will strengthen and reinforce the experience visitors will have on site. Material language: wayfinding should be informed by the historic significance of the site in the same way new materials are used for architectural interventions. Hierarchy of spaces: wayfinding should help visitors understand the importance of spaces and help them quickly choose where they want to be and know how to get there.

1 Sign Design Guide: a guide to inclusive signage (JMU and the Sign Design Society)

Page 2 of 15 APPCT SIGNAGE AND WAYFINDING FRAMEWORK July 2022

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
11b. Wayfinding Fwk DRAFT 2022Minutes 15 pages DownloadRead as text
PDF
SIGNAGE AND WAYFINDING FRAMEWORKMinutes 2 pages Download

At this meeting

Whole meeting

On this subject at Haringey

Search all
  1. SIGNAGE AND WAYFINDING FRAMEWORKThis decision
  2. Signage and wayfinding framework (draft)Decided

More from Haringey Alexandra Park and Palace Board

All decisions
MeetingDecisionOutcome
29 Oct 2026 Charitable Trust Progress ReportThe Committee noted the report. Noted Open
29 Oct 2026 FRRAC Chair's Report (Verbal update)The Committee noted the report. Noted Open
29 Oct 2026 Finance ReportThe Committee noted the 2026/27 forecast against revised budget. Noted Open
29 Oct 2026 Panorama Room ReportThe Committee noted the report. Noted Open
29 Oct 2026 Environmental Sustainability UpdateThe Committee noted the contents of this report and approve the Carbon Reduction Plan at Appendix 1. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies