That the application be approved subject to: a. The conditions as set out within the report; b. The completion of a S106 agreement to include; · Provision for traffic signals and maintenance sum · Travel Plan and monitoring sum of £5,000 · Ecology mitigation · 12% affordable housing · Viability reappraisal at reserved matters stage · Management of unsold on-site open space c. An additional condition to require that the applicant provides a feasibility study (including costings) and design for the Trans Pennine Trail (TPT): 2. That it be noted that the recommendation was made following careful consideration of all the issues raised through the application process and through discussion with the applicant. In accordance with paragraphs 186 and 187 of the NPPF, the Case Officer has sought solutions where possible to secure a development that improves the economic, social and environmental conditions of the area; 3. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Operations Manager – Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
Date 12th June 2017
Application HPK/2016/0691 No: Location Bridge Mills, New Road, Tintwistle Proposal Outline planning permission will all matters reserved (except for access) for up to 165 dwellings with associated works, public open space and vehicular and pedestrian access off New Road. Applicant BXB Tintwistle Ltd Agent Nexus Planning Parish/ward Tintwistle Date registered 22/12/2016 If you have a question about this report please contact: Rachael Simpkin, [email protected] 01298 28400 extension 4122
1. SUMMARY OF RECOMMENDATION
Approve, subject to conditions and s106 legal agreement as recommended.
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The 4.01ha application site was formerly occupied by a textile mill, which was destroyed by fire. It comprises predominantly of previously developed land, originally Bridge Mills, which lies immediately to the north of the River Etherow taking access off New Road within the Parish of Tintwistle. Hadfield town centre is approximately half a mile to the southeast of the site.
2.2The site is predominantly flat and due to previous land filling is raised up by approximately 6.0m from the River Etherow. There are a number of areas of existing hard standing on the site and the site is generally open.
2.3An unmade track intersects the site running from east to west from the sites access on New Road to an existing waste water transfer works which adjoins the site’s western boundary. The site is at a much higher level than the treatment works and is separated and screened from it by significant existing landscaping and trees.
2.4The northern boundary of the site rises in height and is also well landscaped with existing trees/vegetation. An existing Public Right of Way, (TINT 2) runs along this boundary connecting New Road to Woodlands Close and also the residential properties, which are situated to the north of the site.
2.5New Road bounds the site’s eastern site boundary, separated from it by a substantial stone wall. New Road connects Hadfield to the A628 (T) Woodhead Road, which runs through Tintwistle connecting Manchester to Sheffield.
2.6The site itself lies within mixed surrounds with residential development to the north and the industrial development of Rossington Park and Waterside to the south of the site. It further lies in the Longdendale Valley which supports recreation to the west within Etherow Park and Bottoms Reservoir to the west. The Trans Pennine Trail runs through the valley and its route falls adjacent to the river within the site.
3. DESCRIPTION OF THE PROPOSAL
3.1The application has been submitted in an outline form, including details of access with all other matters including appearance, landscaping, layout and scale reserved for future determination.
3.2An indicative layout submitted with the application seeks to demonstrate that up to 165 dwellings can be accommodated on the site – expressed as houses, 3-storey townhouses and 3-storey apartment blocks.
3.3The key aspects of the development are set out as follows:
Up to 165 dwellings Vehicular and pedestrian access to the site off New Road Provision of a section of the Trans Pennine Trail to be implemented adjacent to the River Etherow and land gifted to Derbyshire County Council Potential new pedestrian links to the existing footpath to the north of the site Retention and enhancement of an ecological corridor adjacent to the River Etherow Sustainable Urban Drainage Systems (SuDS) onsite, with a detention basin in the south-west corner of the site
3.4The parameters plan, for which the applicant seeks approval for sets out the following zones:
Zone 1 (3.3ha) Residential C3 (minimum 153 (46dph) to 165 (50dph) dwellings up to 3-storeys) Zone 2 (0.18ha) Ecological Buffer (clear zone, set 8.0m from river edge) Zone 3 (0.24ha) Trans Pennine Trail Zone 4 (0.12ha) Public Open Space Zone 5 (0.15ha) Landscape Buffer
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.