That the application be refused for reasons 1-3 as set out in the report (reasons for refusal 4 and 5 having being removed as set out in the update sheet); 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions/ informatives /planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
11th December 2023
Application No: HPK/2023/0061 Location Land to the west of Bridgemont, Whaley Bridge, SK23 7PB Proposal Outline planning application for affordable housing (up to 42 dwellings) with access considered and all other matters reserved (resubmission of HPK/2020/0180) Applicant Treville Properties Ltd and Great Places Agent [name removed], Emery Planning Partnership Ltd Parish/Ward Whaley Bridge Date registered: 06/03/2023 If you have a question about this report please contact: Rachael Simpkin [email protected] 01538 395400 extension 4122
REFERRAL
The full planning application is categorised as a small scale major and is locally controversial.
1. SUMMARY OF RECOMMENDATION
REFUSE:
Inappropriate Development within the Green Belt and Landscape Harm, including potential landscape harm to the setting of the Peak District National Park
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The scheme relates to a c.1.0 hectare (ha) elongated site of broadly “greenfield” undeveloped, grassland adjacent to the small settlement of Bridgemont, which is washed over by Green Belt as defined by the High Peak Adopted Local Plan.
2.2The former Dog and Partridge PH (Public House) hard surfaced carpark adjacent to 32 Buxton Road is considered to be previously developed land (and the subject of dismissed appeals) and is identified as the vehicular access point for the scheme alongside proposed residential development. The former PH itself has been redeveloped for housing and is now a pair of dwellings (nos. 32 and 34 Buxton Road).
2.3The application site is notably elevated above this part of the Bridgemont settlement comprising of frontage development along a truncated section of Buxton Road, which was formerly part of the A6 from Whaley Bridge to Stockport. A further part of the settlement lies to the north of the point where a new section of the A6 has been built. The southern part of Bridgemont includes a community hall and play area to the north of no. 52 Buxton Road. Thereafter, a road links to a small industrial area to the west of the Manchester to Buxton railway line.
2.4The application site mostly occupies elevated land between the railway line and the woodland block / two-storey terraced properties / hall positioned on lower ground to the western side of Buxton Road whilst open fields lie to the west and southwest. Further north and prior to the railway bridge, a small pocket of affordable housing properties have been constructed served from Buxton Road. On the eastern side of Buxton Road, a similar terrace of two-storey houses continues to the south for a distance of approximately 40.0 metres (m).
2.5The parcel of land slopes away from the railway line east to a point above the properties at Bridgemont and narrowing from the north to a point in the south approximately 55.0m to the west of the Whaley Bridge development boundary. Footpath HP23/15/2 passes the northern boundary of the playground and crosses the railway line to the west at the point of the bridge to travel along the railway line in a southerly direction adjacent to the western boundary of the application site.
2.6The poultry housing structures and vehicles littering the application site in parts appear to be unauthorised. The hard surfacing access works undertaken by Network Rail are understood to have facilitated essential maintenance of the adjoining railway, which now appears to be complete. These matters are currently being investigated by the Council’s Planning Enforcement Team and therefore are not considered to be relevant to the officer assessment of the current scheme.
Aerial Photograph pre-2017 3. DESCRIPTION OF THE PROPOSAL
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.