That planning permission be approved for the following reasons: a. The proposed development would allow the existing business to expand and remain viable and secure employment opportunities in the long term, in accord with Policy S4 of the High Peak Local Plan 2016 and the NPPF and the governments intention to build a strong and competitive economy. b. Though the proposed development would be larger than the existing storage containers, it comprised development on a brownfield site at the very edge of the greenbelt and would comprise a significant visual improvement to the site. c. These very special circumstances are considered to outweigh the harm to the openness of the green belt in accordance with paragraph 88 of the NPPF. 2. That authority be delegated to the Operations Manager – Development Services, in consultation with the Chair to agree the conditions and informatives to be added prior to the decision being issued. 3. That it be noted that as approval of the application could be interpreted as a significant departure from national and local Green Belt policy it may need to be referred to the National Planning Casework Unit for consideration for a possible ‘call-in’ prior to the decision being issued. This matter to be delegated to officers.
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
Date 4th September 2017
Application HPK/2017/0162 No: Location Unit 4, Hague Bar Works, Hague Bar, New Mills Proposal Removal of existing containers and replaced by new two storey storage building with offices above Applicant [name removed] [name removed]/ward New Mills West Ward Date registered 22 May 2017 If you have a question about this report please contact: Mark Ollerenshaw, [email protected] 01538 395400 ext. 4921
REFERRAL
The application has been referred by the Operations Manager – Development Services to consider the Green Belt implications.
1. SUMMARY OF RECOMMENDATION
REFUSE
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The site comprises a yard area associated with Hague Bar Works, which is an industrial site currently occupied by two businesses, Applied Industries and Tec-Ties Ltd, the later being the applicant’s own company. The proposed warehouse/office block is for Tec-Ties Ltd. The site is currently occupied by an area of hardstanding and containers. The site slopes gently down from Hague Bar Road with a steep slope down to the railway embankment beyond. The main factory building is to the east. Hague Bar House (flats) is to the west of the site. Access into the site is from Hague Bar Road with terraced properties on the opposite side of the road.
2.2The site is outside the built up area boundary within land designated in the Local Plan as Green Belt and Open Countryside.
3. DESCRIPTION OF THE PROPOSAL
3.1Full planning permission is sought for the erection of a two storey storage/warehouse building with office accommodation above following removal of the existing containers. The proposed building would be sited in the south west corner of the site. It would have a footprint of approx. 13.5m by 10.5m, an eaves height of 5.5m and a ridge height of 9m. Materials used
1 in the external surfaces of the proposed building would comprise cream rendered walls with stone detailing and a slate roof.
3.2The application form states that there are currently 11 existing employees and that this number would remain the same following the proposed development. However, the applicant has since clarified that the number of employees would increase to at least 13, possibly 14, with the addition of two new machines. Hours of opening would be 8am to 5pm Monday to Friday with occasional opening on Saturdays.
3.3The application, the details attached to it, including the plans, comments made by residents and the responses of the consultees can be found on the Council’s website at:
S1 – Sustainable Development Principles S1a – Presumption in Favour of Sustainable Development S2 – Settlement Hierarchy S6 – Central sub area strategy EQ1 – Climate Change EQ2 – Landscape Character EQ3 – Rural Development EQ4 – Green Belt Development EQ5 – Biodiversity EQ6 – Design and Place Making EQ8 – Green Infrastructure EQ9 – Trees, Woodland and Hedgerows
2 EQ10 – Pollution Control and Unstable Land EQ11 – Flood Risk Management E1 – New Employment Development CF6 – Accessibility and Transport
National Planning Policy Framework
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.