CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
High Peak Borough Council
Development Control Committee, Monday 30 October 2017 at 1.30pm

HPK/2017/0474 British Telecom Repeater Station, Manchester Road, Buxton

Approved Planning 1 paper

Development Control Committee approved this item on Monday 30 October 2017. Below is the council's own wording, with the papers it was decided on.

Item18/52

Resolved

That planning permission be approved as set out within the report; 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Operations Manager – Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Development Control Committee

HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE

Date 30th October 2017

Application HPK/2017/0474 No: Location British Telecom Repeater Station, Manchester Road, Buxton Proposal Change of use from Industrial to Residential Use and creation of rear terrace Applicant [name removed] Butterworth, Studio J Architects Ltd Parish/ward Corbar Ward Date registered 8th September 2017 If you have a question about this report please contact: Faye Plant, [email protected] 01538 395400 ext. 4995

REFERRAL

This application has been brought before the Development Control Committee as the applicant is the spouse of a High Peak Borough Council employee and also at the request of Councillor Kemp, ward member for Corbar for the following reason:

The nature of the application is a matter of wider public interest.

1. SUMMARY OF RECOMMENDATION

APPROVAL, subject to conditions

2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS

2.1This application relates to a vacant flat roof stone building situated within the countryside as identified within the High Peak Local Plan 2016. The building was constructed in 1954 and has been in previous use as a telephone repeater station for British Telecom although has been vacant for some time.

2.2The site is within a relatively remote location on the outskirts of Buxton, approximately 2km from the town centre, positioned on the southern side of Long Hill (A5004), the main road running between Whaley Bridge and Buxton. The property occupies a rectangular plot and is set down from the highway to the north east, enclosed by a stone wall. The site is sloped and the land falls away more steeply to the rear of the building. The site is within the ‘moorland fringe’ landscape character setting. 2.3 Consent was granted in 2014 (HPK/2014/0235) for the conversion of this building into a dwelling. This was never implemented and the consent has subsequently expired.

3. DESCRIPTION OF THE PROPOSAL

3.1Full planning permission is sought for the change of use of the building to a 4 bed dwelling. The proposal involves the reuse of all existing openings on the northern, eastern, and southern elevations with the alteration of a window to door and opening of a metal duct to an additional window on the western elevation. The existing ramp on the southern elevation is to be utilised as a terrace with the removal of the existing high stone wall and replacement with a simple glazed balustrade.

3.2The windows are to be replaced from Upvc to grey aluminium with the doors also being grey aluminium. It is proposed to insert 8 roof lights throughout the flat roof which will be covered with a fibre glass finish.

3.3The existing parking area to the western side of the building is to be hard surfaced with the area to the front of the building hard surfaced to provide a turning head. Notwithstanding the plan detailing the works in the highway verge to include a kerb, as these works do not alter the access point to the building they do not require planning consent. The existing boundary stone wall is to be restored and will serve as the boundary to the domestic curtilage for the proposed dwelling. A new septic tank will be located within the garden area.

3.4The application is accompanied by the following supporting documents: • Existing and proposed plans • Ecological Appraisal and update from 2014 report • Phase 1 Environmental Assessment • Transport Statement • Planning Statement

3.65The application, the details attached to it, including the plans, comments made by residents and the responses of the consultees can be found on the Council’s website at:

http://planning.highpeak.gov.uk/portal/servlets/ApplicationSearchServlet ?PKID=218390

4. RELEVANT PLANNING HISTORY

4.1The following is a summary of the relevant planning application relating to the site. HPK/2014/0235 Change of use from Industrial to Approved Residential Use and Creation of August 2014 Rear Terrace

5. PLANNING POLICIES RELEVANT TO THE DECISION

High Peak Local Plan Submission 2016

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
HPK/2017/0474 British Telecom Repeater Station, Manchester Road, BuxtonReport 82 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

9 of 16 attended
MF
Mark ForresterOfficer, expected
TC
Tanya CooperCouncil Staff, expected
DL
Councillor David LomaxChair, present
ET
Councillor Emily ThraneVice-Chair, present
AB
Councillor Alan BarrowCommittee Member, apologies
LD
Councillor Lance DowsonCommittee Member, present
SF
Councillor Samantha FlowerCommittee Member, apologies
CH
Councillor Caroline HoweCommittee Member, present
JK
Councillor John KappesCommittee Member, present
RM
Councillor Robert McKeownCommittee Member, present
GO
Councillor Graham OakleyCommittee Member, present
JT
Councillor Jean ToddCommittee Member, present

All 16 on the meeting page

More from High Peak Development Control Committee

All decisions
MeetingDecisionOutcome
10 Aug 2026 Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. Approved Open
10 Aug 2026 Update SheetThat the update sheet be noted. Noted Open
10 Aug 2026 Planning ApplicationsThat the report be noted. Noted Open
10 Aug 2026 HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... Approved Open
10 Aug 2026 HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies