That the application be approved, subject to the conditions as set out within the report; 2. That in the event of any changes being needed to the wording of the committee’s decision (such as to delete, vary or add conditions / informatives planning obligations and reasons for approval / refusal) prior to the decision being issued, the Operations Manager – Development Services be delegated authority to do so, in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the committee’s decision.
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
Date 30h October 2017
Application HPK/2017/0367 No: Location Land off Dukes Drive, Lime Tree Park, Buxton Proposal Change of use of land for extension to existing camp site Applicant [name removed] C Timothy, CT Planning Parish/ward Cote Heath Ward Date registered 18 July 2017 If you have a question about this report please contact: Mark Ollerenshaw, [email protected] 01538 395400 ext. 4921
REFERRAL
The application has been referred to committee as it is a major development.
1. SUMMARY OF RECOMMENDATION
APPROVE
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The site comprises a roughly square shaped field which in area extends to 1.88 hectares and is located to the east of Lime Tree Holiday Park. The site slopes upwards from north to south and is bounded by a combination of drystone walls and fencing.
2.2A public right of way runs through the site: HP18/1/1 connecting Dukes Drive to Staden Lane.
2.3The site is outside the built up area boundary within land designated in the Local Plan as Open Countryside and the Landscape Character Area is Plateau Pastures. Ashwood Dale is located immediately to the north of the site and is subject to a number of designations, including Ancient Woodland, Tree Preservation Order, Local Wildlife Site and Regionally Important Geological Site.
3. DESCRIPTION OF THE PROPOSAL
3.1Full planning permission is sought for a change of use of the land to a camping and caravan site as an extension to the existing camping and caravan site at Lime Tree Park together with associated engineering works.
3.2Parts of the site would be excavated to create level areas. The newly created terraced banks would be planted with native trees. Existing boundaries around the site would be retained. The application indicates that approximately 21 no. proposed caravan pitches can be accommodated on the site on ground reinforced mesh. Each caravan pitch would benefit from a below ground surface grey water tank. Grassed areas for camping pitches are provided to the north, east and south of the site. A 20 metre buffer zone is proposed at the north end of the site which would be planted with locally native trees and shrubs to match the existing wood.
3.3A circular access road would be created and this would follow the line of the existing public right of way through the site. The road would cross diagonally across the field, looping back to a lower terrace and exiting the field through a new gateway.
3.4The application, the details attached to it, including the plans, comments made by residents and the responses of the consultees can be found on the Council’s website at:
HPK/0003/4914 – Increase touring site from 30 to 64; erection of one new toilet block and implement store. Extend season to 11 months – Refused on 07/11/1995 but allowed on appeal.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.