That the application be approved as set out in the report, subject to: a. A Deed of Variation to the existing legal agreement; b. The conditions as set out in the report; and c. The additional conditions as recommended by DCC Flood Risk team and set out in the update sheet 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions/ informatives /planning obligations or reasons for approval / refusal) prior to the decision being issued, the Operations Manager – Development Services be delegated authority to do so in consultation with the Chair of the Development Control Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
Date 19th February 2018
Application HPK/2017/0673 No: Location Nestle Waters Uk Ltd, Waterswallows Lane, Fairfield, Buxton, Derbyshire Proposal Extension to existing bottling plant and distribution facility Applicant [name removed] [name removed]/ward Wormhill & Fairfield Green 19th March 2018 If you have a question about this report please contact: Ben Haywood [email protected] 01538 395400 ext. 4924
1. REFERRAL
The application is referred to Development Control Committee because it is a major development.
2. SUMMARY OF RECOMMENDATION
APPROVE subject to conditions
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The application relates to the existing Nestle Waters plant at Waterswallows. The existing building on site comprises of the production area, warehouse, social block and ancillary buildings. The buildings themselves are finished in a mixture of stone gabions and profile cladding and incorporate a distinctive “wave” form roof.
2.2The site is located 2.3 miles North East from Buxton town centre (Figure 1); it is currently within a 52.04 acre landholding under the control of Nestlé Waters. It lies within a broad corridor of land, including many features such as quarries, industry, pylons and overhead power cables, the A6 and various mineral sites which are excluded from the National Park. The boundary of the landholding extends to the West along the full length by Waterswallows Lane, to the South by a household recycling facility and light industrial development which present onto Waterswallows Road, to the East by adjacent fields which in turn present onto Longridge Lane and to the North by farm buildings and fields which present onto Batham Gate (Figure 2).
2.3There is a public footpath which runs North East to South West to the Southern end of the land holding. There are a number of services which run across the site – both overhead and underground. 2.4 The level of the landholding site falls 8 metres from the Northwest to the Southeast corner and by 9 metres along the length of Waterswallows Lane (650m).
2.5Land to the north of the current car park rises up by a level of 3.5 metres, formed through the construction of the current building. There is a minimal level change in the land around the existing building which is used for logistics, deliveries and car parking.
2.6The site frontage currently lies 0.5 to 3.5 metres below Waterswallows Lane and is defined by low level stone rubble wall..
2.7Beyond the current site boundary the development site has an open aspect, consisting of small rectilinear pasture fields bounded by local limestone random rubble dry stone walls. Adjacent to the site lie three significant developments: 1. A primary Sub Station to the Southwest. 2. An agricultural collective to the Northeast, and; 3. A cluster of industrial facilities including a waste recycling centre and distribution unit with HGV parking to the Southeast.
2.8To the east and west beyond the site the land rises to moorland and upland pasture. There are elevated views of the development site and adjacent land from Longridge Lane. The site is also visible from the A6 on the approach into Buxton. Elevated distant views of the site can also be viewed from the Moor to the West of the A6. The site lies in the context of substantial utility buildings fronting onto Waterswallows Lane on adjacent sites which house the electricity and gas sub stations.
3. DESCRIPTION OF THE PROPOSAL
3.1Full planning permission is sought for a large extension to the existing plant. The extension comprises of the following key components: • 1 line water bottling processing plant / facilities • Distribution & storage facilities • Water storage / utility tanks & associated plant • External canopies to the service yard areas • Staff and visitor car parking • External service yards • Landscaping within, to and beyond the perimeter of the site.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.