That the application be approved as set out within the report; 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions/ informatives / planning obligations for approval / refusal) prior to the decision being issued, the Operations Manager – Development Services be delegated authority to do so in consultation with the Chair of the Development Control Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
19th February 2018
Application HPK/2017/0632 No: Location Land Adj Unit 28 Harpur Hill Business Park, Harpur Hill, Buxton
Proposal Proposed portal framed storage warehouse building Applicant Vinyl Partners LLP Agent Stone Architectural Services Ltd Parish/ward Burbage Date 22.11.17 If you have a question about this report please contact: L isa Ho wa rd tel: 01538 395400 ex 4986 [email protected]
REFERRAL
This is a major planning application and as such in accordance with the HPBC Constitution this application must be determined at Planning Applications Committee.
1. SUMMARY OF RECOMMENDATION
Approve with Conditions
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The application relates to a site which is within the Harpur Hill Business Park, Harpur Hill, Buxton. This is located to the south of Buxton and Harpur Hill, within the Burbage Ward of the district. The site is access via Cedar Avenue which is served off Grinlow Road.
2.2To the north the site is bound by Swains Centre, Cedar Road which is a go- karting centre with outdoor race-track, the go-karting centre is also accessed off Cedar Road. To the west the site is adjacent to Buxton and Leek College skillsbase centre which is an industrial unit served with a car park and yard area and secured by an iron bar fence to its perimeter. To the south the site is bound by a public right of way which forms the route of a dismantled railway line, beyond which are further industrial units on Harpur Hill Business Park including Unit 25. There is a change in levels between the site and the public right of way to the south. To the east the site is directly adjacent to Unit 27 of the business park which is currently occupied by a scrap metal operation with associated yard and vehicle turning area.
2.3The site is located in a former landfill area and is located within the landfill buffer of 250m. The High Peak Borough Council Local Plan Policies Map identifies the site as having the potential for Radon gas. 2.4 The site is characterised by a flat area of land which is previously developed, it is made up of hardcore and concrete rubble surfacing. The site sits within a wider area which is a flat platform containing industrial uses also within the former landfill area, which has been landscaped and has a varied topography. There are no buildings currently on the site.
3. DESCRIPTION OF THE PROPOSAL
3.1The application seeks consent for a portal framed storage warehouse building which is 8.2m to eaves and 12.15m in height. The elevation plans submitted with the planning application show the building to have a double pitched roof. The building is proposed to be 48.45m in depth and 60.45m in length. The proposed use for the building is for the storage of speciality vinyl compounds, as set out in the Design & Access Statement. The front elevation of the proposed building will include two garage doors for servicing the storage building with vehicles and a pedestrian entrance door with windows which serves the office element of the building towards the centre of the front elevation.
3.2The appearance of the buildings will be industrial in nature with the walls and roof being constructed of a grey coloured metal clad material with rainwater goods, barge boards, drip flashings, door and window surrounds finished in a darker grey coloured material.
3.3To the north of the building, within the site boundary will be the forecourt area which will serve the building for delivery vehicles and parking. This forecourt will be finished with a tarmac surface with three landscaped beds to the front of the site bordering Cedar Avenue. The remainder of the site will be finished with a consolidated hardcore material.
3.4The application and all details associated with it can be found on the Council’s website at:
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.