APPROVED as set out in the report; 2. That in the event of any changes being needed to the wording of the committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Operations Manager – Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the committee’s decision.
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
Date 16th April 2018
Application HPK/2018/0014 No: Location The Natural Baths, The Crescent, Buxton Proposal To construct a modern hygenic ‘room within a room’ to sit inside the existing 1920’s Art deco style tiled walls and painted plastered ceiling. Applicant Nestle Waters UK Ltd Agent Parish/ward Corbar Ward Date registered 8th January 2018 If you have a question about this report please contact: Lisa Howard, Tel. 01538 395400 extension 4923, [email protected]
REASON FOR REFERRAL
This application has been brought before the Development Control Committee because the building is in the ownership of High Peak Borough Council.
1. SUMMARY OF RECOMMENDATION
APPROVE with conditions
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The Natural Mineral Baths are set in the context of a group of historic and highly significant buildings including the Old Hall Hotel (Grade II*), The Crescent (Grade I), The Pump Room (Grade II), the Thermal Baths (Grade II), The Square (Grade II*), Buxton Opera House (Grade II*) and the Pavillion Gardens (Grade II). The Natural Baths were re-built in 1712 by John Barker, and enlarged in 1750. In 1851-53 Henry Currey refurbished them to create new hydropathic facilities on the site of the earlier baths offering hot, cold and tepid baths.
2.2The ‘New’ Natural Mineral Baths were re-modelled in 1924 and the surviving neoclassical/Art Deco style ceramic wall timing dates from this period. The Natural Mineral Baths were opened by Sir Humphrey Rollerston, President of the Royal College of Physicians.
2.3The baths as found today date from their 1937 re-construction as public swimming pools, which operated until their closure in 1972 following the provision of a new swimming pool in the nearby pavilion Gardens. In 1986 a third of the ground floor of the building was used as a Tourist Information Centre until its closure circa 2011.
2.4The ‘Great Bath’, ‘Gentleman’s No.1 Bath’, or ‘Spring Bath’ as the most westerly of the baths have been known, subsequently became the source for commercial extraction by the Buxton Mineral Water Company in the 1980’s, following the earlier closure of the bath to the public.
2.5The natural Gritstone-lined, constantly fed, thermal Spring Bath was initially protected by a transparent acrylic sheet rigid roof with the water being piped through the cellar of the Natural Mineral Baths to the mineral water bottling plant, that was then located on Station Road. This cover was later replaced with the modern stainless steel and acrylic pyramidal hood found today and the water is now piped some 2.5 miles to Nestle Waters purpose built botting plant at Waterswallows Lane.
2.6The site lies within the heart of the town centre and the Buxton Central Conservation area for the purposes of the High Peak Local Plan.
3. DESCRIPTION OF THE PROPOSAL
3.1As part of its continual drive to ensure that the consistency and quality of the bottled mineral water is maintained, Nestle Waters are seeking to improve the hygienic conditions of their ‘pump room’ and to further protect the ‘Spring Bath’ and the natural source of Buxton Natural Mineral Water from any risk of contamination. To do so it is proposed to construct a new modern hygienic ‘room-within-a-room’ that is to sit inside the existing 1920’s Art Deco style tiled walls and painted plaster vaulted ceiling.
3.2The new internal room will be constructed from a proprietary flame-proof, food-safe, self-supporting HCFC-free insulated wall and ceiling panels, held within a self-supporting galvanised steel channel system, with food- safe acrylic inspection panels/windows and doors.
3.3The wall and ceiling panels will butt-up to the existing historic tiled wall and ceiling finish, which are to be first protected with a proprietary corrugated plastic damage protection sheet. The existing modern ceramic floor tiles will be re-finished. There will be not mechanical fixings penetrating through into the historic finishes or fabric.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.