Resolved
That consideration of the application be deferred to enable an independent traffic assessment to be undertaken.
Development Control Committee deferred this item on Monday 16 April 2018. Below is the council's own wording, with the papers it was decided on.
Resolved
That consideration of the application be deferred to enable an independent traffic assessment to be undertaken.
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
Date 16th April 2018
Application HPK/2017/0547 No: Location Land adjacent World of Power, Tongue Lane Industrial Estate, Dew Pond Lane, Fairfield, Buxton Proposal Construction of sui generis workshop with 3 No. haulage parking spaces and associated parking; construction of 2 No. commercial units with B1/B8 use for warehouse/distribution, associated office use and associated parking; retention of ground levelling and retaining walls. Applicant [name removed], Ivy Cottage, Priestcliffe Ditch, Buxton, SK17 9TH Agent [name removed], AJS Architecture, Buxton, Derbyshire, SK17 6WF Parish/ward Buxton/Stone Bench Ward Date registered 02/01/2018 If you have a question about this report please contact: John Williamson - Email [email protected]; Tel: 01538 395400 Ext: 4922; Mob: [phone removed]
This application has been brought before the committee at the request of Councillor Grooby for the following reason:
The proposals will increase the danger to the residents on the residential estate and the effect of noise and disturbance to the residents.
1. SUMMARY OF RECOMMENDATION
Approve, subject to conditions
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The site is located on Tongue Lane Industrial Estate, Fairfield. The site is a piece of vacant land (measuring approx. 0.17ha) situated between surrounding industrial/commercial units – World of Gym to the north, Bells Shoes to the south, Lomas’ haulage to the rear (east) and Fairfield Builders Supplies & New Gym opposite (west).
2.2This application has been submitted following an enforcement invesitgation which determined that planning permission was required for the works to ground levels and the retaining walls that had been erected. Therefore this application is in part retrospective. 2.3 In terms of the Local Plan designations the site is located within the built up area boundary, a Primary Employment Zone and ‘plateau pastures’ landscape character area.
3. DESCRIPTION OF THE PROPOSAL
3.1The application description has been amended to include works which have already taken place (ground levelling and erection of retaining walls); hence, the application now seeks full planning permission for construction of sui generis workshop with 3 No. haulage parking spaces and associated parking; construction of 2 No. commercial units with B1/B8 use for warehouse/distribution, associated office use and associated parking; retention of ground levelling and retaining walls. It is noted that revised plans have been received following comments from the Highway Authority. Some additional information has been submitted to clarify the use of proposed ‘sui generis’ building.
3.2The application and details attached to it - including the plans, supporting documents, representations and responses from consultees - can be found on the Council’s website at:-
http://planning.highpeak.gov.uk/portal/servlets/ApplicationSearchServlet?PKI D=219268
4. RELEVANT PLANNING HISTORY
4.1HPK/2008/0156 – Erection of single-storey training centre. Approved, 30.04.2008
http://planning.highpeak.gov.uk/portal/servlets/ApplicationSearchServlet?PKI D=102226
5. PLANNING POLICIES RELEVANT TO THE DECISION
Adopted High Peak Local Plan 2016
S1 Sustainable Development Principles S1a Presumption in Favour of Sustainable Development S2 Settlement Hierarchy S7 Buxton Sub-area Strategy EQ1 Climate Change EQ2 Landscape Character EQ6 Design and Place Making EQ11 Flood Risk Management E1 New Employment Development E2 Employment Land Allocations E3 Primary Employment Zones CF6 Accessibility and Transport National Planning Policy Framework
• Ministerial foreword • Introduction (Inc. Achieving sustainable development, presumption in favour of sustainable development, core planning principles, delivering sustainable development • 1 Building a strong and competitive economy • 4 Promoting sustainable transport • 7 Requiring good design • 10 Meeting the challenge of climate change, flooding and coastal change
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
HPK/2017/0547 Land adjacent World of Power, Tongue Lane Industrial Estate, Dew Pond Lane, Fairfield, BuxtonReport | 171 KB | DownloadRead as text |
Follow Development Control Committee at High Peak and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 10 Aug 2026 | Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. | Approved | Open |
| 10 Aug 2026 | Update SheetThat the update sheet be noted. | Noted | Open |
| 10 Aug 2026 | Planning ApplicationsThat the report be noted. | Noted | Open |
| 10 Aug 2026 | HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... | Approved | Open |
| 10 Aug 2026 | HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.