RESOLVED – That the application be APPROVED for the reasons and based on the policies contained in the report, subject to the conditions and informatives also contained in the report. (Proposed by Councillor Roberts and seconded by Councillor Gledhill.)
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
STAFFORDSHIRE MOORLANDS DISTRICT COUNCIL PLANNING APPLICATIONS COMMITTEE
7th June 2018
Application SMD/2018/0141 No: Location Alton Towers Proposal 102 accommodation pods, shower and toilet facility building entrance feature, hard and soft landscaping and parking and drainage works. Applicant Merlin Attractions Operations Ltd Agent Nathaniel Lichfield and Partners Parish/ward Alton Date registered 1/3/18 If you have a question about this report please contact: Jane Curley tel: 01538 395400 ex 4124 [email protected]
1. REASON FOR REFERAL
This is a major application. The previous application on the site for lodges was determined by the Planning Applications Committee.
2. SUMMARY OF RECOMMENDATION
APPROVE subject to conditions
3. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
3.1The site lies within the south eastern corner of the Alton Towers Resort. It is within the Alton/Farley Conservation Area. The site extends to approximately 1.88 hectares and is currently open grassland which is occasionally used for overflow car parking. It is close to but outside of the Registered Park and Garden to the south from which it is separated by the recently constructed Phase 1 lodge development. To the north, separated by an established tree belt is Car Park J. A small part of this car park which is currently landscaped and some of the tree belt are included in the application. To the west of the site is the existing hotel/ spa and to the east the site adjoins Phase 1 beyond which is established woodland. There are three individual parkland trees within the application site. Land within the application site falls in a southerly direction from a contour level of 168 AOD to 160 AOD along the southern boundary. Two public footpaths run close the North West and south eastern boundaries of the site. 4. DESCRIPTION OF THE PROPOSAL
4.1This is known as Phase 2 of the lodge development at Alton Towers. The proposal is for 102 pods with a shower/toilet facilities building, an entrance feature and area for tipis to the east. Amended plans show the pods sited towards the outer boundaries of the site in a double row enclosing a central area of open space with a footpath linking through which connects into existing footpaths beyond the application site including routes to Car park J where the guests will park.
4.2The applicant says that this proposal is in line with the long term plan at Alton Towers to increase multi day visits. Since the opening of the Phase 1 lodge development (Enchanted Village) in spring 2015, the applicant says that market research has shown that there remains a demand for additional lodge style accommodation but that this demand is for smaller, more basic accommodation units which this proposal is intended to meet.
4.3The pods have dimensions of 2.4m by 4.8m with a small decked area outside the entrance doors. Each pod is designed to sleep up to 4 people with one double bed and two singles. The pods will be 2.6m high. They are designed to be an integral part of the Phase 1 lodges so they will be finished in Siberian larch with galvanised brimet roof tiles and timber windows and doors (see DAS for images/visuals).
4.4Also proposed is a Facilities block to the south of the site (240sqm GEA). It has dimensions of approx. 11.4m by 22.5m and a maximum height of just under 4.5m. This new building will contain all facilities required to serve the guests staying within the pod development – toilets, changing areas, washbasins and showers. This building is shown to be finished in Wayney Edge timber with a synthetic grass roof (see DAS for images/visuals).
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.