CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
High Peak Borough Council
Development Control Committee, Monday 14 January 2019 at 1.30pm

HPK/2018/0492 Community Field, Park Avenue, Furness Vale

Approved Planning 1 paper

Development Control Committee approved this item on Monday 14 January 2019. Below is the council's own wording, with the papers it was decided on.

Item19/98

Resolved

That planning permission be approved as set out in the report; 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Operations Manager – Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Development Control Committee

HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE

Date 14th January 2019

Application HPK/2018/0492 No: Location Community Field, Park Avenue, Furness Vale Proposal New Changing Rooms and associated facilities Applicant [name removed] N/A Parish/ward Whaley Bridge / Whaley Bridge Date registered 15th October 2018 If you have a question about this report please contact: James Stannard, Tel. 01298 28400 extension 4298, [email protected]

1. SUMMARY OF RECOMMENDATION

Approve with Conditions

1. REASON FOR COMMITTEE DETERMINATION

1.1This application has been brought before the Development Control Committee because the site is owned by High Peak Borough Council.

2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS

2.1The application site comprises a small parcel of land on the Community Playing Field, Furness Vale, which includes a full size football pitch, used by the local football club, on the northern part of the playing field. The southern part of the playing field features open amenity space, and a series of public footpaths.

2.2The access to the site is from Park Avenue, a small residential street which terminates at the western boundary. The site is bounded by open agricultural land to the south and east, well screened by mature vegetation. To the south west, are the rear elevations of properties on Park Crescent. The north western boundary is defined by a public footpath and is also well screened by mature trees.

2.3The playing field has been landscaped so that the football pitch is sat on lower flat ground, with the paths and amenity grassland sat at a slightly higher level. 3. DESCRIPTION OF THE PROPOSAL

3.1The application seeks planning permission for a new changing rooms facility building ancillary to the football pitch, which would be used by Furness Vale Football Club.

3.2The building would be sited adjacent to the football pitch on its southern side, close to the entrance with Park Avenue. The Proposed Block Plan shows the building as having a square form which consists of two team changing rooms ‘A’ and ‘B’, each with four showers and two WC’s; two official’s changing room; a meeting room bar/café with a drinks counter; and storage.

3.3The building would span a width of approximately 12 metres and a length of 13 metres, with an eaves height of 2.5 metres and an overall ridge height of 4.1 metres. The building would be constructed of a natural stone with a dual pitch slate roof, with a small canopy area on the north eastern elevation facing the pitch.

4. RELEVANT PLANNING HISTORY

4.1The playing field has been subject to the following planning history:

HPK/2015/0083 Proposed construction of new paths and enlarged bays to accommodate benches and wheelchairs to the perimeter of the existing playing field - Approved 3rd June 2015)

HPK/2017/0016 Proposed construction of new paths complete with areas for benches and wheelchairs, and outdoor gym equipment - Approved 14th March 2017

5. PLANNING POLICIES RELEVANT TO THE DECISION

High Peak local Plan 2016

S1 Sustainable Development Principles S1a Presumption in Favour of Sustainable Development S7 Buxton Sub-area Strategy EQ6 Design and Place Making CF5 Provision and Retention of Local Community Services and Facilities

National Planning Policy Framework

Achieving Sustainable Development Chapter 2 Promoting Healthy and Safe Communities Chapter 8 Achieving Well Designed Places Chapter 12

6. CONSULTATIONS CARRIED OUT Site notice Expiry date for comments: 23rd November 2018

Neighbour letters Expiry date for comments: 14th November 2018

Press Notice N/A

Neighbours

6.1No representations have been received with regards to this application

Consultee Comment

Whaley Bridge Strongly supports application Town Council

United No objection subject to a condition requiring that foul and Utilities surface water shall be drained on separate systems

HPBC No objection subject to condition requiring a drainage Environmental feasibility study to be submitted and approved prior to Health commencement of development.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
HPK/2018/0492 Community Field, Park Avenue, Furness ValeReport 234 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

13 of 24 attended
DL
Councillor David LomaxChair, present
ET
Councillor Emily ThraneVice-Chair, present
AB
Councillor Alan BarrowCommittee Member, present
LD
Councillor Lance DowsonCommittee Member, present
CH
Councillor Caroline HoweCommittee Member, apologies, sent representative
JK
Councillor John KappesCommittee Member, present
AM
Councillor Anthony McKeownCommittee Member, present as substitute
RM
Councillor Robert McKeownCommittee Member, present
GO
Councillor Graham OakleyCommittee Member, apologies, sent representative
JP
Councillor Jim PerkinsCommittee Member, apologies
PR
Councillor Peter RobertsCommittee Member, present
KS
Councillor Kath SizelandCommittee Member, present as substitute

All 24 on the meeting page

On this subject at High Peak

Search all
  1. HPK/2018/0492 Community Field, Park Avenue, Furness ValeThis decision
  2. HPK/2024/0481 - Glossopdale Community College, Lower Site, Talbot Road, GlossopRefused
  3. HPK/2025/0206 - Glossop Community Sports Hub, Cemetery RoadApproved
  4. HPK/2022/0344 - Glossopdale Community College Lower Site, Talbot Road, Glossop, Derbyshire, SK13 7DRRefused
  5. HPK/2021/0005 Serpentine Community Gardens, located in Serpentine Walks, off Burlington Walk, BuxtonApproved

More from High Peak Development Control Committee

All decisions
MeetingDecisionOutcome
10 Aug 2026 Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. Approved Open
10 Aug 2026 Update SheetThat the update sheet be noted. Noted Open
10 Aug 2026 Planning ApplicationsThat the report be noted. Noted Open
10 Aug 2026 HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... Approved Open
10 Aug 2026 HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies