CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
High Peak Borough Council
Development Control Committee, Monday 14 January 2019 at 1.30pm

HPK/2018/0501 Lime Tree Park, Dukes Drive, Buxton

Approved Planning 1 paper

Development Control Committee approved this item on Monday 14 January 2019. Below is the council's own wording, with the papers it was decided on.

Item19/97

Resolved

That the application be approved as set out in the report; 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Operations Manager – Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Development Control Committee

HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE

Date 14th January 2019

Application HPK/2018/0501 No: Location Lime Tree Park, Dukes Drive, Buxton Proposal Change of use of land for extension to existing camp site to include the siting of 21 static caravans Applicant [name removed] C Timothy, CT Planning Parish/ward Cote Heath Ward Date registered 05 October 2018 If you have a question about this report please contact: Mark Ollerenshaw, [email protected] 01538 395400 ext. 4921

REFERRAL

The application has been referred to committee as it is a major development.

1. SUMMARY OF RECOMMENDATION

APPROVE

2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS

2.1The site comprises a roughly square shaped field which in area extends to 1.88 hectares and is located to the east of Lime Tree Holiday Park. The site slopes upwards from north to south and is bounded by a combination of drystone walls and fencing.

2.2A public right of way runs through the site: HP18/1/1 connecting Dukes Drive to Staden Lane.

2.3The site is outside the built up area boundary of Buxton within land designated in the Local Plan as Open Countryside and the Landscape Character Area is Plateau Pastures. Ashwood Dale is located immediately to the north of the site and is subject to a number of designations, including Ancient Woodland, Tree Preservation Order, Local Wildlife Site and Regionally Important Geological Site.

3. DESCRIPTION OF THE PROPOSAL

3.1Full planning permission is sought for a change of use of the land to a camping and caravan site as an extension to the existing camping and caravan site at Lime Tree Park together with associated engineering works. 3.2 Planning permission was granted in October 2017 (Ref. HPK/2017/0367) for an extension of the existing camping and caravan site to provide 21 no. touring caravan pitches and camping areas. The current application proposes that the 21 no. caravans be static. i.e. be available as self catering accommodation 365 days per year. As with the previous scheme, the surrounding land will be available as additional pitches for tents.

3.3Parts of the site would be excavated to create level areas. The newly created terraced banks would be planted with native trees. Existing boundaries around the site would be retained. The application indicates the locations of the proposed static caravans on ground reinforced mesh. Each caravan pitch would benefit from a below ground surface grey water tank. Grassed areas for camping pitches are provided to the north, east and south of the site. A 20 metre buffer zone is proposed at the north end of the site which would be planted with locally native trees and shrubs to match the existing woodland.

3.4A circular access road would be created through the site and this would partly follow the line of the existing public right of way. The road would cross diagonally across the field, looping back to a lower terrace and exiting the field through a new gateway.

3.5The application, the details attached to it, including the plans, comments made by residents and the responses of the consultees can be found on the Council’s website at:

http://planning.highpeak.gov.uk/portal/servlets/ApplicationSearchServlet?P KID=227950

4. RELEVANT PLANNING HISTORY

4.1The following is a summary of previous planning applications relating to the site.

HPK/2017/0367 – Change of use of land for extension to existing camp site – Approved 31/10/2017.

http://planning.highpeak.gov.uk/portal/servlets/ApplicationSearchServlet?P KID=217331

HPK/0003/6049 – Conversion of part of existing wardens dwelling into holiday flat – Approved 06/06/1997.

http://planning.highpeak.gov.uk/portal/servlets/ApplicationSearchServlet?P KID=27985

HPK/0003/5866 – Extensions to existing toilet block – Approved 17/12/1996. http://planning.highpeak.gov.uk/portal/servlets/ApplicationSearchServlet?P KID=27619

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
HPK/2018/0501 Lime Tree Park, Dukes Drive, BuxtonReport 214 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

13 of 24 attended
DL
Councillor David LomaxChair, present
ET
Councillor Emily ThraneVice-Chair, present
AB
Councillor Alan BarrowCommittee Member, present
LD
Councillor Lance DowsonCommittee Member, present
CH
Councillor Caroline HoweCommittee Member, apologies, sent representative
JK
Councillor John KappesCommittee Member, present
AM
Councillor Anthony McKeownCommittee Member, present as substitute
RM
Councillor Robert McKeownCommittee Member, present
GO
Councillor Graham OakleyCommittee Member, apologies, sent representative
JP
Councillor Jim PerkinsCommittee Member, apologies
PR
Councillor Peter RobertsCommittee Member, present
KS
Councillor Kath SizelandCommittee Member, present as substitute

All 24 on the meeting page

On this subject at High Peak

Search all
  1. HPK/2018/0501 Lime Tree Park, Dukes Drive, BuxtonThis decision
  2. HPK 2019 0450 Lime Tree Park Dukes Drive Buxton - variation of conditions 2 and 8 relating to HPK/2018/0501Approved
  3. HPK/2017/0367 Land off Dukes Drive, Lime Tree Park, BuxtonApproved
  4. HPK/2017/0008 5 Limehurst, Manchester Road, BuxtonApproved
  5. HPK/2017/0005 5 Limehurst, Manchester Road, BuxtonApproved

More from High Peak Development Control Committee

All decisions
MeetingDecisionOutcome
10 Aug 2026 Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. Approved Open
10 Aug 2026 Update SheetThat the update sheet be noted. Noted Open
10 Aug 2026 Planning ApplicationsThat the report be noted. Noted Open
10 Aug 2026 HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... Approved Open
10 Aug 2026 HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies