CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
High Peak Borough Council
Development Control Committee, Monday 4 February 2019 at 1.30pm

HPK/2018/0597 Unit 4, Hague Bar Works, Hague Bar, New Mills

Approved Planning 1 paper

Development Control Committee approved this item on Monday 4 February 2019. Below is the council's own wording, with the papers it was decided on.

Item19/107

Resolved

That planning permission be approved as set out in the report; 2. That in the event of any changes being needed to the wording of the committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Operations Manager – Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the committee’s decision.
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Development Control Committee

HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE

Date 4th February 2019

Application HPK/2018/0597 No: Location Unit 4, Hague Bar Works, Hague Bar, New Mills Proposal Application for variation of condition 2 in relation to HPK/2017/0162 Applicant [name removed] [name removed]/ward New Mills West Ward Date registered 14 December 2018 If you have a question about this report please contact: Mark Ollerenshaw, [email protected] 01538 395400 ext. 4921

REFERRAL

The application is referred to the Development Control Committee because the previous application was determined by Committee.

1. SUMMARY OF RECOMMENDATION

APPROVE

2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS

2.1The site comprises a yard area associated with Hague Bar Works, which is an industrial site currently occupied by two businesses, Applied Industries and Tec-Ties Ltd, the later being the applicant’s own company. The proposed warehouse/office block is for Tec-Ties Ltd. The site is currently occupied by an area of hardstanding and containers. The site slopes gently down from Hague Bar Road with a steep slope down to the railway embankment beyond. The main factory building is to the east. Hague Bar House (flats) is to the west of the site. Access into the site is from Hague Bar Road with terraced properties on the opposite side of the road.

2.2The site is outside the built up area boundary within land designated in the Local Plan as Green Belt and Open Countryside.

3. DESCRIPTION OF THE PROPOSAL

3.1This application seeks to vary Condition 2 attached to the previous approval for removal of existing containers and replacement with a new two storey storage building with offices above (ref. HPK/2017/0162), which was granted permission in October 2017. Condition 2 lists the approved plans

1 and the applicant is seeking to vary this condition to reference the updated plans which detail an amended layout. The applicant states that the amended layout allows easier on site operations including loading and unloading of materials.

3.2The previous application showed the proposed building within the south western corner of the site with the side elevation facing towards Hague Bar Road. The amended layout seeks to rotate the building through 90 degrees so that the narrower front elevation faces towards the road and the building would also be slightly closer to the western site boundary. The overall footprint and dimensions of the building would remain the same. Minor changes are proposed to window and door openings to reflect the revised layout including the relocation of the two large roller shutter doors from the front elevation to the east facing side elevation and an additional first floor window and emergency exit to the rear elevation.

3.3The Committee resolved to approve the previous application at the September 2017 meeting. However, as the previous application was considered to be a departure from national and local Green Belt policy it was referred to the Secretary of State for consideration as a possible ‘call- in’ prior to the decision being issued. The Secretary of State decided not to call in the application and it was therefore approved.

3.4The application, the details attached to it, including the plans, comments made by residents and the responses of the consultees can be found on the Council’s website at:

http://planning.highpeak.gov.uk/portal/servlets/ApplicationSearchServlet?P KID=229335

4. RELEVANT PLANNING HISTORY

4.1The following is a summary of the most recent planning applications relating to the site.

HPK/2017/0162 – Removal of existing containers & replaced by new two storey storage building with offices above – Approved 05/10/2017.

http://planning.highpeak.gov.uk/portal/servlets/ApplicationSearchServlet?P KID=215169

NMA/2018/0031 – Non material amendment in relation to HPK/2017/0162 – Refused 23/10/2018.

http://planning.highpeak.gov.uk/portal/servlets/ApplicationSearchServlet?P KID=227630

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
HPK/2018/0597 Unit 4, Hague Bar Works, Hague Bar, New MillsReport 148 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

13 of 24 attended
DL
Councillor David LomaxChair, present
ET
Councillor Emily ThraneVice-Chair, present
AB
Councillor Alan BarrowCommittee Member, apologies, sent representative
LD
Councillor Lance DowsonCommittee Member, apologies
CH
Councillor Caroline HoweCommittee Member, present
JK
Councillor John KappesCommittee Member, present
AM
Councillor Anthony McKeownCommittee Member, present as substitute
RM
Councillor Robert McKeownCommittee Member, present
GO
Councillor Graham OakleyCommittee Member, present
JP
Councillor Jim PerkinsCommittee Member, present
PR
Councillor Peter RobertsCommittee Member, present
KS
Councillor Kath SizelandCommittee Member, present as substitute

All 24 on the meeting page

On this subject at High Peak

Search all
  1. HPK/2018/0597 Unit 4, Hague Bar Works, Hague Bar, New MillsThis decision
  2. HPK/2024/0481 - Glossopdale Community College, Lower Site, Talbot Road, GlossopRefused
  3. HPK/2025/0206 - Glossop Community Sports Hub, Cemetery RoadApproved
  4. HPK/2023/0352 - Unit 11, Diamond Hill, Harpur Hill Business Park, Harpur Hill, Buxton, Derbyshire SK17 9USApproved
  5. HPK/2022/0344 - Glossopdale Community College Lower Site, Talbot Road, Glossop, Derbyshire, SK13 7DRRefused
  6. HPK/2021/0707 - Land adjacent to Unit 18, Tongue Lane Industrial Estate, Dew Pond Lane, Fairfield, BuxtonApproved

More from High Peak Development Control Committee

All decisions
MeetingDecisionOutcome
10 Aug 2026 Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. Approved Open
10 Aug 2026 Update SheetThat the update sheet be noted. Noted Open
10 Aug 2026 Planning ApplicationsThat the report be noted. Noted Open
10 Aug 2026 HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... Approved Open
10 Aug 2026 HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies