HPK/2018/0426 Tom Wood, Start Lane, Whaley Bridge - retention of engineering operations and proposed building for woodland management

Refused Planning 1 paper

Development Control Committee refused this item on Monday 20 May 2019. Below is the council's own wording, with the papers it was decided on.

Item20/5

Resolved

That planning permission be refused as set out in the report; 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Operations Manager – Development Services be delegated authority to do so in consultation with the Chair of the Development Control Committee, provided that the changes do not exceed the substantive nature of the committee’s decision.
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Development Control Committee

HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE

Date 20th May 2019

Application HPK/2018/0426 No: Location Tom Wood, Start Lane, Whaley Bridge Proposal Retention of engineering operations and proposed building for woodland management Applicant [name removed] N/A Parish/ward Whaley Bridge Date registered 20/09/2018 If you have a question about this report please contact: Faye Plant, - Email [email protected] Tel: 01538 395400 Ext: 4995; Mob: [phone removed]

REFERRAL

The application has been referred to the committee due to the level of public interest.

1. SUMMARY OF RECOMMENDATION

REFUSAL

2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS

2.1The application site is an ‘L’ shaped undulating parcel of land and ancient woodland known as Tom Wood, formally named Scar Wood. The site comprises 3.5 hectares of mainly woodland located on a steep south facing slope located above Todd brook, which feeds Todd Brook reservoir to the west. To the north of the site the land levels out and slopes to the south east where a track has been made outside of the wooded area leading to the access point on to Start Lane.

2.2The woodland is a designated Ancient Woodland and forms part of a Derbyshire Wildlife Site that covers Scar Wood and Todd Brook. The site is within the Green Belt and Countryside, and forms part of the Settled Valley Pastures landscape character area as defined in the High Peak Local Plan.

3. DESCRIPTION OF THE PROPOSAL

Background 3.1 Without planning consent engineering operations have taken place on site to create a levelled area of parking close by the site entrance, an extension to an existing track way through the site, and land cutting and levelling to create a series of level platforms. There are also 2 sheds on site, a moveable timber hut/sauna, and various other items such a picnic benches, a bath, water butts and solar lights. An application to retain the developments on site was invited following a complaint to the enforcement service.

3.2The application originally sought consent for the retention of 2 sheds, a moveable hut and the engineering operations to create the bays within the site. It was also proposed to erect an additional shed within the site.

3.3The applicant has stated that the works are required for a wider woodland management plan; the principle aim being the removal of rhododendron from the site which is an invasive non-native species. The engineering works to the north east section of the site are adjacent to the woodland and were undertaken in 2018 to provide level platforms for a contractor to chip rhododendron which had been cleared from the woodland by the applicant. The applicant has indicated that this is temporary land adjustment. Two sheds were put on the land for the storage of tools and equipment. An additional shepherd hut/sauna was moved onto the land to provide refreshments. Picnic tables, water butts, and solar lights were also brought on to the land which the applicant states are for sanitation, refreshments and to provide light for a possible evening event. A woodland management plan accompanied the application and outlined a 5 year plan to remove rhododendron from 2.5ha of woodland on the site.

The current proposal

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
HPK/2018/0426 Tom Wood, Start Lane, Whaley Bridge: retention of engineering operations and proposed building for woodland managementReport 245 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

12 of 22 attended
RM
Councillor Robert McKeownChair, present
DL
Councillor David LomaxVice-Chair, present
AB
Councillor Alan BarrowCommittee Member, present
LD
Councillor Lance DowsonCommittee Member, present
CF
Councillor Charlotte FarrellCommittee Member, present
IH
Councillor Ian HuddlestoneCommittee Member, present
GO
Councillor Graham OakleyCommittee Member, present
JP
Councillor Jim PerkinsCommittee Member, present
PR
Councillor Peter RobertsCommittee Member, present
ET
Councillor Emily ThraneCommittee Member, present
JT
Councillor Jean ToddCommittee Member, present
SY
Councillor Stewart YoungCommittee Member, present

All 22 on the meeting page

On this subject at High Peak

Search all
  1. HPK/2018/0426 Tom Wood, Start Lane, Whaley Bridge - retention of engineering operations and proposed building for woodland managementThis decision
  2. HPK/2026/0162 - Market Hall, Market Place, Glossop - Listed Building Consent application for installation of automatic opening vents and installation of 8no louvred smoke ventsApproved
  3. HPK/2024/0438 - Land adjacent to No.22 Spinnerbottom, Birch ValeRefused
  4. HPK/2021/0020 - Ferney Bottom Farm, Grinlow Road, Harpur Hill, Buxton, Derbyshire, SK17 9JHApproved
  5. HPK/2021/0020 - Ferney Bottom Farm, Grinlow Road, Harpur Hill, Buxton, Derbyshire, SK17 9JHDeferred

More from High Peak Development Control Committee

All decisions
MeetingDecisionOutcome
10 Aug 2026 Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. Approved Open
10 Aug 2026 Update SheetThat the update sheet be noted. Noted Open
10 Aug 2026 Planning ApplicationsThat the report be noted. Noted Open
10 Aug 2026 HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... Approved Open
10 Aug 2026 HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies