That planning permission be refused as set out in the report; and 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions/informatives/planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
Date 24th February 2025
Application No: HPK/2024/0438 Location Land adjacent to No.22 Spinnerbottom, Birch Vale Proposal Retrospective full planning permission for 2no. outbuildings Applicant [name removed] [name removed], Walsingham Planning Parish/ward New Mills / Sett Ward Date registered 08/11/2024 If you have a question about this report please contact: James Stannard, Tel. 01298 28400 extension 4298, [email protected]
1. SUMMARY OF RECOMMENDATION
Refuse
1. REASON FOR COMMITTEE DETERMINATION
1.1This application has been brought before the Development Control Committee by Councillor Inman, who contends that the development is acceptable within its location including the Green Belt.
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The application site refers to a parcel of land that lies to the south west of Spinnerbottom and a row of split level terraced properties including No.22 Spinnerbottom, in Birch Vale.
2.2Whilst all land contained with the site is within the control of the applicant, the site is not situated within the domestic curtilage associated with the main residential property.
2.3This judgement has been established by the conclusions of an Inspector in a recently dismissed Appeal (APP/H1033/X/23/3327762) whereby the applicant sought to establish via an application for a Certificate of Lawful Development under HPK/2022/0308 that the two outbuildings located on the site subject of this application were within the residential curtilage, thus benefiting from permitted development rights, and therefore did not require planning permission.
2.4For clarity, the Inspector concluded that buildings require planning permission owing to the fact that they do not fall within the residential curtilage of No.22 Spinnerbottom as a matter of fact and degree.
1 2.5 The two buildings are shown on the submitted Plans, with the larger building situated on the lower flatter part of the site marked as Building ‘A’ with a smaller structure situated on an area of raised banking adjacent to the public highway marked as Building ‘B’.
2.6Despite not being situated within the residential curtilage of the dwellinghouse, both buildings are understood to be in uses incidental to the enjoyment of the dwellinghouse.
2.7The supporting Cover Letter notes that the site was formerly home to 5no. buildings, which served as a combination of sheds and garages, as per the historic map understood to date from 1968 (Appendix 2).
2.8Appendix 3 of the Cover Letter contains photographs of the historic buildings, although it should be noted that only one of these photographs is date stamped, and therefore the date of each photograph cannot be fully validated. Historic images from Google Earth and Google Street View are provided at Appendix 4 of the Cover Letter.
2.9The supporting Cover Letter states that the applicant began to remove these structures in 2015, with the construction of Building ‘A’ commencing in 2019, with the construction of Building ‘B’ started in 2021, both building completed in that year. Owing to the fact that the former garages have been removed, it is not possible to ascertain their individual and cumulative footprint and volume.
2.10The following images show the site as it stood in 2011, how it stood in 2018 and how the site appears in 2025:
2 Above: Site as it stood in 2011, showing small scale structures in south-western corner of the site, and an undisturbed natural raised banking
Above: Site as it stood in 2018, showing two of the original building remaining in situ, with the area earmarked for Building ‘B’ now visible
Above: Site as it stands in 2025, showing the erection of Building ‘A’ on the flatter ground with Building ‘B’ in situ norther of it on the raised banking area.
2.11Following an enforcement complaint and subsequent investigation in 2021, the applicant was asked to submit an appropriate planning application and has sought to regularise the two buildings.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.