CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
High Peak Borough Council
Development Control Committee, Monday 20 January 2020 at 1.30pm

Update Sheet

Noted Planning 1 paper

Development Control Committee noted this item on Monday 20 January 2020. Below is the council's own wording, with the papers it was decided on.

Item20/68

Resolved

That the update sheet be noted.
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Development Control Committee

20th January 2020

HPBC DEVELOPMENT CONTROL COMMITTEE

UPDATES SHEET

HPK/2019/0466 – Hayfield Campsite

No updates to report.

HPK/2019/0280 – Land between 15 and 23 Batham Gate Road, Peak Dale

Additional information received from Applicant:

The applicant has submitted an updated site plan showing the location of the proposed substation within the area of public open space and indication of the proposed affordable housing plots.

In order to address deficiencies in minimum floor area standards for bedroom sizes, the applicant has submitted revised house type drawings which change some of the bedrooms previously indicated as being double bedrooms to single bedrooms.

Housing Officer:

No objection to the additional information detailing the affordable housing proposals.

DCC Flood Risk Management Team additional comments:

The Flood Risk Management Team has reviewed the applicant’s drainage strategy report and raises no objection, subject to conditions requiring submission of the following:  Detailed design and associated management and maintenance plan of the surface water drainage for the site.  Details indicating how additional surface water run-off from the site will be avoided during the construction phase.

Officer comment:

As noted above, revised house type drawings have been submitted. These show internal changes to the layout of the dwellings only and do not alter the external appearance of the properties. In summary, the revised house types show that some of the bedrooms previously indicated as double bedrooms would instead be single bedrooms.

The floor plans submitted for each of the proposed house types (as revised) have been assessed against the Nationally Described Space Standards (NDSS) published by DCLG in 2015. The table below shows that all revised house types meet or exceed the minimum standards and these therefore provide an acceptable standard of accommodation. The single bedrooms within House Types B and D1 are approx. 6.9 sq.m. and 6.8 sq.m respectively and therefore fall slightly below the minimum standard recommended in the NDSS for single bedrooms which is 7.5 sq.m. Whilst both of these would fall marginally below the standard, the other bedrooms exceed the standards and the overall majority of the dwellings on the development will meet the minimum standards.

Floor DCLG House Type People Bedrooms Storeys Space Standards A 3 2 2 84 70 B (plots 12 & 4 3 2 88 84 26) B (plots 11, 4 3 2 91 84 13, 25, 27) C1 3 2 2 84 70 C1 Splayed 3 2 2 84 70 C2 (plots 7 & 3 2 2 84 70 10) C2 (plots 8 & 5 3 2 93 93 9) D1 (plots 5, 5 3 2 105 93 22 & 23) D1 (plots 6, 5 3 2 107 93 21 & 24) D2 6 4 2 139 106 D3 5 3 2 102 93

The Council’s Housing Officer has confirmed that the affordable housing provision is acceptable.

The additional drainage conditions recommended by DCC Flood Risk Management Team have been added to the recommendation.

It is also recommended that the approved plans condition be amended to include the revised site plan and house type drawings.

ADDITIONAL CONDITIONS:-

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Update SheetReport 82 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

12 of 23 attended
RM
Councillor Robert McKeownChair, present
DL
Councillor David LomaxVice-Chair, present
AB
Councillor Alan BarrowCommittee Member, present
LD
Councillor Lance DowsonCommittee Member, present
CF
Councillor Charlotte FarrellCommittee Member, present
IH
Councillor Ian HuddlestoneCommittee Member, present
GO
Councillor Graham OakleyCommittee Member, present
JP
Councillor Jim PerkinsCommittee Member, present
PR
Councillor Peter RobertsCommittee Member, present
ET
Councillor Emily ThraneCommittee Member, present
JT
Councillor Jean ToddCommittee Member, present
SY
Councillor Stewart YoungCommittee Member, present

All 23 on the meeting page

On this subject at High Peak

Search all
  1. Update SheetThis decision
  2. Update SheetNoted
  3. Update SheetNoted
  4. Update SheetNoted
  5. Update SheetNoted
  6. Update SheetNoted

More from High Peak Development Control Committee

All decisions
MeetingDecisionOutcome
10 Aug 2026 Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. Approved Open
10 Aug 2026 Update SheetThat the update sheet be noted. Noted Open
10 Aug 2026 Planning ApplicationsThat the report be noted. Noted Open
10 Aug 2026 HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... Approved Open
10 Aug 2026 HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies