That planning permission be granted as set out in the report, subject to: ( i ) an additional condition around the landscaping proposals 2. In the event of any changes being needed to the wording of the committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Development Control Committee, provided that the changes do not exceed the substantive nature of the committee’s decision.
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
Date 29th June 2020
Application HPK/2020/0102 No: Location High Peak Golf Course, Waterswallows Road, Fairfield Buxton, Derbyshire Proposal Local changes to the existing golf course, including construction of 2 new golf greens (to replace 2 existing greens) and 5 new golf tees. Creation of golf features (small grass mounds/hollows). Local landscape planting. Minor drainage works and creation of ditch Applicant High Peak Borough Council Agent [name removed], STRI Parish/ward Barms Date registered 31st March 2020 If you have a question about this report please contact: Jane Colley, [email protected] Tel: 01298 28400 ext. 4981
REFERRAL
This application has been brought before the Development Control Committee as it involves development on Council owned land.
1. SUMMARY OF RECOMMENDATION
Approve, subject to conditions.
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The golf course is located to the north of Buxton and is dissected by the A6. It is an extensive area of open land either side of the road, covering approximately 24 hectares of land. Throughout the site are a number of matures trees, the most important being the avenue of trees which align either side of the A6.
2.2Footpath HP4/2/1 runs through the western segment of the Golf Course in a north/south direction. A right of way dissects the eastern side of the golf course in a diagonal alignment.
3. DESCRIPTION OF THE PROPOSAL
3.1This application seeks planning permission to alter and amend a number of existing tees, greens and minor drainage works. In summary the proposals comprise:
1 Hole 2 – Development of a new tee (min 5 x 8m) and extend hole by 20m. Infill rough hollow (quarry area) to hole 2.
Hole 9 – Tee to be extended by 15m maintaining the tee at the same level.
Hole 10 – This will be shortened. The tee will be moved forward of the current access road to leave sufficient room behind for a new hedge. Tee to be raised from ground level by 300mm. Green to be moved back by 10m and be a two tier green. Additional planting through the right hand side of the hole will screen and partially protect the A6. Additional planting to the back of the green will supplement the existing and screen hole 9.
Hole 14 – Move the green back by approximately 20m nearer the tee with additional bunkers. A substantial belt of trees to be introduced around the back of the green to provide a good visual backdrop to the green and protection from the road. Additional lower level shrub planting (green side) to provide additional screening. Form a ditch through the existing valley to hole 14 to help drainage and add to the challenge of the hole.
Hole 15 – Relocation of the tee forward that will shorten the hole by approximately 22m with screening at the rear of the tee with an instant 2m hedge. A fence may be added for additional security and noise suppression. The difficulty of the hole would be maintained through additional grass mound and hollows both sides of the fairway where it narrows and revisions to the bunkering at the green.
Hole 16 – Additional tee area to be developed to the rear of the existing by filling with inert material, with increase in elevation (+0.5m) above existing tee surface level.
3.3New screening by way of new trees, hedgerows and “living” walls will provide acoustic barriers to Holes 14 and 15, which will be positioned close to the new link road and roundabout. New drainage is proposed through the provision of new pipes to direct water to infiltration basins/soakaways or ponds (Pells Dam). It is not to proposed to increase the rate of drainage discharge from the site, and will remain at comparable to existing greenfield run off rates.
3.4The application is accompanied by a topographical survey of those tees affected by the proposals, a Design and Access Statement, Heritage Statement and an Ecological Survey.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.