That the application be approved as set out in the report, subject to: ( i ) the revised wording of the contamination condition, and an additional requirement that within 3 months of the date of this consent a verification report demonstrating completion of the works set out in the approved remediation strategy and the effectiveness of the remediation shall be submitted to and approved in writing by the LPA. The report shall include results of sampling and monitoring carried out in accordance with the approved verification plan to demonstrate that the site remediation criteria have been met. It shall also include and plan (a “long-term monitoring and maintenance plan”) for longer-term monitoring of pollution linkages, maintaining and arrangements for contingency action, as identified in the verification plan, and for the reporting of this to the LPA. The long-term monitoring and maintenance plan shall be implemented as approved. 2. That in the event of changes being needed to the wording of the committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the committee’s decision.
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
29th June 2020
Application HPK/2019/0004 No: Location The Crescent, Buxton, SK17 6AY Proposal Removal / variation of conditions relating to HPK/2011/0322 and HPK/2014/0352 Applicant Buxton Crescent Hotel and Thermal Spa Company Ltd Agent [name removed]/Parish Date registered If you have a question about this report please contact: Lisa Howard [email protected] 01538 395400 ext. 4923
1. REFERRAL
The application is referred to the Development Control Committee because it is a major development.
SUMMARY OF RECOMMENDATION
APPROVE subject to conditions
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The Crescent was built between 1779 and 1790 immediately to the east of the natural baths which were constructed in 1712. The purpose of The Crescent was to form appropriate accommodation for visitors coming to take the waters and was an attempt to compete with the then fashionable spa bathing in Bath, the only other thermal spa in the country. The Crescent was designed by John Carr as an 18th century leisure complex which is believed to have originally comprised of two hotels situated at either end of the Crescent and six lodging houses.
2.2The Hotel was a very new form of building taking over from Inns as places of leisure and accommodation and it is significant that the difference between a Hotel and previous forms of accommodation was the inclusion of public ‘assembly rooms’. Though many adaptations have occurred within the Crescent to support the demands of bathrooms facilities and catering, the fabric of the Crescent has remained substantially intact.
2.3The Pump Room was designed by Henry Currey and was constructed I the late 19th Century. With the exception of the enclosure of the arcade to the front and the later removal of the two domes, the building has largely remained unaltered.
2.4In 1937 the new baths were again reconstructed at a cost of 20,000 including new Entrance Hall of red and white marble and a panelled oak rest room
1 incorporated into the centre of the baths. The Natural Baths continued to be enjoyed until their eventual closure in 1972 when the new swimming pool, Buxton Leisure Centre, were opened.
2.5Following the closure of the baths for public bathing in 1972 the buildings have in recent years been used as the Tourist Information Centre. Other parts of the Natural Baths have stood empty. The only use of the spa itself being the extraction of water for bottling, for the Devonshire hospital and to supply water to the modern swimming pool.
2.6The Pump Room was last used as a museum (the Micrarium) which closed in 1996.
2.7More recently, works in associated with Planning and listed Building Consent for the restoration and reuse of the historic buildings as a spa hotel have commenced and are reaching imminent completion.
3. DESCRIPTION OF THE PROPOSAL
3.1This application seeks approval for the variation / removal of conditions in respect of Planning reference HPK/2011/0322 and HPK/2014/0352. This application has arisen owing to working amendments that have arisen during the project due to the age and condition of the building. Conditions that are sought to be removed are done so either on the grounds that they are no longer applicable to the approved scheme or the relevant aspects of the development that are reserved by condition have been completed in accordance with the prior approval of the Consents Group, which includes, inter alia, representatives from Historic England, Derbyshire County Council and the Local Planning Authority.
3.2The following amendments are sought to the approved plans:
Public rooms east pavilion Removal of modern floorboards and replacement with historic floorboards Removal of fire screen
Basement Visitor Experience fit out to include closing in of the door and window openings and introduction of level access platform;
Ground floor Retain large window to life lobby
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.